Excess pore water pressure induced during tailings run-outBy M A. Llano-Serna, D J. Williams, L Bu
Tailings dam failures continue to occur worldwide at an unacceptable rate, averaging two events annually over the last 100 years. Furthermore, tailings dams continue to grow in size, increasing the po
Jul 23, 2018
-
Backfilled Pits – Laboratory-scale Tests for Assessing Impacts on Groundwater QualityBy C Linklater, J Chapman, A Watson
Closure options under consideration at some sites include backfilling mined-out pits with waste rock. Backfill may include mineralised and non-mineralised waste rock. Following groundwater rebound, fl
Jun 28, 2016
-
Balancing the benefits and impacts of future copper demand – climate change and arsenicBy P J. Bangerter, G D. Corder
With the societal desire and drive towards low carbon energy sources, there is a growing awareness of the important role that minerals and metals will play with renewable energy technologies. Copper
Jul 25, 2018
-
Optimising Land for Beneficial Use During and After MiningBy J Purandare, D Murdoch
The goal of the life-of-mine plan is to ensure that while the site is left safe, stable and non-polluting, the landscape is such that optimal use can be made of the site post-mining and closure. Howev
Jun 28, 2016
-
Current Practice at the C.S.A. Mine Concentrator, CobarBy King CJ
The C.S.A. concentrator of Cobar Mines Proprietary Limited was expanded in 1974 to treat 80 000 tonnes of copper-lead-zinc ore per four week period. Jaw crusher product is fed to two par- allel prim
Jan 1, 1978
-
Presentation of Certificate of Honorary Membership to Robert Colville Bradshaw, O.B.E.ADDRESS BY THE PRESIDENT OF THE INSTITUTE (MR. J. G. SYMONS) IN PRESENTING THE CERTIFICATE TO ROBERT COLVILLE BRADSHAW, O.B.E.Today it is my privilege and pleasure to introduce to you, Robert Colville
Jan 1, 1977
-
The Grande Côte Mineral Sands ProjectBy M C. Ackland
The Grande Côte Mineral Sands Deposit (GCMSP) is located on a coastal mobile dune system in Senegal on the west coast of Africa. Senegal is a stable, democratic republic, having gained its independenc
Oct 5, 2011
-
The Leaching of Zinc Sulphide Concentrate in Sulphate-Chloride Solutions with Ferric IonsZinc sulphide concentrate from Mount lsa, Australia, was leached in acidic sulphate-chloride solutions using ferric ions as oxidants under atmospheric pressure. The parameters of temperature, particle
Jan 1, 1994
-
Best practice sampling QA/QC for gold and base metal mining – including how to assess the applicability of underground reverse circulation grade control samplingBy J T. Carswell
Best practice mine sampling should provide a detailed quantification of all potential sources of error at each stage of sampling, sample preparation and assaying.Quality assurance (QA) should include
Sep 20, 2017
-
The Potential Use of Mine Fire Simulation Software as an Enhancement for Mine Safety and Mine Rescue TrainingBy C Slaughter, J C. Tien
Commonly held ideas about effective training have long emphasised the importance of realism. Realistic training builds better experience among the trainees and a better perspective on the training mat
Aug 31, 2015
-
Australian longwall ventilation systemsBy J Rowland, B Belle, M Webber
The Australian underground coal industry has experienced substantial improvements in longwall productivity and, as such, the methods of providing a safe and productive mine environment have needed to
Aug 28, 2017
-
The Lows and Highs of Dense Medium SeparationThe paper describes the reasons for developing, specifically in South Africa, dense medium processes to allow baths to operate at low (about 1,35) and high (about 2,0) cut points. Low density proc
Jan 1, 1987
-
Numerical Modelling of a Monitored Site in an Underground Coal Mine in the Bowen BasinBy Medhurst TP, Trueman R
The aim of the paper was to model numerically some aspects of the extraction of coal pillars by split and fendering. A two-dimensional elasto-plastic plane strain model with strain softening and in
Jan 1, 1992
-
Incorporation of ore sorting into a proposed greenfields tin mining and processing project in MoroccoBy A N. Parry
In May 2018 Kasbah Resources Limited (“Kasbah”) completed an ore sorting test work program which was a precursor to releasing in July 2018 an updated Definitive Feasibility Study (“DFS”) for the Achmm
Nov 10, 2020
-
Open Pit Strategic Mine Planning with Automatic Phase GenerationBy M Recabarren, A Echeverria, J Ronda, J I. Guzman, R Dodds, G Juarez, E Vila-Echague
A strategic mine plan is a fundamental part of any mining operation. It must provide a realistic and operative extraction and processing schedule, and yield the highest value for the business. For ope
Nov 24, 2014
-
Swedish Experiences of Bore and Blast in Different RockBy Stille H
The choice between drill and blast and mechanical boring methods is often not obvious. There are several factors which may have a de- cisive influence on this choice, such as the geometry and lengt
Jan 1, 1987
-
The Use of Roadheading Machines in the Construction of the Liverpool Link LineBy Parkes DB
The excavation of sandstone of generally medium strength for the Liverpool Link Line by Dosco Mark 2A Roadheaders has demonstrated the versatility and good performance of road- headers in suitable
Jan 1, 1976
-
Ion Exchange in Hydrometallurgy - Secondary Metal Removal or Primary Production Technique?By J D. Illescas, S N. Arnold, D R. Shaw
Ion exchange (IX) as a primary production technique has been applied commercially since the 1950s; its application in the uranium industry continues to be widespread and is utilised to a lesser degree
Oct 29, 2012
-
Evaluation of a New Vision System Algorithm for Automated Fragmentation Measurement from a ShovelBy M J. Noy
The automated measurement of rock fragmentation particle size distribution in the muck during muck excavation has been developing over the last 16 years. The introduction of stereo camera imaging of t
Aug 24, 2015
-
Defining Residual Risk for Successful Mine Closure – a Geochemical PerspectiveBy T Baumgartl, B Noller, B Forsyth, J Park, M Edraki, P Pham
Understanding and quantifying residual risk is the key to the successful closure and rehabilitation of mines. An important aspect of residual risk is predicting the long-term chemistry of mine water a