    Deep Foundation Solutions And Implementation For Pittsburgh International Airport Midfield Terminal ? 1.0 Introduction

    By Peter Florian

    At 5:50 am on October 1, 1992, the new $800 million Pittsburgh International Airport Midfield Terminal opened its gates to the world after five years of construction and more than 24 years of planning

    Jan 1, 1993

  • DFI
    Damage To Initially Bent Piles ? Synopsis

    By B. B. Broms

    A method for calculating the bending moment induced in misaligned or bent piles is described, The maximum bending moment varies with the angular rotation between the pile segments, the coefficient of

    Jan 1, 2010

  • DFI
    Estimating N Value from Data in Press-In Piling

    By Yukihiro Ishihara, Nanase Ogawa, Ming Lei

    "Abstract In the Press-in Method, a static jacking force is used to install a prefabricated pile, while a reaction force is gained from previously installed piles. This piling technique has solved pro

    Jan 1, 2014

  • DFI
    Use Of Auger Pressure Grouted (APG) Piles Inside An Existing Operational Structure

    By Lawrence P. Goldfarb

    The City of Alexandria, Virginia, Public Safety Center (PSC) is a 64,000 square foot facility that houses the Police Department, Office of Sheriff and the Office of Magistrate. In addition, the center

    Jan 1, 2009

  • DFI
    High Risk Control For Piling And Deep Foundations - A Systematic Approach

    By Martin van Staveren

    In today's rapid changing construction world, the business pressures on piling and deep foundations reach sky-high levels. Ever increasing complexity of construction projects do severely contribu

    Jan 1, 2006

  • DFI
    Piling Problems - Introduction

    By D. Millgard

    Dennis Millgard introduced the Session by hoping that participants to the Conference would also share their piling problems. He then invited the first speaker to present his paper. Paper 5.1.

    Jan 1, 1991

  • DFI
    Woodrow Wilson Bridge Cofferdams (ef6ed0b3-5c8c-41f1-8337-00ee57bff823)

    By Roderic A. Ellman

    The new Woodrow Wilson Bridge (WWB) will replace the existing bridge over the Potomac River to connect Alexandria, Virginia to Prince Georges County, Maryland. The new WWB will extend approximately 1.

    Jan 1, 2013

  • DFI
    Comparison of a and ß Methods with CPT and Pile Load Test Data: A Case Study with Attention on Soil Setup Effects

    By Mohammadreza Khanmohammadi, Kazem Fakharian

    "AbstractIn driven piles, the gradual dissipation of excess pore water pressure and consequently the soil setup significantly contribute to increasing the pile capacity with time. The question is rise

    Jan 1, 2014

  • DFI
    The Impact Of Vibro Compaction Adjacent To Large Vertical Maritime Retaining Structures

    By Barry C. Slocombe

    The development of new ports, extensions of existing facilities and reclamation of former docks will involve consideration of a variety of geotechnical problems. This paper presents data including in

    Jan 1, 2008

  • DFI
    What Has Been Learned About Drilled Shafts From The Osterberg Load Test - Summary

    By Jorj O. Osterberg

    The Osterberg (O-Cell) Method makes it possible to separate the side shear resistance (skin friction) from end bearing. The O-Cell is placed on or near the bottom of a drilled shaft and after the conc

    Jan 1, 1999

  • DFI
    High Capacity Piles In The Hamilton Bayfront Area

    By C. D. Thompson

    Pile load test programs were carried out in 1984 and 1985 at Stelco's and Dofasco's Steel Making Plants in the Hamilton Bayfront area. 323.9 mm outside diameter by 9.5 mm wall thickness Grad

    Jan 1, 1987

  • DFI
    Settlement Behaviour Of Pile Foundation ? Synopsis

    By W. Y. Xu

    In comparison with shallow foundation, usually higher bearing capacity, smaller average settlement and better stability are the engineering characteristics of pile foundation. Besides, a smaller diffe

    Jan 1, 2010

  • DFI
    Route 49 (Penns Neck Bridge) Over Salem River

    By James E. Maccariella

    Replacement of an existing movable bridge with a new low level fixed bridge would not accommodate potential future navigation traffic. In order to replace the existing bridge in a cost effective m

    Jan 1, 2005

  • DFI
    Complex Piling Works At London Blackfriars Station

    By Jamie D. McEwan

    To cater for the future introduction of 12 car trains, London Blackfriars railway station is being extended from the north end to span across the River Thames. Following the demolition of existing bui

    Jan 1, 2011

  • DFI
    Crane Boom Loadings From Pile Driving

    By Alan G. MacKinnon

    Loads and stresses from pile driving are increasing from heavier piles and more powerful hammers. Stresses can be dangerous to equipment stability. Equipment developer MacKinnon tells how to compute s

    Jan 1, 1986

  • DFI
    Rock Sockets

    By D. E. Sherwood

    Mr. Tamaro introduced his paper which concerned the construction of foundations for the buildings and related infrastructure of the World Financial Center on a reclaimed shoreline site at the Southern

    Jan 1, 1991

  • DFI
    Lateral Earth Pressure On Lagging In Soldier Pile Wall Systems

    By Howard A. Perko

    Soldier pile and lagging is a conventional means of temporary excavation shoring. Timber lagging design has traditionally been based upon the designer's experience or empirical rules. One such me

    Jan 1, 2008

  • DFI
    Large Diameter Piles For Deep Foundation Of Orsang Aqueduct - Synopsis

    By A. B. Desai

    The construction of 1144 nos. of piles, each 1.5 m diameter, bored-cast-in-situ type and varying in depths from 6.5 to 23m, has been completed as foundation for 26 piers of 548 m long aqueduct across

    Jan 1, 1996

  • DFI
    List Of Exhibitors

    A technical exhibition was held in conjunction with the 4th DFI International Conference on Piling and Deep Foundations, Stresa. The exhibition was located in the ground floor of the Conference Hall.

    Jan 1, 1994

  • DFI
    Augered Cast-In-Place Concrete Piles In Flood Plains - 1.0 Introduction

    By Javaid M. Alvi

    This paper is an attempt to outline the emergence of Augered Cast-ln-Place piles as one of the more economical types of foundation for supporting high-rise buildings and heavily loaded structures rece

    Jan 1, 2001