Search Documents
Search Again
Search Again
Refine Search
Refine Search
-
Recent Developments in Drilling MudBy R. B. Hyde
"Severe drilling conditions and difficult mud problems are briefly out-lined as the major cost items in all production operations. The chief problems discussed are abnormal pressures, high temperature
Jan 1, 1959
-
Towards Sustainable Mining (9df47007-236e-4582-97e3-4ef917e2e48a)By Pierre Gratton, Gordon Peeling
The Mining Association of Canada launched the Towards Sustainable Mining initiative in 2004. TSM’s goal is to improve the mining industry’s performance by aligning its actions with the priorities and
Jan 1, 2006
-
Stochastic evaluation of sampling errors in mineral processing streamsBy C. Ketata, M. C. Rockwell
During the operation of a mineral processing plant, the unit processes are investigated by analyzing the data extracted by means of stream sampling. The data structure is identical to the time series
Jan 1, 2001
-
Rock fall in surface miningBy C. O. Brawner, J. Kalejta II
"The classical approach to control rock fall and ravel in open pit mining has been to use catch benches. The width and volume of benches is most dependent on the bench height, size of loading equipmen
Jan 1, 2002
-
A Focus on Variability within the Orebody for Improved Design of Flotation PlantsBy Glenn Kosick, Roger Amelunxen, Glenn Dobby
"The variability in flotation response within an orebody is often a significant problem to address during the design phase of a flotation circuit. In addition, for existing operating plants, the reaso
Jan 1, 2002
-
Evaluating the Probability of Sliding for Mine Slope Design Based on Various Fracture Orientation ClusteringsBy Martin Grenon
This paper presents two case studies where fracture set orientation was quantified using three methods: a simple fracture pole grouping, a Fisher distribution and a Kent distribution. The three fractu
Aug 1, 2013
-
How Should Mining Companies Select the Optimal Portfolio of Production Projects Considering the Risk of their NPVBy Júlio C. Lúcio
Consider the case of a mining company with N investment opportunities in projects of different commodities. The problem is: since the company has limitation of capital, equipments, technical staffs, e
May 1, 2009
-
British Columbia Aboriginal Mine Training AssociationWhat is the BC AMTA? ?What is an ASEP? ?Who are the partners? ?Critical Success Factors ?Questions/Answers Aboriginal Skills and Employment Program (ASEP) ?A collaborative partnership of industr
May 1, 2010
-
The Design of ExplosivesBy G. R. Phare
Explosives formulation is dictated by desired field performance, which in turn is dependent on such physical properties as strength, velocity of detonation, sensitivity, and water resistance. The desi
Jan 1, 1958
-
Shaft Boring with Oil Weil Drilling Equipment at Lynn LakeBy Peter A. Cain, John C. Folinsbee
"A 4-ft.-diameter shaft has been drilled to a depth of 2,790 ft. in strong, hard, basic Precambrian rocks at Lynn Lake Manitoba. This was done on the property of Sherritt Gordon Mines Limited for the
Jan 1, 1966
-
Application of Skarn Deposit Zonation Models to Mineral ExplorationBy Lawrence D. Meinert
Abstract-Most large skarn deposits are zoned in both space and time relative to associated intrusions. Zonation occurs on scales from kilometers to micrometers, and reflects infiltrative fluid flow, w
Jan 1, 1997
-
Compilation of Industry Practices for Control of Hazards Associated with Backfill in Underground Mines - Part II Underground Transport and Stope PlacementBy Jamie Archibald
The Department of Mining Engineering at Queen?s University conducted a study of backfill practices in underground mines across Canada to assess the current state of backfill usage and to overview pote
May 1, 2009
-
Advances in the treatment of CuSO4-H2SO4-As-Sb-H2O solutions by electrodialysisBy L. Cifuentes, J. M. Casas
The treatment of aqueous CuSO4-H2SO4- As-Sb solutions by electrodialysis in order to separate and concentrate species of interest has recently been studied. Results show that it is possible to separat
Jan 1, 2004
-
Fuel Investigations of the Research Council of Alberta (1919-1940)By W. A. Lang
RESEARCH has been defined as the link between the present and the future. Science, wonderful though its achievements may be, has but scratched the surface of the unknown. Research is directing its att
Jan 1, 1942
-
Algorithm to Help Additional Drilling LocationBy Vanessa C. Koppe
During ore body modeling normally additional samples are required to improve resources evaluation and mining planning. At this stage one rises the question about where additional samples should be loc
Oct 1, 2009
-
Spodumene Processing at TANCOBy J. Flemming, R. O. Burt
"The Tanco pegmatite is located in the Bird River greenstone belt of southeastern Manitoba approximately 160 km northeast of Winnipeg (Figure 1). This pegmatite body was discovered in 1929 and subsequ
Jan 1, 1986
-
The Development of an Integrated IT System at Albian Sands EnergyBy Louise H. Michaud
Albian Sands Energy is scheduled to begin production at its oilsands operations in the fall of 2002. Start-up includes the selection and implementation of over 75 IT systems or computer applications.
May 1, 2002
-
The Submarine Coalfield of Sydney, N.S.By Sydney C. Mifflen
COAL MINING, with its some 15,000 employees, is directly responsible for the livelihood of one-fifth of the population of the Province of Nova Scotia and indirectly so for that of possibly another fif
Jan 1, 1941
-
CyclonesBy Norman A. Jull
"IntroductionThe scope of this paper is intended to deal mainly with cyclones in grinding circuits. However, the section on Cyclone Equipment, contains more general descriptions, to cover most of the
Jan 1, 1989
-
The post-failure characteristics of rockBy T. G. Joseph, K. Barron
A strain-softening constitutive relationship is introduced that describes the post-failure stress-strain curve for rock regardless of whether the rock is intact or broken. The core of this relationshi
Jan 1, 2003