Search Documents

Search Again

Search Again

Refine Search

Publication Date
Clear

Refine Search

Publication Date
Clear
Organization
Organization
  • CIM
    Bench-scale simulation of flotation plant performance

    By Stratton-Crawley R., G. E. Agar

    "A study has been done of the scale-up of laboratory bench-scale flotation to continuous plant circuit performance. It was found that the impellor speed and the air flow rate influenced the results an

    Jan 1, 1982

  • CIM
    Alimak Mining at the David Bell Mine

    By Andrew G. Patton

    The Alimak mining method was introduced at the David Bell mine in 1998 to extract an otherwise uneconomic and inaccessible reserve. The success associated with the extraction of these reserves led to

    Oct 1, 2001

  • CIM
    Les Mines INMET Division Troilus - Objet: Extension de la vie des godets des excavatrices DEMAG.

    Les Mines Inmet ? La Division Troilus exploite une mine d?or à ciel ouvert depuis 1996 et produit un concentré de cuivre. La Division Troilus est localisée à 175 KM au nord de la ville de Chibougama

    Feb 1, 2008

  • CIM
    Classification of quartz veins in turbiditehosted gold deposits, greenschist facies, eastern Nova Scotia

    By S. J. Haynes

    "This paper documents the characteristics of the different quartz veins, and their relation to gold, in the turbiditic Meguma domain of eastern Nova Scotia. Eleven different types have been distinguis

    Jan 1, 1987

  • CIM
    Hazard Map Approach Using Space-time Clustering Analysis of Mining-induced Microseismicity

    By Pavel Vasak

    Microseismic monitoring has become standard practice in the mining industry as a ground control monitoring tool at depth. Translating the information into practical hazard assessment tools for the roc

    May 1, 2004

  • CIM
    Cobre Panama

    By Ian D. Pirie

    Presentation outline ?Project location ?Geology ?Resources and reserves ?Results of the FEED study ?Social and environmental considerations ?Project path forward

    May 1, 2010

  • CIM
    Fire in No. II South, No. 26 Colliery, Glace Bay

    By W. Leblanc, J. Phalen

    This paper tells the story of a serious mine fire on a mechanized longwall face in a submarine coal mine at Glace Bay, Nova Scotia. The story gives, in chronological order, a technical account of the

    Jan 1, 1976

  • CIM
    A technique for the direct measurement of bubble size distributions in industrial flotation cells

    By J. A. Finch

    "A method of sampling and presenting bubbles for imaging for use in full-size flotation cells is described. The device (bubble viewer) comprises a tube attached to a sealed glass viewing chamber. The

    Jan 1, 2002

  • CIM
    Error Associated with the Sampling of Gold Ores

    By Raphaël Mermillod-Blondin, Claude Bazin

    "Sampling is an important step for ore body evaluation and daily plant material balances. The Gy’s equation is regularly used to assess the size of the samples to be collected and to estimate the repr

    Jan 1, 2012

  • CIM
    Reprocessing of a French Guyana Operation Tailings Using Flotation for Gold Concentration

    By P. Botane, A. Cailleau

    "Compagnie Miniere Esperance operates a gold primary ore body. The ore is processed through crushing, grinding and gravity concentration generating tailings with remaining fine gold. Analyses of the t

    Jan 1, 2009

  • CIM
    The Sampling System of Courier 300 Analyzer

    By Tapio Leskinen

    "l. IntroductionA reliable sampling system is the basis for an on-stream analyzer. This was realized in Outokumpu company when the development work of the Courier 300 On-Stream X-ray analysis system w

    Jan 1, 1976

  • CIM
    Iron Ore Fines Recovery by Reichert Cones

    By George Chung

    "The Iron Ore Company of Canada's Carol Lake Project is Located near the western boundary of Labrador, 960 air kilometers northeast of Montreal (Figure 1).The Concentrator operation was started in 196

    Jan 1, 1980

  • CIM
    Venturi-aerated flotation column

    By P. Quinn

    "The Venturi-aerated flotation column (VAC) is based on a reactor and separator design for a new generation of flotation machines. The reactor is a Venturi tube, where the air/slurry contact takes pla

    Jan 1, 2002

  • CIM
    K-Ar and Rb-Sr dating and the genesis of tungsten at the Clea tungsten skarn property, Selwyn Mountains, Yukon Territory

    By K. M. Tompson, R. L. Armstrong, C. I. Godwin

    "Tungsten skarn deposits on the Clea property in the Selwyn Mountains, Y. T., are related genetically to a quartz monzonite stock, about 500 metres in diameter at the surface. Lower Paleozoic sediment

    Jan 1, 1980

  • CIM
    The coarse particle recovery process

    By G. S. Hill, B. J. Huls

    This paper on coarse particle recovery (CPR) summarizes a process to capture coarse particles that are not recoverable by regular flotation. Several porphyry copper operations in the world operate ana

    Jan 1, 2006

  • CIM
    Exploration risk

    By R. G. Burn

    "A brief outline will be given of the concept of risk and its implications with regard to investment in exploration. The relationship between risk and decisions under uncertainty will be examined as a

    Jan 1, 1984

  • CIM
    Fracture Mechanics Numerical Modeling ? Potential and Examples of Applications in Rock Engineering

    By T. Backers

    In fracture mechanics modeling the rock mass is seen as the combination of rock material and fractures, which are evident on different scales. The activation and propagation of fractures dominates the

    May 1, 2009

  • CIM
    150th Anniversary Victoria Bridge, 1859 - mid-December, first train; 1860 August, celebration

    By H. J. McQueen

    ORDER OF PRESENTATION ?INTRODUCTION TO THE VICTORIA BRIDGE ?REASONS FOR A BRIDGE AT MONTREAL ?RAILROAD BRIDGE REQUIREMENTS ?IRON PRODUCTION CANADA / WORLD AL ?METALLURGICAL INDUSTRY CANADA ?FA

    May 1, 2011

  • CIM
    Improving reliability and productivity at Syncrude Canada Ltd. through materials research: past, present, and future

    By S. Hoskins, S. Chiovelli

    "The annual budget for the repair and maintenance of equipment at Syncrude Canada Ltd. is in excess of $450 million. Of this amount, a significant portion can be attributed to the loss of material on

    Jan 1, 2004

  • CIM
    Stochastic Mine Planning Optimization: New Concepts, Applications and Monetary Value in an ever Uncertain Market

    By Roussos Dimitrakopoulos

    Conventional approaches to estimating reserves and optimizing mine planning and production forecasting result in single, often biased forecasts. This is largely due to the non-linear propagation of er

    Oct 1, 2009