Deep Foundation Solutions And Implementation For Pittsburgh International Airport Midfield Terminal ? 1.0 IntroductionBy Peter Florian
At 5:50 am on October 1, 1992, the new $800 million Pittsburgh International Airport Midfield Terminal opened its gates to the world after five years of construction and more than 24 years of planning
Jan 1, 1993
-
Damage To Initially Bent Piles ? SynopsisBy B. B. Broms
A method for calculating the bending moment induced in misaligned or bent piles is described, The maximum bending moment varies with the angular rotation between the pile segments, the coefficient of
Jan 1, 2010
-
Estimating N Value from Data in Press-In PilingBy Yukihiro Ishihara, Nanase Ogawa, Ming Lei
"Abstract In the Press-in Method, a static jacking force is used to install a prefabricated pile, while a reaction force is gained from previously installed piles. This piling technique has solved pro
Jan 1, 2014
-
Use Of Auger Pressure Grouted (APG) Piles Inside An Existing Operational StructureBy Lawrence P. Goldfarb
The City of Alexandria, Virginia, Public Safety Center (PSC) is a 64,000 square foot facility that houses the Police Department, Office of Sheriff and the Office of Magistrate. In addition, the center
Jan 1, 2009
-
High Risk Control For Piling And Deep Foundations - A Systematic ApproachBy Martin van Staveren
In today's rapid changing construction world, the business pressures on piling and deep foundations reach sky-high levels. Ever increasing complexity of construction projects do severely contribu
Jan 1, 2006
-
Piling Problems - IntroductionBy D. Millgard
Dennis Millgard introduced the Session by hoping that participants to the Conference would also share their piling problems. He then invited the first speaker to present his paper. Paper 5.1.
Jan 1, 1991
-
Woodrow Wilson Bridge Cofferdams (ef6ed0b3-5c8c-41f1-8337-00ee57bff823)By Roderic A. Ellman
The new Woodrow Wilson Bridge (WWB) will replace the existing bridge over the Potomac River to connect Alexandria, Virginia to Prince Georges County, Maryland. The new WWB will extend approximately 1.
Jan 1, 2013
-
Comparison of a and ß Methods with CPT and Pile Load Test Data: A Case Study with Attention on Soil Setup EffectsBy Mohammadreza Khanmohammadi, Kazem Fakharian
"AbstractIn driven piles, the gradual dissipation of excess pore water pressure and consequently the soil setup significantly contribute to increasing the pile capacity with time. The question is rise
Jan 1, 2014
-
The Impact Of Vibro Compaction Adjacent To Large Vertical Maritime Retaining StructuresBy Barry C. Slocombe
The development of new ports, extensions of existing facilities and reclamation of former docks will involve consideration of a variety of geotechnical problems. This paper presents data including in
Jan 1, 2008
-
What Has Been Learned About Drilled Shafts From The Osterberg Load Test - SummaryBy Jorj O. Osterberg
The Osterberg (O-Cell) Method makes it possible to separate the side shear resistance (skin friction) from end bearing. The O-Cell is placed on or near the bottom of a drilled shaft and after the conc
Jan 1, 1999
-
High Capacity Piles In The Hamilton Bayfront AreaBy C. D. Thompson
Pile load test programs were carried out in 1984 and 1985 at Stelco's and Dofasco's Steel Making Plants in the Hamilton Bayfront area. 323.9 mm outside diameter by 9.5 mm wall thickness Grad
Jan 1, 1987
-
Settlement Behaviour Of Pile Foundation ? SynopsisBy W. Y. Xu
In comparison with shallow foundation, usually higher bearing capacity, smaller average settlement and better stability are the engineering characteristics of pile foundation. Besides, a smaller diffe
Jan 1, 2010
-
Route 49 (Penns Neck Bridge) Over Salem RiverBy James E. Maccariella
Replacement of an existing movable bridge with a new low level fixed bridge would not accommodate potential future navigation traffic. In order to replace the existing bridge in a cost effective m
Jan 1, 2005
-
Complex Piling Works At London Blackfriars StationBy Jamie D. McEwan
To cater for the future introduction of 12 car trains, London Blackfriars railway station is being extended from the north end to span across the River Thames. Following the demolition of existing bui
Jan 1, 2011
-
Crane Boom Loadings From Pile DrivingBy Alan G. MacKinnon
Loads and stresses from pile driving are increasing from heavier piles and more powerful hammers. Stresses can be dangerous to equipment stability. Equipment developer MacKinnon tells how to compute s
Jan 1, 1986
-
Rock SocketsBy D. E. Sherwood
Mr. Tamaro introduced his paper which concerned the construction of foundations for the buildings and related infrastructure of the World Financial Center on a reclaimed shoreline site at the Southern
Jan 1, 1991
-
Lateral Earth Pressure On Lagging In Soldier Pile Wall SystemsBy Howard A. Perko
Soldier pile and lagging is a conventional means of temporary excavation shoring. Timber lagging design has traditionally been based upon the designer's experience or empirical rules. One such me
Jan 1, 2008
-
Large Diameter Piles For Deep Foundation Of Orsang Aqueduct - SynopsisBy A. B. Desai
The construction of 1144 nos. of piles, each 1.5 m diameter, bored-cast-in-situ type and varying in depths from 6.5 to 23m, has been completed as foundation for 26 piers of 548 m long aqueduct across
Jan 1, 1996
-
List Of ExhibitorsA technical exhibition was held in conjunction with the 4th DFI International Conference on Piling and Deep Foundations, Stresa. The exhibition was located in the ground floor of the Conference Hall.
Jan 1, 1994
-
Augered Cast-In-Place Concrete Piles In Flood Plains - 1.0 IntroductionBy Javaid M. Alvi
This paper is an attempt to outline the emergence of Augered Cast-ln-Place piles as one of the more economical types of foundation for supporting high-rise buildings and heavily loaded structures rece