Application of Innovative Underreamed Ground Anchorage with CapsuleBy Gang Guo, Zhong Liu
"In response to an increasing demand of anchored structures for underground space and transportation infrastructure in China, an innovative underreamed ground anchorage system was created. The novel a
Jan 1, 1900
-
Installation Of Three Up To 120M Deep Diaphragm Wall Shafts, With Diameters Between 8M And 35M At Woodsmith Mine In North Yorkshire (England)By Gustav Jahner, Michael Baltrusch, Norbert Hoffmann
Near the port city of Whitby in the north-east of England, Anglo American (AA) is setting up the deepest mine in the UK, which will have a depth of 1,500m. The purpose of the project is to extract and
Sep 1, 2022
-
Deep Excavation Support: Innovative Shoring Design in an Urban EnvironmentBy Richard D. Luark, Fernanda S. Madrona
Designing temporary retaining systems that allow for deeper excavation amid the existing urban infrastructure has become a challenge. A 60-foot-deep excavation in downtown Seattle was required to cons
Jan 1, 2019
-
Direct Power Compaction - a New Deep Vibro-Compaction Method for Liquefaction Mitigation of Hydraulically Placed Sand Layers in San Francisco BayBy Nozomu Kotake, Rakshya Shrestha, Ralph Griffin, Stefanos Papadopulos, Jeff Fippin, Sushil Kafle
Direct Power Compaction (DPC) is a deep Vibro-compaction method used for liquefaction mitigation. In DPC, H-beams are used as vibrating rods penetrating deep into the ground, and a vibrating force is
Sep 8, 2021
-
FHWA Hollow Bar Soil Nail (HBSN) Test Program, A SummaryBy Jesús E. Gómez
Verification and production testing of soil nails requires debonding the upper section of the soil nail to isolate the portion of the soil nail intended for testing within a specific ground type. In p
Jan 1, 2011
-
Developments In Thermal Integrity Testing Practice And InterpretationBy A. Fisher
The use of thermal integrity testing to verify the quality of deep foundations has increased significantly in the UK and other world markets over the last 5 years. The introduction of distributed fibr
Oct 1, 2022
-
Design and Delivery of Micropile Installation Leveraging Augmented and Virtual RealityBy Guilherme L. M. G. Carvalho, Zachary T. Fleming
In a world of 2-dimensional design documents, envisioning and understanding 3-dimensional interferences for complex foundation construction scenarios can be challenging. Videos and computer models ser
Jan 1, 2019
-
Controlling Thermal Stresses in Barrier WallsBy Karsten Beckhaus
Barrier walls in levees and dams are designed and constructed for new structures and for rehabilitation or upgrade of existing structures to control seepage. Construction methods applied are often dee
Sep 8, 2021
-
Foundations Of Self Drilling Micropiles In 4G And 5G Network Telecom Masts In IndiaBy Annika Gram, Teddy Johansson, Lutfi Ay
Micropiles transfer tension or compression forces as well as cyclic loads into the ground via skin friction. The Self Drilling Micropiles (SDM) can be utilized for permanent applications. The hollow b
Nov 1, 2022
-
Case Study of Deep Mix Pile Supported Diaphragm Wall for a Stilling Basin Structure in MalaysiaBy Chandrasegaran, Tamilmani
"This paper describes a case study of a retaining wall structure using a diaphragm wall to construct a stilling basin at Tanjung Bin T4 power plant in Johor Bahru, Malaysia. The stilling basin is part
Jan 1, 2015
-
Design Considerations For Laterally Loaded Free-Head Rigid Piles In Engineering PracticeBy O. Craciun, C. A. Bridges, M. Cai, J. Sugawara
There are a number of methods that can be adopted for predicting the ultimate lateral resistance of a free-head rigid pile, from the conventional Brinch Hansen and Broms solutions to three-dimensional
Nov 1, 2022
-
Bi-Directional Testing Using Super Cells for the Jiaxing-Shaoxing River Crossing BridgeBy Diane Reid, Antonio Marinucci, Robin Mao
Super Cells are an innovative, open-shaped bi-directional static load testing device used to promote concrete flow during placement while utilizing greater cross-sectional area of the pile to achieve
Jan 1, 2019
-
Seepage Barrier at Bolivar DamBy Mohamed Elgouhary, Carol L. Tasillo, Daniel Koziol
"The Bolivar Dam, located near the Village of Bolivar, Ohio is one of a system of dams designed to provide flood control and water conservation in the Muskingum Watershed. The Bolivar Dam is a “dry da
Jan 1, 2016
-
Centrifuge Modelling Of Displacement Piles and Installation EffectsBy J. Gniel, L. King, C. Gaudin, C. O’Loughlin
"This paper presents some recent advancements in centrifuge modelling, which enable the installation of displacement piles to be performed in-flight while measuring ground responses. Details and resul
Jan 1, 1900
-
Pile Design Philosophies For Coralline And Weak Carbonate RocksBy Rahul Wankhade, Sunil S. Baswankar, Aditya S. Kharatkar
Despite advances in pile design methodologies and piling techniques at site, difficulties and uncertainties still exists for design of piles particularly in coralline deposits and weak carbonate rocks
Sep 1, 2022
-
Foundations Of The 'Kö-Galerie' In Düsseldorf Using Top/Down Building TechnologiesBy P. Arz
With a total of five basement levels, ground floor and a further six levels above grade, construction of the Kö-Galerie building, on the Königsallee, in the centre of Düsseldorf, was completed with al
Jan 1, 1989
-
Construction And Stability Risks Of Fluid Supported Deep Excavations And Their Effects On Design ParametersBy Martin D. Larisch
The construction of diaphragm walls and most large-diameter bored piles (piers) is often carried out under drilling support fluids to temporarily stabilise the excavation prior to concrete placement.
Nov 1, 2022
-
SR167/70th Avenue East Vicinity Bridge Replacement ProjectBy Reda Mikhail, M. Birkan Bayrak
The Washington State Department of Transportation (WSDOT) State Route (SR) 167/70th Avenue East Vicinity Bridge Replacement Design-Build project is located in Fife, Washington. This $40 million projec
Sep 8, 2021
-
The Final Piece of the Puzzle: Re-Design Of Grouted Closures for a Dam Cutoff WallBy Daniel P. Stare, Lucian P. Spiteri, Christopher M. Hallahan, James C. Myers
Buckeye Lake Dam was substantially remediated between 2015 and 2018 as a result of unacceptable dam safety performance. A permanent seepage cutoff, consisting primarily of a soil mixed cutoff wall (SM
Jan 1, 2019
-
Instrumented Hybrid Shoring System for a Deep Temporary Excavation Incorporating Cutter Soil Mixing in Vancouver, BC, CanadaBy Nadir Ansari, Brian W. Wilson, Marina S. W. Li
"A hybrid shoring system consisting of cast-in-place soldier piles with Cutter Soil Mixing (CSM) infill panels was constructed for temporary support of a 19.8 m (65 ft) deep excavation in Vancouver, B
Jan 1, 2017