Search Documents

Search Again

Search Again

Refine Search

Publication Date
Clear

Refine Search

Publication Date
Clear
Organization
Organization
  • DFI
    Session 22 "Compaction Grouting and Limited Mobility Grouting"

    By Allen Cadden

    The type of soil we had was a silty fine sand. It had been placed by hydraulic methods in 1904 so it was quite clean I would say less than 10% silt the rest of it was very loose sand. That I'm n

    Feb 10, 2003

  • DFI
    Monotonic And Cyclic Lateral Full-Scale Testing Of Reinforced Helical Pulldown Micropiles

    By M. Meckkey El Sharnouby

    In this paper, the results of full-scale field testing of reinforced helical pulldown micropiles (RG-HSP) installed in clayey till soils and resting on sandy soils are presented. Piles were tested und

    Jan 1, 2011

  • DFI
    Non-Destructive Testing Methods For Drilled Shaft And Acip Piles (6922d0e7-932e-4be1-a810-c6fa95777bc9)

    By George Piscsalko

    Quality control of drilled shafts and ACIP piles is greatly dependent upon the practices of the site personnel. In many applications it is difficult to properly inspect the shaft prior to concreting,

  • DFI
    Non-Destructive Testing Methods for Drilled Shaft and ACIP Piles (34748882-cb96-4081-9967-58c48901bc15)

    By George Piscsalko

    "Quality control of drilled shafts and ACIP piles is greatly dependent upon the practices of the site personnel. In many applications it is difficult to properly inspect the shaft prior to concreting,

    Jan 1, 2017

  • DFI
    Session 27 "Grouted Cutoffs"

    By Trent Dreese

    For critical velocities in gravel units we use Bush-Luckner, Sichardt, other empirical equations, and equations derived from laboratory experiments too. On the base of these, we compiled critical velo

    Feb 10, 2003

  • DFI
    Construction Of A Pre-Founded Anchored Wall, Monitoring Of Execution Based On The Eurocode 7 Observation Method, And Taking Account Of The Transmission Of Seismic Forces In The Retaining Structures Towards The Buildings Structure

    By Denis Huber

    The technical assessment of the final works on the "Stéphany Palace" project at Menton in France's Alpes-Maritimes region shows the importance of daily project monitoring based on the observation

    Jan 1, 2002

  • DFI
    Caveat Emptor Or A Buyer's Guide To Pile Integrity Testing - Introduction

    By Joram M. Amir

    During recent years, the integrity testing of piles has made considerable progress. With the availability of portable and powerful computers, practically all integrity testing equipment is now digital

    Jan 1, 1999

  • DFI
    Ground Freezing Combined Method for Urban Tunnel Excavation

    By Filippo Mira-Cattò, Andrea M. R. Pettinaroli, Elena Rovetto

    "The construction of Powisle station of Metro Warsaw Line 2, in Poland, required the execution of two shafts next to an urban road tunnel adjacent to the Vistula River. The shafts were linked by three

    Jan 1, 2015

  • DFI
    Trencher Method Vs. Slurry Trenching: A Pros & Cons Comparison Of Case Studies

    By Daniel Ruffing, Charlie Krug

    In recent years, the chain-style trencher has been proven a valuable tool for installing vertical walls on challenging sites where conventional methods may be less desirable. Like many tools, trencher

  • DFI
    Wadi Dayqah Dam Curtain

    By Frank Haehnig, Harald Krenn, Harm-Christoph Claassen

    "The Wadi Dayqah Dam Water Supply Scheme represents one of the most important projects implemented by the Sultanate of Oman to ensure sustainability of water resources. The principal components of the

    Jan 1, 2016

  • DFI
    Design Of Self-drilling Micropiles For Permanent Applications

    By Racquel Nottingham, Freddy Lopez, Ole Gadermann

    The ongoing urban development is a global phenomenon, placing has high demands on urban infrastructure (housing, public services, transportation, telecommunications, etc.). Micropiling is one of the m

  • DFI
    S21-Berlin – Design And Underwater Construction Of A Covered Contrustion Pit Without Direct Accessibility From Above

    By Grischa Dette, Thomas Schröder, Holger Merski

    For the construction of the tunnel for the new Berlin S21 light rail line, a construction pit had to be built below the crossing B 96 federal road. For this purpose, the construction pit M’ has been b

    May 1, 2022

  • DFI
    “Digital Specialist Foundations”- Using The Digital Twin During Project Execution

    By Marcus Daubner

    This paper explains how BAUER Spezialtiefbau GmbH uses digital methods on projects - starting from work preparation to completion of works. More precisely, the advantages of BIM-based planning during

    Sep 1, 2022

  • DFI
    Session 31 "Grout Mixtures and Materials 2"

    By Lois G. Schwarz

    I did not make studies about this parameter but I can say that some researchers recommend using low C3A cements to repair masonry mortar in order to reduce a possible combination with sulphate that ca

    Feb 10, 2003

  • DFI
    Diaphragm Walls for Infrastructure Projects how to Deal with Complex Demands?

    By Franz-Werner Gerressen, Manfred Schoepf

    "Diaphragm walls are known as underground structural elements commonly used as retention systems for excavation pits and shafts and permanent foundation walls or elements. It can be anticipated that,

    Jan 1, 2015

  • DFI
    OPA Contender Features Innovative ACIP Pile Test

    By Andres M. Baquerizo, Matthew E. Meyer, Carlos Ortiz

    "The Metropolitan Miami development, a downtown mixed-use complex developed by Miami-based MDM Development Group, has weathered the economic downturn by adapting to the needs and pressures of the loca

    Jan 1, 2012

  • DFI
    Interpreting Strain Measurements From Load Tests In Bored Piles

    By Jack Hayes

    Vibrating wire strain gages have proven to be a very reliable and effective tool for the measurement of strains associated with the loading of bored piles (drilled shafts). However, when these strains

    Jan 1, 2002

  • DFI
    Analysis Of Vibratory Driven Pile ? Introduction

    By Sherrill Gardner

    Vibratory drivers have been used since the 1930s to drive and extract piles. Vibratory pile drivers have the capability of significantly decreasing pile installation time, especially in granular type

    Jan 1, 1987

  • DFI
    The Behavior And Design Of Piled-Raft Foundations Under Lateral Loading

    By Serge Borel

    An efficient design method is proposed for "piled-footing" and "piled-raft" foundation under lateral loads. It combines the methods used for the displacement design of shallow and deep foundations and

    Jan 1, 2002

  • DFI
    Replacement Bored Piles for the Houphouet-Boigny Bridge, Cote D'ivoire

    By Adrian Mercer, Ashkan Ameri

    Due to general degradation, increased traffic levels, and historical ground movement, this road and rail bridge which provides an essential link between the interior of the country and the Port of Abi

    Sep 8, 2021