Search Documents

Search Again

Search Again

Refine Search

Publication Date
Clear

Refine Search

Publication Date
Clear
Organization
Organization
  • CIM
    Electrical Copper Slag Cleaning: What Holds the Future

    By A. Scheltema Beduin, M. Kalisch, E. Floch, R. J. Dijkhuis, H. J. Oterdoom

    In metallurgical copper production, the traditional aim is to increase recovery of copper to the maximum. SMS Siemag (SMS) has supplied numerous furnaces for this application. New targets are to make

    Jan 1, 2014

  • CIM
    Comparison of the Russian and International Approaches to Mining Project Design and Permitting

    By Michael J. Beare

    Requirements of both local permitting and international fundraising are forcing increasing numbers of projects in Russia and CIS to carry out dual technical studies. The principal focus of Russian mi

    May 1, 2009

  • CIM
    Reinforcement of Concrete Brick with Marble Waste

    By Zainelabdin Khalid Zainelabdin Elfaki

    The influence of partially replacing cement with marble waste on the workability and compressive strength of concrete bricks was investigated. Three replacement percentages, 10%, 20% and 30% weight ma

    Jan 1, 2014

  • CIM
    Innovative Dragline Monitoring Systems and Technologies

    By John F. Vynne

    This paper will discuss several of the systems and processes that have been developed over the past few years, and are now being utilized by major mining companies on draglines in North America, Austr

    May 1, 2008

  • CIM
    Improving Pulp Level Detection in a Flotation Column Using a Neural Network Algorithm

    By Guillermo Diaz, Roberto Pérez, René del Villar

    "Pulp-froth interface position is a key variable in column operation. In plant practice, it is commonly estimated through a system of three pressure-transducers which allows the calculation of the pul

    Jan 1, 1995

  • CIM
    Practical Considerations in the Operation of Gold Gravity Circuits

    By A. Putz, F. Vincent, A. R. Laplante

    "This paper briefly reviews some of the gravity research done at McGill University and current Canadian operating practices, with emphasis on results of interest for operators. The following topics ar

    Jan 1, 1994

  • CIM
    Reconciling Mineral Reserves at the Well-to-Well in Situ Copper Leaching Operation at San Manuel Mine, Arizona USA (803a4151-370a-45d7-996a-4b25f3d53a3e)

    By G. A. Sutton

    This paper, describes a case example from San Manuel mine, where in situ copper leaching of the supergene zone was done over a 14 year period (1986–1999) in conjunction with underground and open-pit m

    Jan 1, 2019

  • CIM
    Automatic Control of a Grinding Circuit as Experienced at East Malartic Mines

    By E. J. Marcotte

    "BRIEF DESCRIPTION OF GRINDING CIRCUITCrushed ore at -5/ 16 in. is delivered by a conveyor system from the crushing plant to two 1250 ton fine ore bins. The ore is transferred from each bin by a 30 in

    Jan 1, 1966

  • CIM
    The Ordovician Tetagouche Group, Bathurst Camp, Northern New Brunswick, Canada: History, Tectonic Setting, and Distribution of Massive-Sulfide Deposits (d4efba76-9c4a-42ee-a259-1a431117590b)

    By Steve R. McCutcheon, Cees R. Van Staal, John P. Langton, Leslie R. Fyffe

    The volcanic-dominated Tetagouche Group in northern New Brunswick contains numerous massive-sulfide deposits and intimately associated metalliferous sediments. The massive sulfides are generally hoste

    Jan 1, 1992

  • CIM
    SABC Circuit Operations at Eldorado’s Jinfeng Gold Mine (7cf6949b-da96-4c59-9c03-9a43b4377404)

    By Chao Yang, Liguo Tian, Yan Yang

    "The Jinfeng gold mine is one of the three gold mines that Eldorado Gold has in China and it is the second largest gold mine in China. The mine is located in a relatively remote and mountainous area i

    Jan 1, 2012

  • CIM
    Plant Design – The Human Factor

    "In today’s world of complex projects, where engineering and execution are supported by a high level of project management and systems, how critical is the human factor in design engineering. Based o

    Jan 1, 2016

  • CIM
    MODERN SEAFLOOR HYDROTHERMAL DEPOSITS - OCEAN RIDGES - Study of Particle Fluxes in the Broken Spur Hydrothermal Vent Field (29°N, Mid-Atlantic Ridge)

    By A. B. Isaeva, A. Yu. Lein, A. A. Karpenko, V. V. Serova, A. P. Lisitzin, V. Yu. Rusakov, V. N. Lukashin

    Abstract - The flux of sediment matter was determined using sediment traps near a black smoker ("Saracen’s Head," Broken Spur hydrothermal field) and the mineral and chemical compositions of the settl

    Jan 1, 1999

  • CIM
    Feed Size Changes for Increased Throughput at Newmont Carlin’s Dry Grinding Circuit (c85eb443-2a29-43a1-b434-f327269c2a25)

    By Walter Valery, Lauren Hafla, Megan Tibbals, Adrian Dance, Jeff Snyder

    "Newmont Mining Corporation’s Carlin (“Carlin”) operation processes roaster feed through a double rotator, dry grinding mill following secondary crushing. Metso Process Technology & Innovation (“PTI”)

    Jan 1, 2012

  • CIM
    Investigation of the Possibility of Using Acoustic Technique to Determine Bubble Size in an Inclined Cell

    By P. Chu, J. A. Finch, R. Li

    "Bubble size plays a key role in flotation. In this paper, we examine the possibility of using passive acoustic sending to determine bubble size. Software was developed based on Short Time Fourier Tra

    Jan 1, 2016

  • CIM
    Investigations on the Recovery of Scandium as a Byproduct from Maboumine Project

    By Sarah Bélair, Denis Beltrami, Deka Moussa Ragueh, Valérie Weigel

    "Scandium is a highly valuable element belonging to the rare earth elements (REE) but it has different chemical and physical properties from those of lanthanides. This metal is generally used in alumi

    Jan 1, 2016

  • CIM
    Modeling the Impact of Gaps in Friction Stir Welded Butt Joints - An Empirical Approach

    By F. Simon, A. Roth, M. F. Zaeh

    Applying Friction Stir Welding in an industrial environment requires knowledge about the robustness of the welding process against imperfections in the joint line resulting from production deviations

    Jan 1, 2014

  • CIM
    Discussion of Automatic Grinding Control Installations

    By R. J. McLeod

    "Grinding at Giant Yellowknife is done in two stages. The first stage consists of two ball mills in closed circuit will: mechanical classifiers, the classifier overflow goes to flotation. The tailings

    Jan 1, 1967

  • CIM
    The Solvent Extraction of Iron from a Chloride Leach Solution Containing Precious, Rare and Base Metals

    By Niels Verbaan, Ron Molnar, David Dreisinger

    "An acidic chloride leach solution was generated from the treatment of an ore containing the following value elements: silver, gold, indium, gallium, copper, zinc and lead. Iron was also co-extracted

    Jan 1, 2016

  • CIM
    Base Metals and High Intensity Wet Magnetic Separation

    By W. J. D. Stone

    "INTRODUCTION Over the past decade, a number of publications have described the advances in High Intensity Wet Magnetic Separation. A number of significant, but small capacity installations were made

    Jan 1, 1971

  • CIM
    Practical Quality Control Procedures in Mineral Inventory Estimation

    By Scott D. Long

    "Abstract-Grass roots exploration has an emphasis on good precision at low (sub-economic) concentrations of an element, in order to identify "anomalies" which may lead to drilling targets. Although it

    Jan 1, 1998