  • CIM
    Project Execution & Cost Escalation in the Mining Industry

    By John A. Wells, Leticia Conca, Kenneth G. Thomas

    "Since about 2002 there has been significant capital cost escalation, not inflation, in the mining industry causing turmoil for successful project completion. Project capital costs have more than doub

    Jan 1, 2014

  • CIM
    La Fabrication de fer Préréduit Pour Utilisation au Four à Arc Électrique

    By A. H. Marquis

    Since the start-up of its first Direct Reduction Module in April 1973, S1DBEC has produced over 2 million tons of prereduced iron. During this period, SIDBEC has acquired comprehensive experience in t

    Jan 1, 1979

  • CIM
    Are REE Exploration Companies Doing Enough and/or the Right Testwork to Avoid Plant Failure?

    By B. Yu, N. Verbaan, A. Mezei

    The recent 20 years witnessed a boom and bust in the nickel laterite industry. Most notoriously is the story of the first three Western Australian nickel laterite projects which all suffered major ram

    Jan 1, 2014

  • CIM
    Midwest Project? 30 Years in the Making

    By Lloyd Rowson

    ??Several factors have led to a review and reoptimization of the Midwest uranium deposit by AREVA Resources Canada Inc., the project operator, on behalf of the owners ??The current proposal is to mi

    May 1, 2008

  • CIM
    Commissioning and Operating Experience with Gekko’s Gold Ore Treatment Plants

    By Tim Hughes, Steve Gannon, Jennifer Abols

    "In the past year, two very innovative gold ore processing plants have been designed, built and commissioned by Gekko Systems Pty Ltd. The first plant in Vietnam utilizes conventional crushing and bal

    Jan 1, 2007

  • CIM
    A Geomorphic Approach for the Design of Drainage Systems on Reclaimed Mine Areas

    By Anil K. Beersing

    Effective drainage systems are required for reclamation of mine-disturbed areas to control surface water runoff and avoid excessive erosion. For the conventional structural design approach, armouring

    Apr 1, 2005

  • CIM
    Westwood Project Acceleration

    Westwood Quebec Long Life, Low Cost CONSTRUCTION UPDATE ? Shaft advanced to 840m (after 1 year), 3 km of down ramp and 2 km of exploration drift ? Head frame and hoist room structure completed ?

    May 1, 2010

  • CIM
    Suitability of PEM fuel cells for underground mining vehicles

    By M. C. Bétournay

    Hydrogen fuel cells are a known technology, having been applied to stationary (e.g. equipment, buildings, and power plants) and vehicle applications (e.g. transit buses and space shuttles). There is c

    May 1, 2005

  • CIM
    Suitability of PEM fuel cells for underground mining vehicles (35a3b3ff-1d4d-456b-a989-2c3e85f551b7)

    By G. Bonnell, W. Lidkea, M. C. Bétournay, E. Edwardson

    "Hydrogen fuel cells are a known technology, having been applied to stationary (e.g equipment, buildings, and power plants) and vehicle applications (e.g transit buses and space shuttles). There is cu

    Jan 1, 2005

  • CIM
    Computer Control of the Flotation Process at Clarabelle Mill

    By D. F. Cooper, J. G. Paterson, K. H. Pang

    "Effective control of metallurgy by manual adjustment of cell levels is common flotation practice. With an on-stream XRF analyzer interfaced to a process control computer it is possible to program the

    Jan 1, 1973

  • CIM
    Abrasion and Wear in Mills: Use of Rubber and Plastics in Screening Applications and Wear in Mills

    By G. R. Brough

    "Today it is more important than ever to get the maximum possible return on capital invested in the processing industry. To this end the plant is often operated continuously and the choice of equipmen

    Jan 1, 1983

  • CIM
    A study of problems relating to mining engineering university education

    By C. Pelley, A. Piche

    "The Canadian mining industry faces the prospects of a severe shortage of graduate mining engineers over the next decade. This arises from three factors: first, a growth in industrial activity; second

    Jan 1, 1989

  • CIM
    A Review of the Geology of Gold in Nova Scotia

    By Milton C. Graves, Marcos Zentilli

    "Gold has been reported from most geological environments in Nova Scotia; however, virtually all production (circa 2,000, 000 troy ounces; circa 60 tonnes) has come from that part of the province to t

    Jan 1, 1982

  • CIM
    Importance of Government-Sponsored High-Resolution Gravimetric, Magnetic, and Electromagnetic Surveys for Exploration and Geological Investigations, Abitibi Sub-province, Canada

    By P. Keating, J. Goutier, J. Ayer

    "New, high-resolution geophysical surveys were undertaken over parts of the Abitibi Subprovince, Canada, to help with geological mapping and to promote mineral exploration. Gravity surveys in the Rouy

    Jan 1, 2012

  • CIM
    Lessons Learned from Measuring and Monitoring the Social License to Operate

    By Ian Thomson

    The Social License to Operate ? We are operating in an era where social license in the resource industry is as important ? if not more important ? than mineral potential ? Concept proposed by Plac

    Aug 1, 2013

  • CIM
    A Review of Suncor Energy’s Millennium Extraction Process

    By Michael Godard, Peter Cleyle

    "Suncor Energy’s Project Millennium increased oilsands production capacity by an additional 95,000 barrels per day to its present level of 225,000 barrels per day. This massive venture included an exp

    Jan 1, 2004

  • CIM
    The Iron Elephant a Brief History of Hydrometallurgists’ Struggles with Element No. 26

    By A. J. Monhemius

    "The paper reviews the history of modern iron control processes in hydrometallurgy. Particular attention is paid to the processes developed in the 1960s by the electrolytic zinc industry for the remo

    Jan 1, 2016

  • CIM
    Information Strategy Planning on Nuclear Power Plant Project Management System

    By Son Hye Jin

    Abstract ? KHNP is participating in the construction of Nuclear Power Plant both in Korea and UAE. ? We want to improve our construction project management process. ? So we are now developing the

    Aug 1, 2013

  • CIM
    Evaluating uncertainty in kimberlite pipe volume by simulating geometry in cylindrical coordinates

    By J. B. Boisvert, P. Oshust

    A significant source of uncertainty in the diamond resource contained in kimberlite pipes is the volume of the pipes. Often the material within a pipe will be mined as ore, leaving the actual geometry

    Jan 1, 2008

  • CIM
    Capturing unrealized capacity

    By M. W. Lewis

    A mine's inherent capacity is dictated by factors such as equipment, design, people, processes, and environment. Actual production may approach, but never surpass, the inherent capacity limit. Th

    Jan 1, 2004