Search Documents

  • ISEE
    Cautious Blasting in Critical Areas at Ramagundam Super Thermal Power Station

    By N. Jayaraman, V. Srikant, A. Radhakrishna

    Addition of a 500 MW unit to the existing units at Ramagundum Thermal Power Station requires blasting of large volumes of rock very close to sensitive installations like Turbo generator, Generator tra

    Jan 1, 2003

  • SME
    Coal’s Role In Sustaining Society – An Integrated-Message Approach

    By R. L. Grayson, J. R. Warneke

    The mining industry has searched for a message that will resonate with the public while focusing on the industry’s positive contributions to society. Thus far environmental groups remain unconvinced,

    Jan 1, 2006

  • NIOSH
    Evaluation Of Support And Ground Response As Longwall Face Advances Into And Widens Pre-Driven Recovery Room

    By Stephen C. Tadolini, Thomas M. Barczak, Peter (Yunqing) Zhang

    A cooperative study was conducted with Emerald Coal Resources, L.P., an affiliate of Foundation Coal Corporation, and the National Institute for Occupational Safety and Health (NIOSH) to evaluate the

  • AUSIMM
    Geological Mapping, GIS, and Mineral Exploration into the 21st Century û The QMAP Programme and Allied Databases

    Geological information is essential for a diversity of public and other purposes, including land use planning, hazard mitigation, and the exploration and sustainable use of natural resources. This is

    Jan 1, 1994

  • CIM
    Latest Fire Protection Innovations for Large-Scale Mining Equipment

    By Don A. Toth

    Until recently, the fire protection systems used to protect mining equipment were based on generically designed, off the- shelf concepts. These systems were reliant on single agent approaches and were

    Apr 1, 2005

  • SME
    TBM Data Management And Quality Assurance For The Brightwater Conveyance Project

    By Jeffrey Mitsopoulos

    King County?s (KC) Brightwater Conveyance Project in Seattle, Washington involves the construction of approximately 21 kilometers (13 miles) of bored tunnel, in three contracts, with four TBM?s which

  • SAIMM
    Electronic Delay Detonators - A Unique Solution To Pertinent Mining Problems (VOLUME 105 )

    By R. Banda

    This paper describes the decision to implement and then the implementation itself, through trials, of electronic ?Smartdets? over previously used shock tubes. It concludes that Mufulira Mine has becom

    Jan 1, 2005

  • AIME
    PART IV - Communications - Contribution to Calorimetric Thermodynamic Analysis

    By B. D. Lichter

    In a previous paper, Oelsen, Schuermann, and Hey-nertl pointed out the possibility of obtaining complete thermodynamic functions for alloy systems from calorimetric measurements alone. Specifically, i

    Jan 1, 1967

  • ISEE
    Physical Interpretation of Free-Surface Ground Motions from Chemical and Nuclear Explosions: (Operational and Synthetic Seismograms)

    By Brian W. Stump

    "Seismic waves from explosions can be used to characterize physical processes in and around the source. The quantification of absolute levels of ground motion is important for minimizing impact on nea

    Jan 1, 1990

  • NIOSH
    OFR-2-77 An Investigation Of The Interaction Of Rock And Types Of Rock Bolts For Selected Loading Conditions

    By Charles J. Haas

    The objective of this research was to investigate the interaction phenomena of rock and types of rock bolts to develop design principals for using grouted roof bolts. The investigation was to determin

    Jan 1, 1974

  • DFI
    Theoretical Examination of Initially Bent Piles

    By Janne P. Isohaka, Anssi M. Laaksonen

    "Abstract In Scandinavia the use of steel pipe piles in bridge foundations started in the mid-1980s and has increased steadily since. As the piles driven in soft soils are slender, they can fail by bu

    Jan 1, 2014

  • CIM
    Operational Improvements in Seven Mineral Processing Plants by Increasing Grinding Circuit “Classification System Efficiency (CSE)”

    By Robert E. McIvor

    "“Classification System Efficiency (CSE)” is a powerful, emerging tool that can be used to increase grinding circuit efficiency. It is defined as the percentage of the ball mill energy being used to g

    Jan 1, 2013

  • SAIMM
    Continuous Blasting Improvements At Landau Colliery ? Synopsis

    By M. Rakoma

    Following the blasting fatality on 17 December 2009, Landau Colliery was forced to change from the blasting practices that had been utilized since the start-up of the mine. Since then, attempts have b

    Jan 1, 2013

  • AUSIMM
    Bulk Density as a Method to Evaluate Reducibility of Hard Hematite Ore in the Direct Reduction Process

    By R J. deMelo, A, V Suckal, R A. Vilela

    Massive hematite ore (MHO) is a special high-grade iron ore used as lump ore in the process of obtaining direct reduced iron (DRI). The influence of porosity on the reducibility was investigated using

    Jan 1, 2002

  • CIM
    Treatment of Carnallite Potash Ores by Selective Flocculation

    By Samantha Beeson, Collin Poole

    "This paper examines the development of two new selective flocculation techniques for recovering KCI values from low grade carnallite potash ore.Direct recovery of KCI was achieved using one of two mi

    Jan 1, 1997

  • DFI
    Piled Foundation Design as Reflected In Codes and Standards

    By Bengt H. Fellenius

    "ABSTRACTAn example from a guidelines document for the Eurocode is discussed that addresses design for geotechnical strength of piled foundations in settling soil, generating drag force and downdrag.

    Jan 1, 2014

  • ABM
    Estudo Termodinâmico E Cinético Da Dessulfuração De Ferro Gusa Utilizando Termodinâmica Computacional

    By Heitor Cristo Clem de Oliveira

    O objetivo deste trabalho é estudar a reação de dessulfuração, envolvidas no processo de pré-tratamento de ferro-gusa. A princípio, as misturas utilizadas foram caracterizadas e estudadas através do s

    Oct 30, 2017

  • CIM
    Pilot-Scale Frother Testing at Highland Valley Copper

    By S. D. D. Welsby

    "A pilot-scale flotation column was used to evaluate four polyglycol frothers at Teck’s Highland Valley Copper Mine. The column was fed with flotation plant feed from the grinding circuit cyclone over

    Jan 1, 2014

  • SAIMM
    Project Report - Pillar Mining At No. 1 And 2 Sub-Shaft On Kloof Gold Mine

    Paper written on project work carried out in partial fulfilment of BSc Engineering (Mining) The aim of this project is to determine whether certain pillars occurring within the no. 1 shaft and no.

    Jan 1, 2005

  • SAIMM
    Towards The 21st Century Workplace

    By G. Taylor

    A 21st Century worker is one who works less with his physical power and more with mental ability. Such a worker is more skilled than a labourer and is consequently rewarded accordingly. A21st Century

    Jan 1, 2000