Berth Deepening A Three Decade Old Wharf Structure For The Next Generation Of Container ShipsBy Bill Paparis
The thirty year old wharf structures at the Port Authority of New York & New Jersey?s Port Elizabeth Marine Terminal are being modernized for the next generation of Post-Panamax container ships, which
Jan 1, 2013
-
Use Of Installation Effort To Evaluate And Design Drilled Displacement Piles In Fine-Grained SoilsBy W. Morgan NeSmith
A drilled displacement pile program was utilized for the expansion of an existing power plant in Cohasset MN adjacent to the Mississippi River. The drilled displacement (DD) pile is an innovative foun
Jan 1, 2008
-
Design And Construction Of Micropiles Each Subject To 110 Kips Of Lateral LoadBy Andrew Baxter
The Crystal Bridges Museum of American Art in Bentonville, Arkansas is a beautiful glass and concrete structure cut into a valley that mingles with water ponds spanned by multiple bridges with suspend
Jan 1, 2008
-
Large Diameter Steel Tubular Piles For Optimum Seismic PerformanceBy Ben C. Gerwick
Large diameter steel tubular piles installed vertically or on a slight rake, offer many advantages as the foundations of major overwater bridge in regions of high seismicity. By proper selection of di
Jan 1, 2013
-
Mobilisation Of Skin Friction In Bored Piles In Hong Kong ? IntroductionBy R. A. Fraser
Large diameter (1.0 to 2.5m) bored piles have been widely used to support buildings and elevated roadways in Hong Kong. Most of these piles are founded on a hard bearing stratum such as granitic or vo
Jan 1, 2010
-
Design And Analysis Of Cooling Tower Pile FoundationsBy Michael W. Oakland
This paper summarizes the analysis and design of a pile foundation system for two 400 ft. diameter, 500 ft. high cooling tower using a detailed finite element analysis package. The cooling towers are
Jan 1, 2010
-
Numerical and Theoretical Analysis of Consolidation of Soft Clay Installed With PVD at Nagapattinam - A Case StudyBy KeerthiRaaj Subrmanian, Muthukkumaran Kasinathan
"A railway embankment is under construction between Nagapattinam to Thiruthuraipoondi covering 36.5 km. The sub-soil strata comprises of soft clay extending up to 10 m below existing ground level, whi
Jan 1, 2015
-
Evolution Of Deep Foundation Systems Used At The Port Ivory Intermodal Facility Site; 1906 ? 2004By Aly M. Mohammad
The Howland Hook Terminal Facility located in Staten Island, New York is one of the most active container terminals in the Northeast United States. Due to the high capacity of the facility, the Port A
Jan 1, 2004
-
7-Foot Diameter Drilled Shafts In Weathered Rock: Design, Load Testing, And ConstructionBy Aly M. Mohammad
The design of large diameter drilled shafts in weathered rock has always presented a challenge to the foundation engineers. Degree of weathering and load transfer mechanism through the rock are essent
Jan 1, 2003
-
Support For Deep Excavation In China ? SynopsisBy X. M. Wu
The paper describes four different types of support for deep excavations, which are currently used in China. Local experiences were illustrated by presenting case histories for each type of support. F
Jan 1, 2010
-
Port Said East Port Project - Deep Diaphragm Walls For The Quay Wall ConstructionBy Mamdouh Hamza
The construction of 1200 m length new quay wall located 1,300 m East of the existing Suez Canal bypass and about 1,000 m south of the Mediterranean shoreline is one of the main projects currently unde
Jan 1, 2002
-
DFI Model Piledriving Contractor ProposalWith respect to liability damages, claims and costs thereof relating to or ansmg out of contamination, special or non-special wastes, hazardous wastes or pollution in connection with the performance o
-
Session 20 "Grouting for Water Retaining Embankments"By Timothy Flaherty
We observed the boiling in the water very close to the water adjacent to where we were drilling. That only happened at the very beginning before it was switched to water flushing. Yes, it was performe
Feb 10, 2003
-
Case History: Comparison of CSL Results to Physical ObservationsBy David S. Graham, Paul J. Axtell
Crosshole Sonic Logging (CSL) non-destructive integrity testing identified anomalous readings near the base of a 6.5-foot diameter drilled shaft rock socket. The anomaly was confirmed to be a defect b
Jan 1, 2019
-
Construction of Long Deep Mixing Columns by Low-Height RigBy Shigenori Horikawa, Nobutaka Tanaka, Toshiro Hara, Kengo Yamamoto
"The CDM-LODIC method(Low Displacement and Control method), a modified the CDM(Cement Deep Mixing) method, reduces the ground displacement through the removal of in-situ soil equivalent to the amount
Jan 1, 2015
-
Design Of Cost-Effective Retaining Wall At The Junction Of Approach Bridge Over A RampBy Dr. Anup Kumar Mandal, Partha Roy, Shuvranshu Kumar Rout, Dipak Mandal, Biswajit Das
Installation of a new scalping station with bunker, apron feeder, scalping screen, ramp -retaining wall and approach bridge was planned in an existing integrated complex of phosphate fertilizer at a r
Sep 1, 2022
-
The Test on Effect of Polyanionic Cellulose on Process of Filtrate Loss of Low Solid-Phase Drilling FluidBy Ping Yang, Tian-bin Li, Min-hui Wu
"The process of filtrate loss of low solid-phase drilling fluid at different content of polyanionic cellulose is investigated by the standard filtration test. The test results showed that when time of
Jan 1, 2017
-
Preliminary Assessment of Reliability and Sampling Requirements for Deep Mixing Method (DMM) Foundations for LNG Processing Facility and Storage Tank (52fd79c3-58e2-4970-9b21-5f8e12930105)By Paul Summers, Kevin Richardson, Willem (Billy) Villet, Paul J. Sabatini, Attasit Korchaiyapruk, Edward C. Clukey
"A deep mixing method (DMM) foundation was selected by the Project Team for a very large LNG facility in West Africa. As described in a companion paper, this foundation consists of a large number of c
Jan 1, 2017
-
Preliminary Assessment Of Reliability And Sampling Requirements For Deep Mixing Method (Dmm) Foundations For Lng Processing Facility And Storage TankBy Edward C. Clukey
A deep mixing method (DMM) foundation was selected by the Project Team for a very largeLNG facility in West Africa. As described in a companion paper, this foundation consists of alarge number of colu
-
Analysis and Behavior of Double Sheet Pile CofferdamBy Kamil Nuzha, Jianchao Li, Bashar S. Qubain
"The Philadelphia Water Department is rehabilitating Belmont Raw Water Basin. As part of this work, a 500-ft long, temporary cofferdam was designed to retain 35 ft of combined water and soil at the we