Search Documents

Search Again

Search Again

Refine Search

Publication Date
Clear

Refine Search

Publication Date
Clear
Organization
Organization
  • AUSIMM
    Plant trials of a Siro gauge for the determination of solids weight fraction and ash content of coal in slurries of variable voidage

    By McLennan T, Howells E, Zastawny H, Watt J. S

    Nuclear techniques have been used to determine the solids weight fraction (W) and ash content of (fine) coal in slurries independent of voidage variations. The method is based on the correlation betwe

    Jan 1, 1986

  • AUSIMM
    Mining of the OK Orebody - Central Norseman Gold Corporation

    The OK orebody comprises a steep dipping narrow quartz reef averaging 0.4 m in width hosted in basalt and gabbro with porphyry bars cross-cutting through it. The following paper tracks the mining of t

    Jan 1, 1998

  • AUSIMM
    Uncertainty - An Important Source of (Additional) Value for Mine Projects

    By S Watson, L Martinez

    Mine projects are complex opportunities that demand a constant assessment of uncertainty, ie risk and upside potential. This is because the value of a mine project is typically influenced by many unde

    May 24, 2012

  • AUSIMM
    Discovery of the Solomon Iron Deposits

    By D Kepert, C Simpson, D Edwards

    Channel iron deposits (CID) currently supply over 40 per cent of the seaborne iron ore trade out of the Hamersley Province. The two well documented producing systems (Robe and Marillana palaeochannels

    Jan 1, 2009

  • AUSIMM
    Controlled Blasting for Civil Construction in an Urban Environment

    By R Domotor

    Brisbane’s Airport Link is Australia’s largest road infrastructure project, worth a total value of A$4.8 billion. The project is using surface and underground blasting to excavate hard volcanic r

    Nov 8, 2011

  • AUSIMM
    Effect of Iron Removal and Reduction on Gold and Silver Extraction by Thiourea Leaching of a Pressure Oxidation Product

    By Woodcock J. T, Zhu T, Sparrow G. J

    A lead-zinc-pyrite flotation middling was pressure oxidised to give residues containing iron hydroxy sulphates (a mixture of basic iron sulphate (BIS) and a hydrated iron sulphate (HIS)) and lead su

    Jan 1, 1991

  • AUSIMM
    New Backfill Binder and Method (269bf2ac-7892-4b0f-a5d0-bcfbbe6cee8f)

    By Grossi M, Baiden G

    This paper describes a new mine backfill method based on a newly invented binder with several years of test results from laboratory and on- site applications. The new binder has several advantages ov

    Jan 1, 1998

  • AUSIMM
    The upgrading of low-grade nickel ore stockpiles at Western Areas Ltd Forrestania operations, using a mobile ore sorting plant

    By A Parry, C Fitzmaurice

    After conducting laboratory ore sorting testwork on samples of a low grade nickel ore stockpile at Western Areas’ Flying Fox nickel mine, a mobile crushing, screening and ore sorting plant was located

    Aug 29, 2018

  • AUSIMM
    Conversion of hard-to-use wastes to new raw materials for low-energy glass/mineral-wool manufacturing

    By Z Li, Z Yan, T Htet, S Zhang

    During the pyrometallurgical processes, a substantial quantity of high-temperature ironmaking and steelmaking slags, generated at temperatures ranging from 1400 to 1600°C, is wasted, as the heat conta

    Aug 21, 2024

  • AUSIMM
    Environmental Monitoring in Polish Coal Mines

    Polish coal mines are well equipped with methane monitoring systems,nevertheless the worsening conditions force a continuous impro- vement in the field of environmental monitoring. Application of m

    Jan 1, 1988

  • AUSIMM
    Applications of Exhaust Steam Turbines to The Power Plants of Mines.

    The cost of power is an important matter to mining companies generally and this thought that the members of the Australasian Institute of Mining Engineers, as well as the engineering and mining profes

    Jan 1, 1911

  • AUSIMM
    A Tracer Study of Discharge Segregation from a Paul Wurth Hopper

    By Jones JJ

    A laboratory study of size segregation is described using a model of a Paul Wurth hopper industrailly employed for blast furnace charg- ing purposes. Experimental charge materials used in the study

    Jan 1, 1984

  • AUSIMM
    A ‘no tailings dam future’ – preconcentration strategies ‘down the sizes and across the value chain’

    By P Revell, B Adair, D King, L Keeney

    Grade Engineering®, integrated across the mine value chain, has a pivotal role to play in achieving step change reductions in energy and water usage in mine operations. High levels of gangue rejection

    Nov 10, 2020

  • AUSIMM
    Evaluation of Mineral Processing Effectiveness and Causes of Mineral Losses

    By Siwiec A

    The laboratory investigations which are necessary to evaluate the mineral processing effectiveness usually include density separation of narrow size fraction of the feed and one of the products. In

    Jan 1, 1993

  • AUSIMM
    Application of Fine Mesh Screens for Dust Suppression in Mine Transport Roadways

    By Todd S, Lam K, Hewitt A

    A series of field experiments investigated the perfonnance of fine mesh curtain screens which were used to suppress coal dust in a transport roadway of a New South Wales colliery. Four types of screen

    Jan 1, 1991

  • AUSIMM
    Fine Coal Dewatering by Compaction in Bins Exhibiting Reliable Discharge

    This paper firstly reviews the requirements for container and hopper design for reliable discharge. Discussion is then directed to the evaluation of the consolidation stresses acting in both in both t

    Jan 1, 1998

  • AUSIMM
    The Engel Model-A Simulator for Optimizing Exploration Effort

    By Rowlands N. J, Zimmermann D. O

    The Engel Model search simulator is described with particular emphasis on preparation of input parameters. The computer has a "black box" role in the same way a telephone or radio is a "black box"

    Jan 1, 1974

  • AUSIMM
    Stability of Underground Coal Mine Openings and Structures with Particular Reference to Vibrations from Surface Mine Blasts

    By Prakash AJ, Singh PK, Dhar BB

    Safety and stability of underground mine openings, coal pillars and water dams in the near vicinity of operating surface mines are endangered from excessive blast induced vibrations. This paper deal

    Jan 1, 1995

  • AUSIMM
    Underground Mining Operations at The Selwyn Project

    Since the 1950's drilling has been rapidly mechanised. First from hand held drills with air legs to pneumatic jumbos, then to more effective hydraulic jumbos. Development of underground drill

    Jan 1, 1988

  • AUSIMM
    Hydraulic Backfilling At Homestake

    The hydraulic backfilling of mine tailings has proven very successful at the Homestake Mine in Lead, South Dakota. It allows greater versatility, selectivity and safety in mining. It has also mini

    Jan 1, 1973