Search Documents
Search Again
Search Again
Refine Search
Refine Search
-
Overcoming Challenges in the Construction of the Dublin Port TunnelBy Tim Brick, Peter Jewell, Stephen Thompson, Simon Morgan
The $980m (€750m) Dublin Port Tunnel, Europe’s biggest urban highway tunnel project, was opened in December 2006. The culmination of this immense scheme is set to transform the environment, mobility a
Jan 1, 2007
-
Acid Recovery in the Steel and Metallurgical Industry Process Characteristics and Fuel Saving OptionsBy F. Baerhold, S. Mitterecker
"Acid recovery is an important process step in pickling and leaching processes. Pyrohydrolysis in spray roasters and fluidized beds is a well-established technology to recover hydrochloric acid, but t
Jan 1, 2016
-
Hard rock tunnel boring, cutting, drilling and blasting: rock parameters for excavatabilityBy K. Thuro, R. J. Plinninger
ABSTRACT: Determining tunnel stability is a key issue during preliminary site investigation. In contrast, problems of excavatability have been largely ignored. While the choice of an economic tunnelli
Jan 1, 2003
-
Shutdown and restart at Pinto Valley - a maintenance viewpointBy Robert S. Shank
Introduction The Pinto Valley open-pit copper mine is located in southern Arizona, 11 km (7 miles) west of Miami. Production at Pinto Valley began in 1974. About 350 Mt (386 million st) of ore and wa
Jan 4, 1985
-
Water and Slurry Bulkheads in Underground Coal Mines: Design, Monitoring, and Safety ConcernsBy S. Harteis, D. Dolinar
Many mining operations rely on bulkheads to provide a barrier between impounded water or slurry and active mine workings. However, bulkhead failures could cause and have caused catastrophic flooding
-
Was that Locked Cycle Test Any Good?By Mike Ounpuu
"Locked cycle testing has become more common practice in the last 10 years. Reasons vary from a desire to avoid pilot plant testing, demand for more variability testing within deposits, and perhaps mo
Jan 1, 2001
-
RI 3506 Studies Of Roof Movement In Coal Mines ? 3. Gibson Mine Of The Hillman Coal Be Coke Co. ? IntroductionBy E. R. Maize
This report is the third of a series on convergence of roof and floor in coal mines and subsidence of surface that accompanies it. The first papery dealt with extraction in a mechanized mine (Montour
Jan 1, 1940
-
Analysis of jig behaviour in coal preparation plants in ChinaA wide-ranging base of jig data was collected from various types of commercial jigs in 9 coal preparation plants in China, and a complete data analysis was made. It was found that the sharpness ofsepa
Jan 1, 1986
-
Enterprise Optimization Releasing Value Through Better Planning DecisionsBy Gerald Whittle
What is Enterprise Optimization? Releasing value through better planning decisions: Philosophy, Methodology, Software The key to 5% -35% increase in enterprise value (NPV) The culmination of 25 yea
May 1, 2010
-
Sidewall Design For Improved Lining Life In A PGM Smelting FurnaceBy I. McDougall
The matte/slag tidal zone in a nickel-copper-iron-sulphide matte smelting furnace is subject to severe process conditions that can lead to premature failure of the lining. The MgO-FeO-SiO2 slag is agg
Aug 1, 2013
-
Vanadio en el Perú (III)By Silvio Hernández Aquije
El presente texto señala el descubrimiento del vanadio en el Perú, así como las cualidades de resistencia que imprime este elemento en los aceros. De otro lado, se menciona la clasificación que hizo L
May 1, 1955
-
Underground Milling of Uranium OresBy Chuck Edwards
"Cameco operates the high-grade McArthur River uranium mine in northern Saskatchewan, and is constructing the high-grade Cigar Lake uranium mine. Cameco has studied the concept of underground milling
Jan 1, 2007
-
Determination Of Room And Pillar Dimensions For The Oil-Shale Mine At Rifle, ColoradoBy Fred D. Wright, Philip B. Bucky
FOREWORD By E. D. Gardner[$] THE present known petroleum reserves are limited, and unless important new fields are discovered the Nation will be dependent, in the not too distant future, upon im
Jan 1, 1947
-
Developing Maintenance Plans Designed to Reduce Efficiency Losses in Fired EquipmentBy Jason J. Ballentine
This case study presents the results of a maintenance review of a soot blower system at a coal fired power generation station. The power generation station was following a ?repair when it breaks? main
May 1, 2007
-
Do All MetPlants Work Well? PlantMets can Ensure They DoBy P Cameron
MetPlant conferences have focused on ensuring mining projects are well designed then optimised to operate safely and effectively at the top end of world’s best practice to ensure shareholders are not
Sep 7, 2015
-
Lateral Capacity Of Rigid Piles In Clays Based On Earth Pressure Concepts - SynopsisBy S. Narasimha Rao
Significant amounts of lateral load may act on pile foundations supporting structures such as transmission line towers, tall structures, bridge abutments, offshore platforms, quay wails, harbour struc
Jan 1, 1996
-
Bias And Error In Mine Project Capital Cost EstimationBy J. Bertisen, G. Davis
Previous analyses of small samples of mining projects have found that feasibility studies tend to well under-estimate the actual capital costs of the project. Our review of 63 mining and smelting pro
Jan 1, 2007
-
Significant Improvements are Possible from Process OptimizationBy Jon R. Maki
"EVTAC, an iron ore mine in Minnesota, had trouble meeting the customer’s pellet silica requirements. In addition, the mine plan was moving towards a lower grade ore and funding was not available for
Jan 1, 2014
-
Educating Mining Engineers OnlineBy Tad S. Golosinski
The paper describes Online Master of Engineering Program at the University of Missouri-Rolla and discusses the experience gained during the first three years of its offering. This innovative education
May 1, 2004
-
Employment opportunities in the coal industryBy T. R. Jr. McMillan
Introduction Examining the short- and long-term job prospects for engineers in the coal industry might include looking at coal tonnage projections, future export markets, federal regulations, and the
Jan 2, 1985