Horizontal Stress Control In Underground Coal Mines (1dbd7295-90f8-4003-a003-9120dc19934c)By S. M. Matthews
The magnitude and orientation of the in situ stressfield has been determined as a key factor in controlling the stability of openings for both coal mine development and extraction. Monitoring of roadw
Jan 1, 1992
-
GIS Supported Evaluation of Surface Level Impacts Due to Abandoned Near?Surface Mine LocationsBy Alexander Kattner
Surface fractures in urbanized areas show the risk potential of near-surface mining. This kind of mining subsidence damage occurs mainly in areas where hard coal was mined near the surface with very l
Jan 1, 2011
-
Analysis of Panel Stability for Post-Mining Slurry InjectionBy Tim Ross
Slurry injection into mined-out panels is an attractive alternative for disposal of coal preparation plant fines. however, in areas where surface subsidence cannot be tolerated, either by law or neces
Jan 1, 1998
-
Behavioral Aspects of Roof/Rib Injuries--Implications for Training Utilizing Stereoscopic PhotographyBy Edward A. Barrett
A significant number of injuries resulting from fa118 of roof and rib may be avoided by modifying the reactive behavior of miners as they encounter potentially hazardous ground conditions. In 1984-85,
Jan 1, 1986
-
First Caving And Its Effects--A Case StudyBy S. M. Hsiung
In late September 1984, a longwall panel in West Virginia lost 60 powered supports when the face had advanced for 250 ft. from the setup entry. An in-mine investigation showed that it was a first weig
Jan 1, 1984
-
Cutable and Variable Yield Cement Cribbing Successfully Support 84 Mine Longwall Cut Through EntriesBy William Bookshar
The development of increasingly more sophisticated and powerful retreat longwall equipment has led to ever wider and longer panels. To maximize gateroad development efficiency, provide for effective f
Jan 1, 1998
-
Overview of Safety Considerations with Highwall Mining OperationsBy George Gardner
The rapid growth of highwall mining in the Appalachian coalfields has resulted in unique safety concerns. Due to the concentration of activity at the base of the highwall and the potentially destabili
Jan 1, 2002
-
Computerised Subsidence And Displacement Prediction Using Influence Function MethodsA computerised influence function approach to subsidence and horizontal displacement prediction is described, with particular emphasis being placed on the applicability of the method to irregular- sha
Jan 1, 1988
-
An Engineering Analysis Of "Squeeze" Failure Of Pillars In The Pittsburgh Coal BedBy George Mishra
In mid-1979, J&L Steel Corporation experienced rapid failure of pillars after only two weeks' operation with a combination of full retreat and partial mining in the 154 Road Section of its Nemaco
Jan 1, 1981
-
Ground Control In Multiple Seam MiningBy Robert A. Stansbury
The No. 14 Mine of United States Steel Corp- oration is located at Munson, West Virginia, in &Dowell County. The mine was originally assigned 7,530 acres of Pocahontas 3, 4 and 5 Seams. Production beg
Jan 1, 1981
-
Mine Panel Collapse - Two Case StudiesBy Hanjie Chen
A mine panel collapse may occur when pillar sizes are too small or the surrounding rock strata (roof or floor) yields. After a small pillar fails, its loading is rapidly transferred to adjacent pillar
Jan 1, 1999
-
Polymer Membrane Liners In Underground Coal Mines - Ground Control For The Millenium?By David C. Laurence
in March 1999, the School of Mining Engineering at the University of New South Wales carried out a series of underground trials using " Evermine", a South African developed two-part water based polyme
Jan 1, 2000
-
State Of The Art Testing Of Powered Roof SupportsBy Robert C. Garson
The Mine Roof Simulator at the DOE'S Mining Equipment Test Facility is described. Its use in the research and development on the behavior and response of longwall roof supports to simulated mine
Jan 1, 1982
-
Characterization Of Overburden Response To Longwall Mining In The Western United StatesBy Khamis Y. Haramy
The U.S. Bureau of Mines installed surface and subsurface instruments at a mine site in Colorado to monitor and characterize the overburden response to longwall mining. Instrumentation included a time
Jan 1, 1992
-
Controlled Thrust And Torque Placement Of Mechanical Anchor Bolts And Their Relationship To Improved Roof ControlBy Anil Mahyera
Under contract to the Bureau of Mines, a roofbolting machine has been developed which will: control torque on the bolthead to within 4 percent of a set point, control thrust to a low level (150 lbf),
Jan 1, 1981
-
Manifestation Of Mine Pressure And Its Relations To Overlying Strata MovementsBy Z. C. Song
[THIS PAPER WAS TRANSLATED FROM CHINESE TO ENGLISH BY S. S. PENG, WEST VIRGINIA UNIVERSITY] Immediately after coal extraction, the pressure that causes the movement of the surrounding strata is c
Jan 1, 1982
-
Assessment Of Wood And Alternative Materials For Supplemental Roof Support ConstructionBy Thomas M. Barczak
The engineering of a support system is driven largely by economics. The goal is to provide effective support at minimal cost. For this reason, wood has been extensively used as a support material for
Jan 1, 1994
-
A Cooperative Study Of Gate Entry Designs Welbeck Colliery (UK) And Jim Walter Resources (USA)By Greg Hendon
Longwall developments in the UK have historically consisted of single entry gate roads. Adjacent developments were separated from existing panels by large barrier pillars (designed of sufficient width
Jan 1, 1995
-
Empirical and analytical design of large openings at a proposed national underground science laboratoryBy Karl Jr. Zipf
The famous Homestake gold mine in Lead, SD. closed recently alter 125 years of operation. However, the mine may receive a new lease on life as a National Underground Science Laboratory (NUSL) supporte
Jan 1, 2002
-
Stability Evaluation Of Alternative Designs Of Drift-And-Fill Stoping In Zhaoyuan Gold Mine, P. R. ChinaBy Xianming Zhou
Mining economics is such that too conservative in safety will result in a considerable penalty in mining cost. However, initial planning and design of a mining project often must be done without compl
Jan 1, 1989