Search Documents
Search Again
Search Again
Refine Search
Refine Search
-
Geotechnical Instrumentation of Pile Foundations Embedded In Molasse of a High-Rise BuildingBy A. Daouadji, P. Cazes, S. Grange, L. Briançon, R. Milane
Construction in congested urban areas is often accompanied by geotechnical problems due to high loads and the impact caused by nearby buildings. For this reason, it is important to understand the beha
Jan 1, 2019
-
Cockatoo Island Seawall Seepage Barrier – Permeation Grouting, Jet Grouting and a Soil/Cement/Bentonite Mixed Slurry Capping TrenchBy Chris L. Powell, Russell J. Denny.
"The remotely located Cockatoo Island iron ore mine off the Kimberly coast in Western Australia, which has been in operation since 1951, was recently expanded up to 50m below sea-level using staged co
Jan 1, 2016
-
Field Measurements Of In-Situ Equipment Track Pressure And Working Platform Deformation Using Earth Pressure Cells And Fiber OpticsBy Peter Faust, Peter Hubbard, Kenichi Soga
The European Federation of Foundation Contractors (EFFC) and The Deep Foundations Institute (DFI) have set up a task group to compile a Guide for Working Platforms. The first edition of this Guide has
May 1, 2022
-
Pile Design Using Cpt Results: The “Lpc Method”By Frederic A. Verheyde
The CPT pile design method of the ‘Laboratoire des Ponts et Chaussées’ (LPC) uses the cone resistance (qc) for the design of axially loaded piles. It was originally proposed in 1982 and was revised in
Nov 1, 2022
-
Use of Enhanced Pre-Mixed Self-Hardening Grout for an Emergency Cut-Off Wall Intervention in West AfricaBy Maurizio Siepi, Bruno Vingiani, Claudio Asioli
"The article describes an emergency rehabilitation intervention executed at Buyo Dam, in Ivory Coast, to intercept a significant water seepage occurring through the foundation of this zoned earthfill
Jan 1, 2016
-
Construction of a Deep Slurry Cutoff Wall for the Sacramento River East Levee ProgramBy Louay Owaidat, Daniel Jabbour, Allan Frappier, Jose Gomez, Mark Stanley, Tino Maestas
The U.S. Army Corps of Engineers (USACE) is implementing a levee strengthening program along the Sacramento River East Levee (SREL) designed to correct 11 miles of deficient levees as identified by re
Sep 8, 2021
-
Evaluation Of Pile Load Test ResultsBy Rasin Duzceer
In this paper, the results of pile load test on 24 piles from twelve sites are presented. The pile load tests were performed on 14 driven and 10 bored piles of varying diameters and lengths installed
Jan 1, 2002
-
Axial Behavior of Auger Cast Piles in Inner Coastal Plain Geology (0a0de455-b1b9-4e2a-a87b-f9c3f26892a7)By Brian E. Ladd
"A load test program was performed on two auger cast piles constructed in the Inner Coastal Plain geology of North Carolina. Both test piles were installed through Coastal Plain deposits and into unde
Jan 1, 2017
-
Quality Assessment of Seismic Data Sets and the Impact on Interval Velocity Estimates in DSTBy Gerald Verbeek, Erick Baziw
"Downhole Seismic Testing (DST) is an important geotechnical testing technique for site characterization as it provides low strain (<10-5) in-situ interval compression (Vp) and shear (Vs) wave velocit
Jan 1, 2017
-
Assessment of the Durability of Cementitious Barrier MaterialsBy Stephan A. Jefferis, Adrian H. Bath
"This paper draws together some themes on the durability of barrier systems, and particularly cementitious systems. For contaminated land and water retaining structures, durability can be poorly addre
Jan 1, 2016
-
Diving Underground - Through a Hologram - To Better Understand Foundation RiskBy Scott A. Anderson, Benjamin S. Rivers, Derrick D. Dasenbrock, Silas Nichols
Unknown geotechnical conditions are a major source of risk. Unexplored places vastly outnumber the sampled and tested ones, and widely spaced boreholes with intermittent tests and samples are the norm
Jan 1, 2019
-
Using Thermal Integrity Profiling to Evaluate the Structural Integrity of Soil NailsBy Inc. Pile Dynamics, Daniel S. Belardo, Marcus Galvan, George Piscsalko
Soil nails are often utilized as a temporary or permanent earth retention technique for slope stabilization and for excavation retention for existing or new structures. Soils nails are generally advan
Jan 1, 2017
-
The Deep Cut-Off at the Walter F. George Dam"TREVIICOS CorporationINTRODUCTIONThe Walter F. George lock and dam was constructed on the Chattahoochee River between 1955 and 1963 with the double function of improving navigation and generating pow
Jan 1, 2014
-
Washington Avenue Tunnel Project: Fortifying Aging Underground InfrastructureBy Andrew R. Klaetsch, Peter W. Deming
"The Washington Avenue tunnel in Kingston, NY was completed in 1912 to convey combined storm water and sanitary sewage. Over a mile in length, the tunnel was driven almost entirely in bedrock, with th
Jan 1, 2016
-
Comparing Conflicting Conclusions from Different Integrity Testing Methods on the Same Drilled ShaftsBy Alex Ryberg, Matthew L. Becker
Several integrity testing methods exist which may be used to evaluate drilled shafts. Each test method has advantages and limitations. On occasion, the results from different test methods may lead to
Sep 8, 2021
-
Dealing with Complexities Associated with the Application of Bored Pile Retaining Walls in Urban DevelopmentsBy Abid Adekunte
"Engineers and developers have witnessed the growing popularity of deep basement structures as components of urban commercial and residential developments. This is often attributed to inadequate surfa
Jan 1, 2017
-
USTA Geoseismic and Foundation Design ChallengesBy Athena C. Denivo, Pablo V. Lopez, Sissy Nikolaou, Alfred H. Brand, Ahmad Rahimian, Rudivien G. Josef
"The United States Tennis Association (USTA) Billie Jean King National Tennis Center (BJKNTC) site is located in the northeastern portion of the Flushing Meadows Corona Park area of Queens, N.Y. The s
Jan 1, 2015
-
A Three-Stage Assessment Process To Predict Risk Levels Due To Subsurface ConstructionBy Julie Clarke
In 1939 Dr. Ralph Peck criticized the Civil Engineering community for taking a bifurcated approach to the prediction of building damage due to subsurface geo-technical works. Specifically, he observe
Jan 1, 2009
-
Innovative Earth Retention Project for a Parking GarageBy Andreas Brandner, Karl Schoenherr-Strasse, I. B. Brandner, Dipl. Ing
"A world famous Wintersport resort in the Alpine planned to build a parking garage for more than 600 cars and busses situated between a torrent, a district road and the village.A nearly 200 m long bui
Jan 1, 2016
-
Experiences Using A Leader System For Long Cfa(Acip) Piles In HawaiiBy Damien Enright, Franz-Werner Gerressen
CFA/ACIP pile is the most used single pass drilling method for deep foundation installations. It is constructed by rotating and driving a Continuous Flight Auger (CFA) into the ground at a controlled
Oct 1, 2022