Monopile Construction Technique For Mumbai Coastal Road Package 1 - MumbaiBy T Vijayakumar, Vipul Dobhada, Rajesh Patel, Swarnadip Dey, Naveen Babu D
The most challenging scope of any bridge project in marine or inter tidal zone is to construct sub structure like well Foundation, group pile, pile cap etc. Similarly, it also affects the marine envir
Sep 1, 2022
-
Buttressing Berms for Stability of Cantilever Sheet Piles – Limit Equilibrium and Finite Element ApproachesBy Ali Ebrahimi, Meena L. Viswanath, John F. Beech, Mustafa B. Erten, Ming Zhu
"Excessive deformation of a cantilever sheetpile wall can occur due to dredging, excavation, backfilling, or long-term creep behavior of soil. A buttressing berm constructed in front of the wall can b
Jan 1, 2016
-
Recent Developments in Wind Turbine Foundation Design: Post Tensioned Single PierBy Mohsen Elsayed, Amr Sallam, Ahmad Mohamed, Xuebing Zheng, Mohamed Alrowaimi
The foundation is an essential component of the wind turbine that ensures continued operation under stable and safe conditions. Both shallow and deep foundations are utilized to support wind turbines
Jan 1, 2019
-
Liner Piles Used As Support To Kentledge For Initial Compression Load TestBy Venugopal B, M Kumaran, Thomas John, Vetriselvan A
The initial pile load tests are conducted to ensure the geotechnical capacity of the pile in a particular site condition. Normally kentledge method is adopted for the compression pile load tests. In t
Nov 1, 2022
-
Investigations on the Distress to the Pavements/PQC Slab around Monorail Piers, Wadala, MumbaiBy Unnikrishnan Nair, Sandeep S. Nikam, Sanjay D. Patil, Prabir C. Basu
"Mumbai Metropolitan Region Development Authority (MMRDA) entrusted to implement Monorail Systems in various parts of Mumbai Metropolitan Region (MMR) with the objective to supplement the present tran
Jan 1, 2015
-
Piles through Soft Clay for a Metro ProjectBy Sanjay Gupta, Sorabh Gupta, Ravi Sundaram, Abraham Varghese
"Geotechnical investigation for the Kochi Metro revealed a critical section of the Viaduct near Ernakulam Junction Railway Station. Four piers, located over a 220 m stretch, were passing through an ar
Jan 1, 2015
-
Collaborative Value Engineering Redesign - DFI 2020By Martin Mcdermott, Kevin Tehansky, Robert Ross, Jeffrey Goodwin
A foundation value engineering redesign is a collaboration between the project owner, original design team, general contractor, foundation contractor and redesign team. Without the acceptance and coll
-
Protection of Waterfront Properties by Pressed-In Sheet Pile SeawallsBy Ian Vaz, Takefumi Takuma, Rafael Holcombe, Chris DellAringa
"This paper will discuss the successful installation of seawalls for the first phase of a project in Long Beach in California known as the Naples Island Permanent Seawall Repair – Phase 1. How an unco
Jan 1, 2016
-
TTMJ – The New System for Slurry (Diaphragm) Wall JointsBy Maurizio Siepi, Paul van Horn, John Coupland, Julian Crawley
"TTMJ is the acronym for the Slurry (Diaphragm) Wall Tension Track Milled Joint currently in development as part of the European Union's innovative and far-reaching Horizon 2020 initiative (FTI Pilot-
Jan 1, 2017
-
Utilizing Real-Time Data and Statistical Analysis for Wet Soil Mixing: A Case HistoryBy Sunil Arora, Lisheng Shao, Chris Conkle
"The East Garden Grove - Wintersburg Channel located in Orange County, California, required upgrades along the levees to mitigate potential liquefaction and lateral spreading hazards. The Orange Count
Jan 1, 2015
-
Ground Freezing for Groundwater Cutoff at the Seattle Seawall Replacement ProjectBy Brenton Cook, Daniel Mageau, Larry Applegate, Aaron McCain
"Ground freezing was successfully used to create an impermeable barrier wall along 3,000 feet of the downtown Seattle waterfront as part of the Seattle Seawall Replacement Project. This $360 million r
Jan 1, 2016
-
Foundation Challenges And Innovative Solutions: The Wharf Phase 2, Washington, DcBy Aaron L. Sacks, David R. Good, Srinivas Yennamanda, Joseph K. Carey
Construction of Parcels 6 and 7, the second phase of The Wharf, began in 2019 and geotechnical construction was completed by December 2020. The overall project consisted of horizontal site, parks, and
Oct 1, 2022
-
Innovative Alternate Underpinning Solution for Historic Structure in Boston SuburbBy Eric P. Bregman, Justin Zarrella, Ryan M. Coulson, Connor Johnson
Within a prominent Boston, MA suburb are a pair of historic stone and mortar structures built in the late 1800’s. Both the Main House and Carriage House have been maintained and occupied throughout th
Sep 8, 2021
-
In-Situ Study On Improvement Of Soft Ground Using Stone Columns For Railway EmbankmentBy Kishore Kumar B., Eswaran Prasad C R, Srini Naik B., Ramakrishna Raju N
The authors through this paper intend to introduce the non-vibro technique of ground improvement by stone column, being used for the first time in India under the Western Dedicated freight Corridor in
Nov 1, 2022
-
Innovative Grouting Techniques for Installation of a Seepage Barrier at Barrage Des Quinze Dam (Quebec, Canada)By Danny Déry-Chamberland, Peter Bowman, Michael Byle
"The Barrage des Quinze dam is a concrete sluice dam consisting of 19 spillway sections, each of which is approximately 7.6 metres wide and 14.5 metres deep. Rehabilitation efforts being performed on
Jan 1, 2016
-
Cement Deep Soil Mixed Walls/Grout Plug for Groundwater Cut Off and Excavation Support at the Bart Warm Springs ExtensionBy Harry Schnabel, Mitchell L. Fong, Douglas R. Jenevein, Thomas S. Lee
"The Warm Springs Extension (WSX) is one of a series of projects that will eventually extend the Bay Area Rapid Transit System (BART) from Fremont to San Jose, California. A cut and cover tunnel was u
Jan 1, 2015
-
Numerical Modelling Of Nonlinear Piles ? SynopsisBy S. P. Lin
The numerical models of nonlinear piles for deep foundations are studied in this paper. The purpose of these is to clarify the mechanical behaviour of deep foundation nonlinear piles subjected to axia
Jan 1, 2010
-
Lateral Stresses On Multilevel Tieback WallsBy Liiban A. Affi
The most difficult task of designing multilevel tieback walls for deep excavation support is the determination of lateral stresses. These lateral stresses act not only on the shored height, but also
Jan 1, 2010
-
Replacing Top Layer Of Soft Clay With Compacted Engineering Fill To Improve The Lateral Capacity Of PilesBy Venugopal Bonani, Kumaran M., Thomas John
Liquid storage tanks are usually located in nearshore or coastal regions with soil profiles containing thick layers of compressible soils. These storage tanks are usually of large diameter up to 90m a
Sep 1, 2022
-
Challenges Of Earthen Cofferdam In Deep Excavations For Waterfront Structures, A Case StudyBy Balasubramani M., Ramana P. V., Bairagi K.
This paper is a case study of an earthen Cofferdam, constructed for a deep excavation at Intake location in river Aaundha, Maharashtra, India. A 12 m (39 ft) deep excavation was made to construct the
Nov 1, 2022