Search Documents

Search Again

Search Again

Refine Search

Publication Date
Clear

Refine Search

Publication Date
Clear
Organization
Organization
  • AUSIMM
    Sidewall Fracturing in Coal Room and Pillar and Pillar Extraction Panels

    In coal room and pillar, and pillar extraction panels, the sidewall conditions were investigated based on underground measurements and numerical simulations. Three-dimensional linear elastic model

    Jan 1, 1992

  • AUSIMM
    Current and Future Developments in Truck Haulage Systems for Underground Mines

    The introduction of rubber tyred diesel equipment underground in the early 1960's and subsequent design improvements to diesel haulage systems over the past 2 decades has meant that diesel truck

    Jan 1, 1985

  • AUSIMM
    The Solution of Ventilation Problems by Mathematical Modelling

    By Wasserman A. D

    Methodological approaches and in- vestigation results are considered in the paper of heatmass transfer processes when harmful impurities are scattered and remo- ved from chamber-like workings, of th

    Jan 1, 1988

  • AUSIMM
    The Science of Blasting and its Use to Minimise Costs

    By Mercer JK

    This paper gives a description of the research undertaken by an explosives manufacturer to give better technical advice to the Mineral Industry. Blasting Physics is defined as giving a systematic a

    Jan 1, 1975

  • AUSIMM
    The Use of High Shock Energy Explosives to Control Overbreak in Development Rounds

    It is not often that mines have as much warning of the approach of bad ground conditions as was the case at the Western Mining Corporation, Kambalda Nickel Operations Lafranchi/Schmitz Decline. Most a

    Jan 1, 1992

  • AUSIMM
    Commissioning and Optimisation of the Phu Kham Copper-Gold Concentrator

    By G Harbort, T Georgiev, M Phillips

    Phu Bia Mining Ltd, a subsidiary of Pan Australian Resources Ltd owns and operates the Phu Kham copper concentrator located in the Xaysomboun District, Lao PeopleÆs Democratic Republic. Construction a

    Jan 1, 2009

  • AUSIMM
    Improvements in Blast Fragmentation Models Using Digital Image Processing

    By E Mofya, R Kaunda, P Lever

    One of the fundamental requirements for being able to optimise blasting is the ability to predict fragmentation. An accurate blast fragmentation model allows a mine to adjust the fragmentation size fo

    Jan 1, 2001

  • AUSIMM
    The Principle of Entropy and Seismological Research

    By Linying W

    Entropy is an important concept both in natural and social sciences.Considering the preparatory process of the earthquakes as an open system, in view of basic ideas of the Theory of the Dissipative St

    Jan 1, 1990

  • AUSIMM
    The CCRS SWIR Full Spectrum Imager: Mission to Nevada, June, 1995 (3fe24027-f897-4107-a465-802e38d7b0db)

    By Marois R, Hauff P, Kowalyczk P, Lipton G, Bedell R, Neville R, Edmundo G, Ehling M, Kern R

    The Canada Centre for Remote Sensing (CCRS) has developed an airborne sensor, the SWIR Full Spectrum Imager (SFSI) which detects in the Short Wave Infrared range of the solar spectrum from 1220 to 24

    Jan 1, 1995

  • AUSIMM
    Strategic Development of the Stage 5 Pit at Kidston

    The originally estimated mine life at Kidston (starting 1984) was 12 years. Through a continuing process of re-evaluation and improvement in the operation and by expanding the geological knowledge i

    Jan 1, 1994

  • AUSIMM
    Improving Coal Mining Production Performance Through the Application of Total Production Mangement

    This paper describes the application of the Total Productive Management (TPM) technique as a performance improvement initiative for a coal mining operation. It discusses the objectives of TPM, with th

    Jan 1, 1998

  • AUSIMM
    The Constructions of Sewage Tunnel by Tunnel Boring Machine with Slurry Transport System

    By Matsuo T, Uga Y

    The tunnelling work to construct a sewage trunk line designed by the Sewage Bureau of Kobe City along north side slope of Rokko mountain range incorporated an all ground condition type (broad spec

    Jan 1, 1987

  • AUSIMM
    Continuous Casting of Steel in Australia

    In November, 1967, a four strand curved mould continuous casting machine coupled with a 50 ton basic oxygen furnace began producing billets for the rod mill and new merchant mill at the Newcastle S

    Jan 1, 1972

  • AUSIMM
    Site Investigation, Instrumentation and Results of a Trial Embankment on Coal Tailings

    By Morris P. H

    A trial embankment was constructed using coarse coal mine reject on a deposit of crusted coal mine tailings at New Hope Colliery, located in the Bundamba District of the West Moreton Coalfields in Sou

    Jan 1, 1990

  • AUSIMM
    Design of Underground Works for the Eastern Suburbs Railway, Sydney

    By Darby H. P, Vincent R. J

    Sydney's Eastern Suburbs Railway from Central to Bondi Junction required the construc- tion of 10.4 km of single-track tunnel and five underground stations. Much of this work took place beneath

    Jan 1, 1981

  • AUSIMM
    Studies on the Heap Leaching Characteristics of Western Australian Gold Ores

    By Kyle J. H, Misra V. N

    The most recent development in gold processing is the increasing use of heap leaching for the extraction of gold from low grade ore, and old tailings dumps. The reason for this trend is mainly to do

    Jan 1, 1991

  • AUSIMM
    Biological Column Leaching of Chalcocite Ore

    A biological column leach testwork program was undertaken on a chalcocite ore. Three tests were conducted in all, using 65 in x 100 mm columns in three sections. The tests were started with varying

    Jan 1, 1994

  • AUSIMM
    Scott Lode: A Significant High Grade Gold Deposit

    By Cornwell P. J

    The Pajingo ore bodies consist mainly of auriferous quartz veins hosted by a suite of hydrothermally altered andesitic pyroclastics, volcanics and epiclastic sediments. Scott lode, the main econom

    Jan 1, 1989

  • AUSIMM
    Mineral Processing Design and Simulation Using Geostatistical Modelling of Ore Characteristics

    By Guarascio M, Massacci P

    In process simulation, more reliable prediction of industrial results and evaluation of data for design purposes and process optimisation may be attained by the combined use of: the modelling and si

    Jan 1, 1993

  • AUSIMM
    The Broken Hill Lode û Its Geological Structure

    Perhaps no aspect of the investigation of an ore-deposit is of greater importance to the mining geologist and engineer than a consideration of its geological structure. A thorough understanding of the

    Jan 1, 1932