Search Documents

  • CIM
    Metallurgical Testwork on Harmony Project Ore

    By K. Gie Tan, Frank Wright

    "Misty Mountain Gold Limited (MGL - TSE VSE, MGLCF - NASDAQ) of Vancouver, owns the Harmony Gold Project located in the Queen Charlotte Islands of British Columbia. The deposit contains a mineable res

    Jan 1, 2000

  • DFI
    Design Development & Installation Of Glass Fibre Reinforced Polymer (GRP) "Soft Eyes" In Diaphragm Wall Reinforcement Cages.

    By Paul M. Wiltcher

    This paper discusses how benefits in engineering design can be achieved from combining existing GRP concrete design guidelines with carbon steel design codes primarily made possible due to the increas

    Jan 1, 2006

  • AUSIMM
  • SAIMM
    Importance of failure mechanisms for management of surface instability risk above abandones mines

    By J. P. Josien, Didier C.

    ABSTRACT: France now faces the closure of most of its mining sites. Surface instability risk may sometimes remain, especially where large underground voids exist. This paper illustrates the importance

    Jan 1, 2003

  • SME
    Comparative Real-Time Characterization Of Frother Bubble Thin Films

    By M. Gouet-Kaplan, J. A. Finch, S. Gélinas

    Methylisobutyl carbinol (MIBC) and methoxy polypropylene glycol (Dowfroth 250) bubble thin films were characterized by composition and thickness determinations, using FT-IR spectroscopy and UV-Visible

    Jan 1, 2006

  • DFI
    Defective Piles In Clay - Synopsis

    By S. Narasimha Rao

    Bored cast in situ piles are highly susceptible to construction defects like necking, discontinuity in concreting, poor compaction of concrete, improper end bearing condition due to inadequate cleanin

    Jan 1, 1996

  • NIOSH
    Design Of Underground Openings In Competent Rock - Summary

    By Leonard Obert

    THIS REPORT presents methods and principles useful in designing underground mine openings and pillars in competent rock formations. Two types of formations are considered: (1) Massive formations, in w

    Jan 1, 1960

  • SAIMM
    Tunnel Surface Support - Capacities Of Various Types Of Wire Mesh And Shotcrete Under Dynamic Loading

    The paper deals with the results of dynamic tests carried out on a range of surface support liners consisting of combinations of mesh (various types), shotcrete, and wire rope lacing. The testing was

    Jan 1, 2001

  • CIM
    Evaluation of Level Control System of Cleaner Flotation Columns at Miduk Copper Concentrator

    By M. Massinaei, S. Abasi, M. Oliazadeh

    Reliable measurement and control of the pulp-froth interface (froth depth) in the flotation columns is critical to achieve the desired metallurgical performance. Shallow froths result in a reduction o

    Jan 1, 2019

  • SME
    Using Optimizing Control System At CVRD’s Pelletizing Plants

    By Magno Rodrigues Ribeiro, Alexandre Cabral Stelzer, Cacio José da Silva, Leonardo Nogueira Ferri, Marcelo Ciminelli Mendes, Christophe Bouché, Marco Aurélio Soares Martins, Evenilson Soprani Lopes, José Xavier da Silva Filho, Sérgio Luiz Dalvi

    Since 2001, CVRD is carrying out a modernization project in it’s pelletizing plant’s automation systems, that comprehends instrumentation, control and information systems. In addition, the project in

    Jan 1, 2005

  • CIM
    Improvement of Mass and Value Balance data from the Statistical Benchmark Model

    By Cecilia Arrue, Dominic Fragomeni, N. O. Lotter

    "A statistically designed benchmark mill survey was carried out in July 2005 at the Kidd Creek Concentrator, D Division circuit, which processes Ni/Cu ore from the Montcalm deposit. A structured stati

    Jan 1, 2007

  • NIOSH
    Implementing A New Personal Dust Monitor As An Engineering Tool

    A new personal respirable dust monitor developed by Rupprecht & Patashnick Co., Inc. in a multi-year project funded by the National Institute for Occupational Safety and Health (NIOSH) generated promi

  • CIM
    Evaluation of Location Based Management System in the Construction of Power Transmission and Distribution Projects

    By Abhiram Shankar

    Construction projects are becoming more demanding both in terms of time and complexity. This necessitates intricate planning and sequencing of activities at the macro and micro level and continuous fl

    Aug 1, 2013

  • SME
    Use of baseline personal DPM exposure data for mine ventilation planning- A South African Journey

    By B. K. Belle

    The use of diesel engine locomotives in South African mines can be traced to Van Dyk Consolidated Mines Ltd on the Witwatersrand gold mines in 1928 as a replacement for battery locomotives. The advant

    Jan 1, 2009

  • CIM
    Safety Lessons Learned Building two Diamond Mines

    By D. L. Putnam

    Snap Lake Mine ?? Complex dyke ore body ?? Underground operation ?? 1.1 million tonnes per annum ?? 1.2 carats per tonne ?? On-site diesel power generation ?? Supply by ice road and air ?? Mile

    May 1, 2008

  • SME
    Safe Continuous Precipitation And Disposal Of Arsenic And Other Toxic Elements From Biological Processing Of Refractory Gold Ores

    By Satid Therdkiattikul, Donald A. Dahlstrom

    By oxidizing the pyrite matrix through biological leaching of precious metals ores or concentrates, better than 90% recovery of gold and silver is achieved. The paper develops three precipitation proc

    Jan 1, 1995

  • CIM
    The Effect of Grinding Media Performance on Milling and Operation Behaviour

    By Don Langlois, Udo Weber

    "The effect of grinding media performance on milling and operational behaviour was demonstrated under different selected milling conditions of calcium carbonate. A variety of grinding media material a

    Jan 1, 2009

  • SME
    Increasing Coarse Particle Recovery Using The Flsmidth Selective Froth Recovery System

    The recovery of coarse particles has been widely recognized as being limited by the froth in mineral flotation. In response to this, FLSmidth has developed the Selective Froth Recovery (SFR) System.

    Feb 27, 2013

  • SAIMM
    The Smelting Of Manganese Carbonate Ore

    By B. W. Lee, P. O?Shaughnessy

    The practice of manganese ferroalloy smelting has traditionally been based on utilising oxide ores which typically contain a high level of manganese. This preference for oxides has even been extended

    Jan 1, 2004

  • NIOSH
    OFR-96-81 Conceptual Designs Of Retaining Structures For Open Pit Backfilling

    By Serge Rudchenko

    A study to determine the potential use of retaining structures in open pit backfilling. Research and review of the open pit mine environment, mine waste disposal, and past and current use of retaining

    Jan 1, 1981