  • CIM
    Gold-copper ores processing / flotation process optimization by the development of an on-line expert system

    By Yves Breau, François Robichaud, Jacques McMullen, Pierre Pelletie

    "The Expert System implemented at the East-Malartic mill controls a copper flotation circuit while taking into account the profitability of the operation. Treating a copper gold ore, the flow sheet in

    Jan 1, 2002

  • CIM
    Constant Factors for the Calculation of the Calorific Value of Cape Breton Coals From Proximate Analysis Data

    By J. L. Bowlby

    The heats of combustion of fuels are determined in the laboratory by means of a calorimeter, usually of the oxygen bomb type. A known weight of the fuel is burned in an atmosphere of oxygen under appr

    Jan 1, 1929

  • CIM
    Flotation Process Neural Data Analysis and On-Line Monitoring

    By Heikki Laurila, Sirkka-Liisa Jämsä-Jounela, Jarkko Karesvuori

    "Artificial Intelligence includes excellent tools for the control and supervision of industrial processes. Several thousand industrial applications have been reported worldwide. Recently, the designer

    Jan 1, 2000

  • CIM
    Goldstream Concentrator Design and Operation

    By Stuart McTavish

    "Noranda's Goldstream mine is a 1,500 ton per day copper-zinc mine located 60 miles north of Revelstoke, B.C.The orebody which contains 3.69% Cu and 2.69% Zn was discovered in 1972. Construction of th

    Jan 1, 1985

  • CIM
    Numeric Model of a Cemented Rockfill Span Test at the Turquoise Ridge Mine, Golconda, Nevada, USA

    By D. R. Tesarik

    Researchers from the National Institute for Occupational Safety and Health (NIOSH)1 and engineers from Placer Dome, Inc.2, conducted an underground rockfill span test at the Turquoise Ridge Mine near

    May 1, 2007

  • CIM
    Multi-Point Concurrent Tracking and Surveying in Construction Field

    By S. Mao

    Total station has been predominantly applied in stationary survey scenarios in construction. With the moving target tracking and point survey automation functions, a robotic total station (RTS) lends

    Aug 1, 2013

  • CIM
    The Influence of Large Unit Equipment on Mine Plant Design

    By A. G. Spencer, A. D. Taylor

    This paper discusses some of the advantages and problems associated with the selection of large unit equipment for a metallurgical plant. A given flowsheet and material balance for an iron ore concent

    Jan 1, 1968

  • CIM
    Analyzing Shovel Tooth Wear Patterns with an Automated Machine Vision System

    By Matthew A. Baumann

    Tooth-wear on mining shovels requires continuous monitoring. Worn teeth impede excavation performance, increase energy usage, and increase the risk of lost or broken teeth and adapters. A machine-visi

    Nov 1, 2011

  • CIM
    Effect of Operating Variables in Knelson Concentrators: A Pilot-Scale Study

    By Sunil Koppalkar, A. R. Laplante

    "A Pilot Plant was installed in one of the grinding circuits of the Dome Mill, Ontario, Canada. Tests were conducted on a KCCD12 Knelson Concentrator to systematically analyze the effect of operating

    Jan 1, 2007

  • CIM
    Sensor-Based Sorting of Spent Refractory Bricks

    By A. Ducastel, S. Connemann, A. Stark, F. Bouillot, C. Fricke-Begemann, LSA, H. Knapp, L. Horckmans

    "Refractory materials are essential for all high-temperature applications in industry. Depending on the position in the furnace and specific process requirements, refractories are produced from severa

    Jan 1, 2016

  • CIM
    Coarse Lead Flotation Practice at Polaris

    By R. Simkus, J. K. Gowans

    Polaris Operations, a Cominco Ltd. lead-zinc mine, is located on Little Cornwallis Island, Northwest Territories, at Latitude 75°23' N and Longitude 96°75' w. When the Polaris Mine went into operation

    Jan 1, 1984

  • CIM
    Wood Refuse Burning in the Central Steam Plant Hollinger Mine

    By E. T. Turner

    Introduction 1n assembling material for this paper on Wood Refuse Burning 1 turned first to the records of our early studies of the problem in order to learn how and why certain basic decisions were

    Jan 1, 1951

  • CIM
    The Colomac Project

    By V. N. Bryant

    "1.0 SYNOPSISThe Colomac property, located 137 miles by air northwest of Yellowknife in Canada's NWT. will recover gold from 10,000 tons per day of open pit ore.The decision to proceed with the projec

    Jan 1, 1990

  • CIM
    Towards Optimum Value in Underground Mine Scheduling

    By Bryan M. Maybee

    The scheduling of underground mining activities is a complex task, in particular because of the requirement to satisfy a large number of constraints. A Schedule Optimization Tool (SOT) for underground

    May 1, 2009

  • CIM
    The Mount Fronsac North Volcanogenic Massive Sulfide Deposit: A Recent Discovery in the Bathurst Mining Camp, New Brunswick

    By G. Graves, J. A. Walker

    "Abstract - The Mount Fronsac North volcanogenic massive sulfide deposit is the most recently discovered massive sulfide body in the Bathurst Mining Camp. The deposit occurs within a sequence of inter

    Jan 1, 2006

  • CIM
    In Situ Measurements for Geomechanical Design of Cemented Paste Backfill Systems

    By M. W. Grabinsky

    Better in situ performance data is required in order to advance the rational geomechanical design of cemented paste backfill systems. A few in situ test programs have been conducted, but these have su

    May 1, 2007

  • CIM
    Viceroy Minerals Corporation = Brewery Creek Mine Process Overview

    By Brad Thrall, Howard Bradley, Michael Samuels

    "LOCATIONViceroy Minerals Corporation owns and operates the Brewery Creek heap leach gold mine located approximately 55 kilometers northeast of Dawson City, Yukon Canada. Dawson was home of the Klondi

    Jan 1, 1999

  • CIM
    Optimizing Performance at the David Bell Mine Concentrator

    By K. Meyer

    "The largest cost centres of the David Bell Mine concentrator are grinding, leaching and effluent treatment. Optimizing results during the 6th year of operation are listed below: o SAG mill slurry den

    Jan 1, 1991

  • CIM
    Rock Mass Classification for Pre-Excavation Support Planning and at-Face Excavation Performance Assessment

    The rock mass classification systems were developed for different functions, including support selection, excavation method selection and the determination of rock mass engineering properties for exca

    May 1, 2009

  • CIM
    Les minéraux industriels au Québec

    By Henri-Louis Jacob et Marc Bélanger

    La province de Québec est un important producteur de roches et de minéraux industriels. En 1998, la valeur de cette production se chiffrait à 1,26 milliard de dollars canadiens (données préliminaires)

    Jan 1, 2001