    Realization Of An Innercity Car Park By Means Of A Complex Underpinning Measure

    By Robert Thurner

    The underground car park "Admonterhof in the historical centre of Graz is an example for the technical and economical success of a complicated structural design using a concept on the basis of the obs

    Jan 1, 2006

  • DFI
    Securing Rail Infrastructure in Romania

    By Andreas Brandner

    "At the beginning of 2007 the Austrian contractor PORR was awarded with remediation works for a 48-km long part of the railway line from Campina to Predeal – part of the Trans European main Corridors

    Jan 1, 2017

  • DFI
    5 Pile Testing - Pile Testing

    By George Goble

    I hope that after the long evening and all the exercise that some of you took you won't be completely exhausted to listen to a little bit about pile testing. The topic that 1 have been given is

    Jan 1, 1994

  • DFI
    Soil-Cement Pile Foundations For A Large Storage Tank And Retaining Wall - Case History - Summary

    By Roy A. Bell

    A 200-foot diameter, 72-foot high petroleum storage tank was built in a hillside ravine where a portion of the site contained soft clay fill. Soil-cement piles, 40 inches in diameter and up to 38 feet

    Jan 1, 1997

  • DFI
    Revitalizing Hillside Using Stabilization Piers Monitored By 3-D Mems-Based Inclinometers

    By Peter Chou

    A total of 117 slope stabilization drilled piers were installed as part of a major hillside revitalization project. The 110-million dollar development, known as Stratford at Kenwood, included an 18-st

    Jan 1, 2009

  • DFI
    Downtown Seattle Transit Project - International District Station

    By Richard K. Sandaas

    Start Date: April 4, 1988 Completion Date: Dec. 29, 1989 Contractor: SCI Contractors Past and present transportation centers will come together at International District Station, located at th

    Jan 1, 1990

  • DFI
    Current State Of Practice Of Corrision Protective Systems For Tierods And Tiebacks Used In Marine Applications ? Introduction

    By Thomas A. Printz

    The wide use of carbon steel in construction and engineering projects makes this engineering material accountable for approximately 85% of the total annual steel production worldwide. Despite the lac

    Jan 1, 2013

  • DFI
    Improvement Of The Cost-Effectiveness Of H-Bearing Piles By Using High-Strength Histar Steels. - Summary

    By Lucien P. Weber

    Over the last few years, increased customer demands as well as strong competition from substitute materials have accelerated the development of advanced technologies to improve both the performance an

    Jan 1, 1997

  • DFI
    Reinforcement of Existing Deep Foundations with Micropiles

    By Mauricio Terceros, Martin Achmus, Freddy Lopez

    The massive use of deep foundations had a remarkable influence in the building industry in the 20th century. Piles and micropiles made possible to erect thousands of civil structures around the world,

    Jan 1, 2018

  • DFI
    Use Of Controlled Modulus Columns In Retail & Industrial Development Projects

    By Frederic Masse

    With widespread acceptance in the market place, many engineers are choosing ground improvement techniques to provide suitable foundation subgrade at sites that would have traditionally required deep f

    Jan 1, 2011

  • DFI
    Foundation Retrofitting Using Micropiles - A Case History

    By Mohammad Nasim

    Vertical expansion of existing structures frequently requires foundation retrofitting to enhance the capacity of existing foundations for supporting additional loads. Owing to their small diameter, a

    Jan 1, 2008

  • DFI
    Deep Foundations In Karst - Lessons Learned From I-40 Corridor Widening In Knoxville, Tennessee

    By James L. Vinson

    Wilbur Smith Associates (WSA) has provided planning, engineering and construction oversight assistance to the Tennessee Department of Transportation (TDOT) for three construction projects intended to

    Jan 1, 2006

  • DFI
    Differing Site Conditions

    By James J. Tansey

    A Deep Foundations Institute meeting with the University of Michigan at Ann Arbor in March of 1984 featured legal rights under Differing Site Conditions. A workshop conducted by the authors and Gerard

    Jan 1, 1985

  • DFI
    Micropiles At The Transformation Ago Project

    By Jim Bruce

    The Transformation AGO project, constructed between 2005 and 2008, featured a foundation trade contract that included design of pile caps and grade beams and construction of 138 permanent micropiles.

    Jan 1, 2011

  • DFI
    Drilled Piers In The Piedmont - Introduction

    By Stanley A. Schwartz

    In the Piedmont, heavily loaded structures are generally supported by either drilled piers or one of several pile types. The choice of drilled piers or piles is typically one of comparative costs. The

    Jan 1, 1988

  • DFI
    Diaphragm Wall Construction In Hong Kong

    By Arturo Ressi di Cervia

    The utilization of diaphragm wall construction in Hong Kong began in 1974 with the construction of the New World Center, the first diaphragm wall job built in the British Colony. That landmark job

    Jan 1, 1993

  • DFI
    Pile Design, Testing, And Installation For A Gated Dam ? Synopsis

    By B. H. Moore

    The opportunity to evaluate the pile design procedures used on a major project is an infrequent occurrence. It is even more infrequent that the project involves piles with significant tension and hori

    Jan 1, 2010

  • DFI
    Slurry Wall Design For Hong Kong Station

    By Stephen T. Young

    The construction of Phase 2 of Hong Kong Station, its retail podium and International Finance Centre Two, the tallest building in Hong Kong, will be completed in the middle of 2003. This paper describ

    Jan 1, 2003

  • DFI
    Once Again, Engineering And Contractor Tenacity Overcome Tough Geology

    By John E. Lens

    How much trouble can narrow vertical fissures in bedrock cause on a shallow bedrock site? Enough trouble so end-bearing H-piles range between 8 and 100 feet long in a single pile cap and tiebacks ran

    Jan 1, 2006

  • DFI
    Developing Effective Specifications For Tremie-Concrete Placement In Drilled Shafts

    By Giuliana A. Zelada-Tumialan

    Reduced workability and flowability of the concrete through the tremie tubes and drilled shaft reinforcement have been identified as the main causes of tremie-concrete drilled shaft concrete defects.

    Jan 1, 2009