Search Documents

Search Again

Search Again

Refine Search

Publication Date
Clear

Refine Search

Publication Date
Clear
Organization
Organization
  • CIM
    Elimination of the Pre-Aeration and Primary Filtration Circuits From the Dome Mill Flowsheet

    "Placer Dome Inc.'s Dome Mine is located in South Porcupine, Ontario and has been in production since 1910. In the past, the mill leach circuit was preceded by preaeration and primary filtration circu

    Jan 1, 1992

  • CIM
    Mine Reclamation in a Changing Regulatory Environment

    By David H. Searle

    This paper will discuss the common trends existing in various Canadian jurisdictions for the closure and reclamation of mines. Included will be a discussion of the requirement to post security as well

    May 1, 2006

  • CIM
    Discrete event control and dynamic scheduling for tele-robotic mining

    By T. Norvell, R. Gosine, S. O’Young

    "This paper describes the use of dynamic scheduling and discrete event control to provide coordinated control of multiple automated vehicles. This work has been carried out within ongoing research int

    Jan 1, 2003

  • CIM
    A Two-Phase Backfill Approach to Dilution Control at the Doyon Mine

    By Emilie S. Williams

    The Doyon Mine?s Zone 1 (Altered Zone), found along the southern boundary of the mine, encompasses approximately 20% of the mining reserves. The mineralisation is found in a series of steeply dipping

    Oct 1, 2004

  • CIM
    High precision shovel GPS (4f4c9d38-4aa1-4e72-ad20-70b16ea72848)

    By L. M. Gould

    "Syncrude Canada operates the largest oil sands crude oil production facility in the world and produces over 13% of Canada’s total oil requirements. To achieve this, Syncrude mines the oil sands in op

    Jan 1, 2002

  • CIM
    Maboumine Process: A Promising Process for Developing a Polymetallic Ore Deposit - Focus on the Downstream Part of the Process: Rare Earth Recovery

    By S. Belair, V. Weigel

    As a growing mining company, ERAMET is looking for new positions on the strategic metals market. In this context, the Gabonese Maboumine pyrochlore deposit is currently being studied for the recovery

    Jan 1, 2014

  • CIM
    Analyse Des Écoulements De L?eau En Conditions Non Saturées Dans Les Haldes À Stériles

    By Michel Aubertin

    Les haldes à stériles contenant des minéraux sulfureux réactifs constituent un milieu favorable à la production du drainage minier acide (DMA). Au sein de ces haldes, les processus physiques, géochimi

    Nov 1, 2002

  • CIM
    Plenary Presentation - Manual Control, Process Automation – Or Operational Performance Excellence? What is the Difference?

    By Phil Thwaites

    "The mining industry uses many types of mineral and metallurgical plants to produce saleable product from ore mined. Plant design history has left current operations with a mixture of manual operation

    Jan 1, 2013

  • CIM
    Cyanide Treatment in the Metal Finishing Industry

    By K. R. Coulter

    "Good morning gentlemen. I am very pleased to have this opportunity to tell you a few of the things that happen within a completely unrelated activity, the electroplating industry, except that it does

    Jan 1, 1973

  • CIM
    The Use of a Novel Chemistry Significantly Enhances the Strip Rate of both Gold and Silver from Carbon in Strip Circuits

    By E. J. Fuller, J. C. Monette

    "Gold and silver cyanide complexes are presently desorbed from activated carbon by means of hot caustic elutions. These solutions may or may not contain additional sodium cyanide. There are several pa

    Jan 1, 1992

  • CIM
    Low-Grade Cu-Au Deposits: Predicting the Relationship between Copper and Gold Performance in Flotation and the Potential for Gravity Gold Recovery

    By Jan E. Nesset, Phillip J. Mackey, Joo Y. Kim, Giovanni Di Prisco, André R. Laplante

    Understanding the appropriate gold recovery to associate with copper recovery when assessing laboratory testing on porphyry deposits is often complicated by several factors including variable and/or c

    Jan 1, 2005

  • CIM
    Flowsheet Design Using Flotation Rate, Selectivity and RTD Data

    By Manqiu Xu, Peter Wells, Gord Bacon

    "A methodology is proposed for milling flowsheet design using flotation rate, selectivity and residence time distribution data. The flotation rate data and the difference in flotation rates between th

    Jan 1, 2005

  • CIM
    Production Simulation Overview and Case Study: Coleman 170 Orebody

    By Scott Hopkins

    Simulation tools are preferred for evaluating complex systems due to its ability to mimic reality and quickly evaluate many different what-if scenarios and find global solutions. A simulation model is

    May 1, 2008

  • CIM
    Prospecting the Future: Meeting Human Resources Challenges in the Canadian Minerals and Metals Industry

    By Ryan Montpellier, Paul Hebert

    "Prospecting the Future: Meeting Human Resources Challenges in Canada's Minerals and Metals Sector is a comprehensive sector study of the short- and long-term human resource issues and challenges faci

    Jan 1, 2007

  • CIM
    Vector Neutral Truck: A 10% Improvement to the Haulage Cycle

    By Michael Stuart Parsons

    The haulage cycle is the sequence which a haulage vehicle must first arrive at the loading area, then turn around and reverse into position. Once it is loaded, the vehicle leaves and travels to the un

    May 1, 2003

  • CIM
    The Benefits of AG Milling for Diamond Liberation when Processing Soft Kimberlites

    By J. E. Danoczi

    Shore Gold Inc. (Shore) is presently designing a diamond processing plant for the Star and the Orion South kimberlite deposits in the Fort à la Corne (FalC) area in central Saskatchewan. The first ste

    Jan 1, 2012

  • CIM
    A Comparison of BHP-Billiton’s Minera Escondida Flotation Concentrators

    By H. E. Urtubia

    "BHP-Billiton’s Minera Escondida Limitada, in Chile, is one of the world’s largest copper producers. It treats a combined 10,500 tph of copper ore through its two concentrators: Los Colorados and Lagu

    Jan 1, 2006

  • CIM
    Optimising Stope Sequences for Long Term Mine Planning

    By André van Wageningen

    Long-term mine scheduling is one of the most difficult optimization problems. The problem is said to be NP-complete in that the best possible solution cannot be found any quicker than checking all pos

    May 1, 2004

  • CIM
    The safety imperative?transforming the workplace to protect people

    By G. Winkel

    Safety conditions in industry have greatly improved over time. However, around the world, in Canada, and in each province or territory, people are still the victims of serious industrial accidents. Th

    Sep 1, 2004

  • CIM
    The safety imperative—transforming the workplace to protect people (06bb12c8-6d2f-4f7c-beb1-5bcbdcf9392b)

    By G. Winkel

    "Safety conditions in industry have greatly improved over time. However, around the world, in Canada, and in each province or territory, people are still the victims of serious industrial accidents. T

    Jan 1, 2004