Search Documents

Search Again

Search Again

Refine Search

Publication Date
Clear

Refine Search

Publication Date
Clear
Organization
Organization
  • AUSIMM
    Potential Benefits of Underground Processing for the Gold Sector û Conceptual Process Design and Cost Benefits

    By G Cormack

    By designing comminution circuits for mineral liberation rather than the final recovery process and by using high mass pull gravity recovery, the concept of underground processing has become a reality

    Jan 1, 2008

  • AUSIMM
    Best Practice Tyre Application Risk Management (TYREARMÖ) at BHP BillitonÆs BMA Goonyella Riverside Mine

    By T Klinge, P Field, N Sugden, D Trenberth

    Mining remains one of the key industries in Australia and many other countries with mineral wealth. In Australia, mining contributes 8.8 per cent to the countryÆs gross domestic product (McKay et al,

    Jan 1, 2003

  • AUSIMM
    The Kanowna Belle Project Progress Towards the Underground Mine

    The Kanowna Belle deposit was discovered in 1990 following encouraging assays from soil sampling and RAB drilling. At the end of September 1993, diamond drilling had been completed to a vertical dept

    Jan 1, 1990

  • AUSIMM
    The Reliability of Blast Damage Slopes

    The key elements required to maintain final wall integrity and hence slope reliability are discussed. Failure modes and mechanisms in highly structured rock slopes are then reviewed. The impact of bla

    Jan 1, 1999

  • AUSIMM
    Sampling Challenges in Highly Dispersed Types of Mineralisation

    By C F. Prins, C LantuTjoul

    Mineralisation in alluvial diamond or vein gold deposits is often hosted in trapping mechanisms. For instance, diamonds are nested in bedrock depressions such as gullies and potholes which were carved

    Jan 1, 2005

  • AUSIMM
    Exploration Rock Geochemistry in The Hauraki Goldfield, New Zealand (84b6bbd9-3523-4b3b-97b9-61989cb0b12f)

    By Nowell SB, Cottrill DA

    Host-rock - wallrock major and trace element geochemistry associated with epithermal gold mineralisation in the Hauraki Goldfield of New Zealand is poorly documented, even though rock geochemistry is

    Jan 1, 1990

  • AUSIMM
    The Manufacture and Microscopic Examination of Shovels

    In the early ages man contented himself with the use of such tools and appliances as would assist him in the enlightenment of his labours. With the advancement of science, numerous motives, with modif

    Jan 1, 1926

  • AUSIMM
    Geometallurgical Modelling - Quo Vadis?

    By W J. Shaw

    Geometallurgical modelling is now a hot topic in deposit evaluation and in optimising mine performance; however, its history is long and varied. Historically metallurgical sampling has frequently suff

    Jan 1, 2009

  • AUSIMM
    A Practical Example of a Risk-Based Approach to the Design of an Open Pit

    By P R. G Milne

    A risk-based approach to optimising pit wall slope angles was trialled in the design of a 60m deep open pit in extremely weathered and distinctly weathered materials in the Kalgoorlie area. The pit us

    Jan 1, 2003

  • AUSIMM
    A Model Study of the BHP New Zealand Steel Iron-Making Melter

    By Gregory O, Winters BI, Garlick C, Rogers H, Ye ZC

    BHP New Zealand Steel produces iron from titaniferous ironsand by a direct reduction process comprising multi- hearth furnaces/rotary kilns/electric iron melters. The electric iron melter is a six-in-

    Jan 1, 1995

  • AUSIMM
    Land Reclamation Trials and Practices at Martha Hill Gold Mine, Waihi, New Zealand (81918f20-43ae-4806-8567-9e3a20ae8542)

    By Gregg PEH, Stewart RB

    Reclamation field trials commenced in 1985, two years before the granting of the Mining Licence. The level of pasture production on varying soil depths (0 cm, 5 cm, 15 cm and 25 cm) overlying both ta

    Jan 1, 1995

  • AUSIMM
    Pillar Extraction And Its Relation To Surface Movement (b8961121-ac2b-4498-abda-797d1789b61a)

    Surface subsidence caused by coal mining operations was the subject of a very successful symposium organised by the Illawarra Branch of the Australas- ian Institute of Mining and Metallurgy in Febr

    Jan 1, 1980

  • AUSIMM
    A Case of Discrepancy Between Bore Values and Recoveries

    The care necessary to ensure a reliable estimate of average value from the individual values of a series of bore holes sunk in any alluvial deposit containing coarse gold was well exemplified in check

    Jan 1, 1929

  • AUSIMM
    Hej Hej Sweden, Tak Atlas Copco - The 2006 Atlas Copco Scholarship Experience

    By J MacDiarmid

    Atlas Copco is a leading provider of industrial productivity solutions (Atlas Copco, 2007) and one of the worldÆs largest suppliers of rock drilling equipment. The business division of Atlas Copco Con

    Jan 1, 2007

  • AUSIMM
    The Manantial Espejo Epithermal Low-Sulfidation Silver (-Gold) Deposit, Deseado Massif, Argentina

    By R M. Tosdal

    The Manantial Espejo district (Argentina) hosts a low-sulfidation epithermal Ag (-Au) deposit with a proven and probable reserve of 38 Moz Ag and 0.55 Moz Au. The district lies along the southern rim

    Jan 1, 2008

  • AUSIMM
    The Manufacture of Steel Piping and Tubular Products Relative to the Oil Industry in Australia

    The products of the steel tube industry play an important part in the production,' transrzission and refining of oil. Steel tube manufacturing is already well established in Australia and supplie

    Jan 1, 1962

  • AUSIMM
    Assessment of Stemming Plug Plastic Elements to Improve Blasting Gases Confinement in Escondida

    By M F. Navarrete

    During 2003, different plastic stemming plugs (Cats«, Stemtite«, and Taponex«) were tested in EscondidaÆs Mina Sur, to determine the effect on gas retention time when used in conjunction with drill cu

    Jan 1, 2004

  • AUSIMM
    Structural Permeability and Fluid Flow in Fault-Fracture Meshes (ba60e8dc-e191-48ef-a87d-4149833572e0)

    IA )W cli',hla cn1cnt fault 7011(-s 0 11Cn cOrnprise a nrc,II of inrcIIinkc(I faults, cvtcnqonal shear and In]rck cxtcnsir>nal vein- fractures. Hydrothermal mineralisation localised around such s

    Jan 1, 1995

  • AUSIMM
    The Commissioning of No. 5 Blast Furnace at Port Kembla

    By Warner R. E

    Present capacity for molten iron production at Port Kembla is an average of 13 000 t/day from five blast furnaces. The most recently installed blast furnace, No.5, was commissioned in March 1972 wi

    Jan 1, 1976

  • AUSIMM
    Dartbrook Mine - A Case Study

    Any project carries a number of challenges and risks. Inappropriate design, poor project management, time, industrial disputation and capital over runs are all areas which can impact on a project cash

    Jan 1, 1998