Organization
  • DFI
    Application Of Neurofuzzy Approach To Estimate Duration And Evaluate Delay For Diaphragm Wall And Barrette Construction

    By Thoedtida Thipparat

    The diaphragm walls and barrettes are very important to the constructions of multi-storeyed buildings, elevated expressways, subway railway stations, etc. Uncertainties particularly increase in accord

    Jan 1, 2006

  • DFI
    Centrifuge Test on Reduction of Lateral Flow of Liquefied Ground by Stabilized Columns

    By Shinji Sassa, Naoki Takahashi, Eiji Kohama, Wakaki Tsuda, Hidenori Takahashi, Ikuo Towhata, Yoshiyuki Morikawa

    "Abstract Deep mixing method has been employed increasingly in recent years as a countermeasure against subsoil liquefaction. Column-type solidification, however, has been thought to have little effec

    Jan 1, 2014

  • DFI
    Pile Load Test On 1200 Mm Dia Pile In Cemented Soil - Synopsis:

    By B. Ramanathan

    The results of a pile load test on a 1200 mm dia and 25 m long bored Cast-in-situ pile in soft rock is reported. The subsoil has a high N value of above 60 from 7 m to 21 m. The soft rock was observed

    Jan 1, 1996

  • DFI
    A Comparison Of Static And Statnamic Load Tests In Sand: A Case Study Of The Bayou Chico Bridge In Pensacola, Florida ? Summary

    By Michael D. Justason

    This paper details the static and Statnamic load testing on a 600 mm square pre-stressed concrete pile. The pile was located at Pier 15 on the 20 million-dollar Bayou Chico Bridge Project in Pensacola

    Jan 1, 1997

  • DFI
    Single Pile Settlement Prediction And Analysis For Driven Piles

    By David R. Beadman

    The Fleming method is widely used for the analysis and prediction of single pile behaviour under maintained loading. The method does not distinguish between bored and driven piles. Driven piling avoid

    Jan 1, 2006

  • DFI
    Static Alternating Cyclic Horizontal Load Tests On Driven Steel Pipe Piles Of Foundations For Highway Bridges

    By Kouichi Tomisawa

    Two bridges were constructed for extension work of Central Hokkaido Connection Road in 2005 at two different sites. Pile group foundations were employed for the foundations of abutments of the two bri

    Jan 1, 2006

  • DFI
    Statnamic Pile Testing Case Studies

    By Michael J. Brown

    It is often necessary to undertake some form of pile testing to verify design calculations. Historically this has been limited to static and dynamic tests. Newer rapid testing methods such as Statnami

    Jan 1, 2006

  • DFI
    Time Dependent Open-End Pipe Pile Capacity Assessment By Dynamic And Quasi-Static Methods

    By Derrick D. Dasenbrock

    Three piers of a new river bridge are supported on 1.067 m diameter open-end steel pipe piles. At time of drive, and after pile re-strikes, high-strain dynamic capacity values at plan tip elevations,

    Jan 1, 2006

  • DFI
    Re-Use Of Foundations And The Role Of NDE Techniques

    By Huw Williams

    It is becoming increasingly common practice to re-use existing foundations for new projects, especially on urban sites where geotechnical conditions are congested. A knowledge of the foundation dimens

    Jan 1, 2006

  • DFI
    Extrapolation of Unit Side Resistance in Drilled Shaft Foundations Based on Bi-Directional Load Test Data

    By Ramin Motamed, Joseph A. W. Toth

    Evaluation of the capacity of large-diameter drilled shafts using current load test methods present challenges when considering the magnitude of loads required to fully mobilize their capacities. Ofte

    Jan 1, 2018

  • DFI
    Rapid Lateral Load Testing Of Deep Foundations

    By Dan A. Brown

    This paper describes a method of conducting rapid lateral loading tests of deep foundations in which the load is applied to the foundation with a time duration of less than one second. For purposes of

    Jan 1, 2007

  • DFI
    Man - Organisation - Technology - Proposals For Optimising Preventive Work

    By Walter Ensinger

    Working safely means working cost-effectively. Every "dangerous occurrence" and - even more so - every industrial accident causes disruptions in the planned course of construction. Besides moral and l

    Jan 1, 2006

  • DFI
    Efficacy and Execution of Floating Lattice-Shaped Cement Treatment against Liquefaction

    By Sachihiko Tokunaga, Hirofumi Taguchi, Kenji Maruyama, Hidenori Takahashi, Yoshiyuki Morikawa

    "Abstract The present study proposed a new liquefaction countermeasure to improve sandy ground and conducted a trial execution. The new method is a floating-type and lattice-shaped cement treatment me

    Jan 1, 2014

  • DFI
    Helical Pile Foundation Anchors As A Practical Alternative

    By Dilip Khatri

    Helical pile anchors have gained acceptance over the past sixty years. Most recently they have been commonplace in the 20th century for the power utility industry in anchoring transmission towers, equ

    Jan 1, 2003

  • DFI
    Deep Excavation In The Shanghai Soft Clay Under Protection Of A Cast-In-Situ Retaining Wall ? Synopsis

    By M. Pernot

    A 12 m-deep excavation has to be perfomed in the Shanghai soft clay to install an underground electric substation. This article was originally intended to study the behaviour of the wall, the excavati

    Jan 1, 2010

  • DFI
    Recycling Jet Grout Backflow: Waste Mitigation and Cost Benefits

    By Craig T. Jones, Zachary Q. Maassen

    "Jet grouting is a method of ground improvement that relies on the erosive capacity of high-speed jets to cut and mix the ground in place with a cementitious grout. A continuous return flow of cutting

    Jan 1, 2017

  • DFI
    Water Tightness Of Diaphragm Walls

    By Radianto Elprama

    For the realisation of the underground railway line RandstadRail in the city area of Rotterdam a bored tunnel is under construction. Diaphragm walls up to a depth of about 40 m were used to construct

    Jan 1, 2006

  • DFI
    Pile Test Results - 1-15 Corridor Reconstruction Project, Salt Lake City, Utah (Abstract Only) - DFI Member Conference - Seattle, 1998

    By D. M. Holloway

    As a part of the 1-15 Reconstruction Project, static and dynamic (high-strain) testing methods formed the basis to estimate long-term axial capacities, and to assess the magnitudes of bearing capacity

    Jan 1, 1998

  • DFI
    Capacity Of Piles And Settlement Of Pile Foundations

    By M. Mets

    Pile foundations have been used in Estonia since the beginning of 1960's. To evaluate the capacity of piles nearly 2,500 pile tests and 1,800 pile loading tests Have been carried out. The pile fo

    Jan 1, 2000

  • DFI
    Confinement Of Two Contaminated Sites In A Petrochemical Plant; Case History

    By Raffaella Granata

    The paper deals with the remediation of two areas formerly utilized for the disposal of hazardous wastes in a petrochemical plant. The works, designed on the basis of the criteria of maximum safety an

    Jan 1, 2006