Search Documents
Search Again
Search Again
Refine Search
Refine Search
-
The Implications of Planning and Scheduling by CPMBy Jack G. Hazan
The Critical Path Method is the modern scientific answer for solving the planning and scheduling problems inherent in today's complex projects. With this method, nothing is left to chance. All re
Jan 1, 1965
-
The Urbangold Technology for Enhancing Metals Recovery and Efficiency in WEEE RecyclingBy S. Konetschnik, Lux Degel, R. Degel, T. Haslinger
UrbanGold and its partners from Mettop and SMS group have developed a novel technology for the recovery of valuables from all non-ferrous metals’ fractions of WEEE (Waste Electrical and Electronic Equ
Jan 1, 2019
-
Complex Studies On Cu-Cake Leaching In Sulfuric-Acid SolutionsBy Shila Jafari, Mari Lundström, Aleksei Kritskii, Pia Sinisalo
A typical process adopted at nickel plant is the processing of nickel-copper mattes and converter mattes using the following technology: pressure oxidative leaching (POX), solvent extraction (SX), ele
Jan 1, 2019
-
Challenges in Pneumatic Conveying of Concentrate and Flue Dust at Copper SmeltersBy E. Lehtila, J. J. Talja, R. Jahila
Kopar Oy is acknowledged for engineering and manufacturing of robust systems for bulk material handling, especially at power plants and non-ferrous smelters. We have over thirty years of experience wi
Jan 1, 2019
-
Development and Applications of Thermodynamic Database in Copper SmeltingBy D. Shishin
Continuous integrated experimental and thermodynamic modelling work is conducted in Pyrometallurgy Innovation Center (PYROSEARCH). The target is to develop a tool, which is capable to predict the comp
Jan 1, 2019
-
LSSCS BAA Topic 2 Lunar Habitat: Minimum Functionality to Outpost CapabilityBy Dallas Bienhoff
Boeing Study Team Participants Andrew Daga & Associates American Aerospace Advisors Hamilton Sundstrand Harris Honeywell ILC Dover Lunar Transportation Systems Oceaneering Orion Propu
May 1, 2013
-
Polymer Cable Carriers: A Reliable Cable Management & Protection Solution for the Mining IndustryCarrying Energy ?Energy ?Power, data, signal, hydraulics, pneumatics? ?Needs to be conveyed from a stationary point to a system in motion ?Cable Carriers (steel and plastic), Festoon Systems,
Nov 1, 2011
-
"Re-Os Model Age Constraints on the Genesis of the Moss Molybdenite Pegmatite-ApliteDeposit, Southwestern Grenville Province, Quyon, Quebec, Canada"By Robert A. Creaser, David R. Lentz
Abstract - The Moss molybdenite deposit, which was mined during both world wars, is hosted in late Grenvillian granitic pegmatite dikes. These dikes are locally aplitic, and intrude the late tectonic
Jan 1, 2005
-
The Addition of Gold to ??Fecraloy?? Substrate MaterialsBy Lizelle Glaner
An investigation was carried out by Mintek to investigate the influence of additions of gold to ?Fecraloy?, alloys based on Fe-Cr-Al. The aim was to try and improve the oxidation resistance of the ?Fe
Oct 1, 2003
-
Method of Assessing Pillar Conditions in Salt MinesBy H. Blaha, H. Wagner
"Room and pillar workings in salt mines are preferred sites for underground waste disposal. A critical issue in selecting waste disposal sites is long-term behaviour of such workings. The long-term be
Jan 1, 2015
-
Phase Equilibria Studies to Support the Technology Development for the Recycling of Lithium Ion BatteriesBy E. Haccuria
Due to the growing share of electrical cars, the use of lithium ion batteries significantly increased. Recycling of these batteries is essential to safely dispose hazardous materials as well as to rec
Jan 1, 2014
-
Fast PB Process: Plating Lead at 10,000 A/M2By M. Maccagni, J. Nielsen
"The recovery of lead from battery paste has been investigated for a long time and with the use of many different electrolytes. A number of processes have been presented, but none of them reached even
Jan 1, 2016
-
Iron Ore Company of Canada - Best Practice in upgrading and improving its pellets and concentrateBy Rénard Chaigneau
Quality during induration Drying ??40% of energy ??Drying velocity = f(1/radius2) ??Size versus risk of condensation ??Flow is important (minimise fines)Oxidation ??IOC Fe2+ typically 0.04% ??
May 1, 2011
-
Estimation of Shock Loss Factors At Shaft Bottom Junction Using Computational Fluid Dynamics and Scale Model StudiesBy T. Purushotham, B. Samanta
ABSTRACT; The shaft bottom junction in a mine ventilation system is an important source of shock loss due to the combined effect of bend and area change. The occurrence of high-volume ?ow rates throug
Jan 1, 2010
-
Characterization and Electrorefining of a Copper Anode with High Lead, Arsenic and BismuthBy M. S. Moats, C. M. Campbell
Samples of a high impurity (90.05 wt. % Cu, 4076 ppm Pb, 1939 ppm As and 635 ppm Bi) commercial copper anode were characterized and then electrorefined in a laboratory scale cell. Anode inclusions wer
Jan 1, 2019
-
Yanacocha Gold Single Stage SAG Mill Design, Operation, and Optimization (54db0027-119e-4215-a4ed-0eb1c89b8927)By Walter Valery, Sergio Vicuna, Roberto Valle, Hamer Arevalo, Ben Burger, Lui Vargas, Alex Jankovic, Jim Seidel, Eduardo Nozawa
This paper describes the design, the first three years of operation and optimization of a large, single stage SAG mill at Minera Yanacocha’s Gold Mill facility located in northern Peru. The Gold Mill
Jan 1, 2012
-
Onsite Data Acquisition Using Low Cost Open Source MicrocontrollerBy Magdy Ibrahim
This paper presents experimental design and development of a low-cost remote sensing hardware designed to support automated site data acquisition for near real-time progress reporting of construction
Aug 1, 2013
-
Maximizing the Overall Effectiveness of Teleoperated Underground Loading and Haulage EquipmentBy Jacek Paraszczak
Possibility to move human workers away from dangerous places ?enhanced safety and improved working environment; ? Increase of actual operational time: ? Less losses due to shift changes, regulatory
May 1, 2010
-
Stochastic Optimization in Mine Design and Production Scheduling: Methods, applications and valueBy Roussos Dimitrakopoulos
Overview ?Uncertainty matters: The economic side ?Models of geological uncertainly ?Shifting the paradigm: Stochastic mine planning ?Using uncertainty to improve project performance ?Conclusion
Oct 1, 2010
-
Roasting of Arsenic Containing Gold Ores/Concentrate using a Two Inch Semi-Continuous Fluid Bed Roasting UnitBy A. Roy, T. LeBel, P. Coursol, P. Lind
At the early stage of a mining project, small amounts of concentrates are available for testwork. For gold concentrate or ores containing significant arsenic levels, batch bench scale roasting is ofte
Jan 1, 2014