Search Documents

Search Again

Search Again

Refine Search

Publication Date
Clear

Refine Search

Publication Date
Clear
Organization
Organization
  • SME-ICGCM
    Longwall Shield Recovery Using Mobile Roof Supports (64264c53-830d-4e84-b91e-78532103884a)

    By Frank Chase

    Longwall mining has gained the reputation as being the safest extraction method in underground coal mines. However, one of the most difficult tasks associated with longwall mining is moving the face

    Jan 1, 2007

  • SME-ICGCM
    Innovation In Control Of Geomechanical State Of Undermined Rock Mass And Deformations Of Earth Surface

    By F. N. Voskoboyev

    The suggested new method for control of geomechanical state of undermined rock mass ensures, as a safety measure for the earth surface protection, the decrease of deformations by 2,5 - 10 times in min

    Jan 1, 1996

  • SME-ICGCM
    Multiple Seam Mining Feasibility in the Illinois Basin (USA): LaModel Stress Analysis Programs

    By Rebecca Hardy

    The escalating demand for coal, in addition to the steady depletion of reserves, has produced increasingly difficult mining conditions for coal mining companies within the United States, resulting in

    Jan 1, 2006

  • SME-ICGCM
    High Horizontal Movements In Longwall Gate Roads Controlled By Cable Support Systems

    By Dennis R. Dolinar

    Controlling coal mine roofs subjected to high-horizontal stress conditions has always been difficult and uncertain. Traditional supports such as wooden cribs and posts, concrete donut cribs, and stand

    Jan 1, 1996

  • SME-ICGCM
    Subsidence Control Over Abandoned Mines

    By Victor V. Nazimko

    Long term stability of the pillars that have been remained after R&P extraction causes postponed subsidence. To prevent unforeseen subsidence and to diminish postponed subsidence 25-50% new method for

    Jan 1, 1996

  • SME-ICGCM
    Probabilistic Analysis of Blasting Impact on Open Pit Stability (95ce6127-68ed-453f-9268-476a1af1dd45)

    By Dae S. Young

    A new probabilistic approach is introduced for slope stability analysis including adverse impact of blasting vibrations. The material strength within a slope area is randomized in this bi-variate join

    Jan 1, 1984

  • SME-ICGCM
    Improvement in Roof Support Systems at a New Underground Coal Mine Developed from Open-Cut Highwall in Indonesia

    By Takashi Sasaoka

    Indonesia is the second largest coal exporter to Japan, accounting for about 30 M tons annually. They produced about 150 M tons in 2005, over 99% of which being from open-cut mines [1]. However, t

    Jan 1, 2007

  • SME-ICGCM
    Numerical Modeling for Roadway Support Systems ? A Comparison for Single and Multiple Seam Mining

    By Axel Studeny

    Geomechanical-numerical methods are an established tool for planning of underground excavations worldwide. By describing the interaction between heterogeneous layered strata and support elements it is

    Jan 1, 2007

  • SME-ICGCM
    Tensioned Point Anchor Resin System Versus Non-Tensioned Fully Grouted Rebar - Two Case Studies

    By John C. Stankus

    Jennmar Corporation. in an effort to improve mine roof control, has conducted extensive study and research comparing tensioned point anchor resin systems versus the use of non-tensioned fully grouted

    Jan 1, 1990

  • SME-ICGCM
    Assessment of surface fracture depth and intensity due to subsidence over the longwall panel using a sonic technique

    By A. W. Khair

    This paper presents an analysis of fracture depth and intensity due to subsidence over the longwall panel. Sonic reflection techniques were utilized to determine fracture depth, and a variation of p-w

    Jan 1, 1989

  • SME-ICGCM
    Designing for Upper Seam Stability in Multiple Seam Mining

    Historically, the selection of mining sequence for multiple seam conditions has been based on many factors other than ground control considerations and minimization of interaction effects. Today, nume

    Jan 1, 1986

  • SME-ICGCM
    Rock Mechanics And Ground Control For Underground Mining And Construction

    Recent improvements are described in several techniques for ground control in underground mining. Promising methods for analysis and mitigation of rockbursts are discussed. Methods of assessing damage

    Jan 1, 1989

  • SME-ICGCM
    Cable Support Systems For Longwall Gate Road Stability

    By Stephen C. Tadolini

    The U.S. Bureau of Mines, in cooperation with the Cyprus- Plateau Mining Company, has conducted research to provide an alternative to traditional secondary support systems in a two-entry, yield pillar

    Jan 1, 1995

  • SME-ICGCM
    Failure mechanisms in ultra-close seam mining

    By Yingxin Zhou

    Virtually every coal seam in Appalachia will at some time be subject to multi-seam interaction (Wu et al, 1987). Many such problems result from seams which lie in close proximity or have split and lie

    Jan 1, 1989

  • SME-ICGCM
    Stability analysis and characterization of ground subsidence of abandoned lead-zinc mines in northeastern Oklahoma

    By M. M. Zarnan

    This paper presents the results of s study involving characterization of ground subsidence of abandoned lead-zinc mines in northeastern Oklahoma. Two coordinated efforts were undertaken: (1) collectio

    Jan 1, 1989

  • SME-ICGCM
    Improved Source Location And Evaluation Of Seismic Events Over A Deep Coal Mine

    By D. S. Choi

    This paper describes an improved source location technique for microseismic events related to coal mining. A system of non- linear distance equations is solved with the use of the Newton-Raphson metho

    Jan 1, 1990

  • SME-ICGCM
    Subsidence prediction using a laminated linear model

    By Miklos D. G. Salamon

    If all stratifications are horizontal, the computation of surface deformation induced by coal mining involves the prediction of roof and floor convergence and then the transfer of the effects of this

    Jan 1, 1989

  • SME-ICGCM
    Yield Pillar Application Under Strong Roof And Strong Floor Condition - A Case Study

    By P. Tsang

    The mechanisms and functions of yield pillar are analyzed by employing finite element method that takes time dependent and plastic failure of rock into consideration. The design criteria for different

    Jan 1, 1989

  • SME-ICGCM
    Geotechnical Factors Influencing A Time-Dependent Deformation Mechanism Around An Entry In A Dipping Seam

    By M. K. Larson

    The U.S. Bureau of Mines and Cyprus Shoshone Coal Corp. conducted a study of deformation mechanisms in strata around a longwall gate road system at two sites in an underground coal mine near Ham, WY.

    Jan 1, 1996

  • SME-ICGCM
    Major Hazard Risk Assessment Applied To Pillar Recovery Operations (ad413764-c947-4465-9ec3-62ea91281168)

    By A. T. Iannacchione

    Recent fatal injuries occurring during pillar retreat coal mining call for better identification of the hazards and recognition of risks. Ground control hazards associated with room-and-pillar retrea

    Jan 1, 2009