The Consequences Of Block Size Decisions In Ore Body ModellingBy Donald E. Hulse
Selection of a block size for a computerized 3 dimensional ore body model is an exercise in compromises. Larger blocks decrease the use of computer resources and decrease the variance of the block est
Jan 1, 1992
-
Analysis Of Grinding Actions Of Ball Mills By Discrete Element MethodBy Katsunori Okaya, Toshio Inoue
Application of the discrete element method incorporating the simple kinetic model of the ball-to-ball and ball-to-wall interactions enables us to visualize the details of the grinding actions prevaili
Jan 1, 1995
-
Three Dimensional Numerical Modelling Of Air Velocities And Dust Control Techniques In A Longwall FaceBy N. I. Aziz, B. Srinivasa Rao, R. N. Singh
The control of respirable dust and its subsequent exposure to miners is essential for improved safety in longwall mining. The extensive variation in face conditions and operations of longwall make num
Jan 1, 1993
-
Methane Dilution Using High Volume Scrubbers in a Continuous Miner SectionBy James Veri, Andrew H. Stern, Gerald N. Torbert
When mining coal, the occurrence of high methane liberation rates can often overwhelm the existing ventilation capabilities of the working place and result in elevated levels of methane gas. These “ga
Jan 1, 1997
-
Characterization And Flotation Of Gold In Carbon Fines At The Fort Knox Mine, AlaskaBy D. E. Walsh, J. T. Hollow, H. K. Lin, J. L. Oleson
At the Fort Knox Mine, Fairbanks, Alaska, carbon fines are generated during stripping, acid washing and kiln regeneration operations. Because of their gold value, carbon fines are collected by a filte
Jan 1, 2003
-
Network conditions that ensure correct prediction of airflow direction when developing connecting airwaysBy J. M. Mutmansky, Y. J. Wang
The method usually used to predict the direction of flow in a connecting airway is to conduct a survey of the two existing nodes to be connected by the new pressure airway. It is then assumed that the
Jan 1, 2000
-
Applications Of The Seismic Interactive Interpretation Workstation For The Coal IndustryBy L. M. Gochioco
The Seismic Interactive Interpretation Workstation (S//W) provides a wide spectrum of utilities ranging from improving field acquisition techniques, data processing and interpretation of coal seismic
Jan 1, 1992
-
Performance factors of the bucket wheel excavator systemsBy T. S. Golosinski, J. Wolski
Procedures are presented for determining the hourly production rate, mechanical and physical availability, utilization, use of availability, and global performance factors for the bucket wheel excavat
Jan 1, 1987
-
Beneficiation Of Carbonate Rich Saudi Phosphate RocksBy R. F. Al-Fariss
The phosphoric acid industry is expected to develop in Saudi Arabia in the near future. There are three main reasons for expecting this: the discovery of phosphate deposits in the Sirhan-Turayf regio
Jan 1, 1993
-
Technical Note: Process Mineralogy Of The Ishiagu Lead-Zinc Deposit, NigeriaBy G. G. O. O. Uwadiale, E. G. Okafor
A study was performed to characterize the Ishiagu lead-zinc deposit prior to beneficiation. The study included the use of XRD, SEM and both reflected- and transmitted-light microscopy. The results sho
Jan 1, 1998
-
New Approach To Determine The In-Situ Strength Of Coal In Mine PillarsBy E. D. Thompson, Y. J. Zhang, K. F. Unrug
This paper presents the results of a recent study on the development of an in situ testing method for determining coal strength in mine pillars. The strength testing is performed in the horizontal hol
Jan 1, 1997
-
Power Consumption Of Stirred Media MillsBy P. Somasundaran, C. C. Harris
The power consumption of stirred-media mills was studied using an approach developed from work on stirred reactors. Evaluated were the relationships of factors such as stirring speed and impeller and
Jan 1, 1996
-
Advances In Gold And Silver Leaching Practice - Chemical And Physical FactorsBy Milton E. Wadsworth
Cost effectiveness in gold and silver leaching has centered mainly on reducing or preventing excessive use of lixiviants. In cyanide leaching practice, the active reactants, cyanide and oxygen, presen
Jan 1, 1995
-
An Example Of Classification Of Reserve Types By Historical Input To Geostatistics And Other Considerations In Defining OreBy D. E. Ranta, Leigh A. Readdy
Defining classes of ore using geostatistical methods that match historical classifications has presented problems in the past. A simplistic and practical approach to this problem is presented. An exam
Jan 1, 1992
-
Geologic And Geostatistical Applications To Mine Production At Inspiration (b50c979d-6a3c-4a01-aca1-d7f161a2cdbe)By R. A. Metz, James W. Clark, William C. Dixon, Kevin L. Wiley, Thomas R. Couzens
This paper is a description of certain geologic aspects of the Inspiration mining operation. It is not a geologic description of the Inspiration deposit nor an exposition of all the geologic work invo
Jan 1, 1992
-
5. Optimizing the Short-Term Production Schedule for an Open-Pit Iron Ore Mining Operation ? IntroductionBy F. L. Wilke
Bong Mining Co. Ltd. in Liberia, West Africa, operates an iron ore open pit some 60 miles northeast of Monrovia. The production is at present about 40,000 t/d (metric tons/day) from which about 18,500
Jan 1, 1979
-
Non-intrusive safety-and- training sample strategy for the continuous miner worksiteBy C. J. Bise
Continuous mining accounts for about 69% of the nation's underground coal production. This level is not expected to change much in the near future. This is because continuous mining represents th
Jan 1, 1991
-
Engineering And Cost Analyses Of Coal Combustion Byproduct Transportation And Handling SystemsBy D. D. Lei, H. Sevim, S. M. Gwamaka
Three transportation and handling alternatives for delivering dry coal combustion residues from power plants to underground coal mines were evaluated both technically and economically. The objective w
Jan 1, 1998
-
Geological Computer Applications in the Uranium IndustryBy David J. Dyet
Computer applications in the past five to seven years have become a typical and necessary practice in most modern geological offices. Manual calculations, interpretations and plotting of data can be,
Jan 1, 1996
-
Portland, Oregon’s Alternative Contract Approach—A Work in ProgressBy Paul Gribbon, Greg Colzani, Jim McDonald
The $300 million West Side Combined Sewer Over?ow Project consists of over5.5 kilometers of soft ground tunnel, an 833-million liter per day (220-MGD) deep shaft pump station, 3 kilometers of micro tu
Jan 1, 2005