Search Documents

Search Again

Search Again

Refine Search

Publication Date
Clear

Refine Search

Publication Date
Clear
Organization
Organization
  • DFI
    Dynamic and Static Load Tests on Tapered Piles in Soils Exhibiting Time-Dependent Capacity Gain

    By Terrence M. Carroll, Chu E. Ho

    "A pile installation and load testing program on driven tapered piles was undertaken at John F. Kennedy International Airport in New York City for the extension of the existing Terminal 4. As part of

    Jan 1, 2015

  • DFI
    Dynamic Load Testing Of Augered Cast-In-Place Piles

    By Garland Likins

    High strain PDA testing has become common for verification of capacity of both driven and bored piles. It is equally applicable to Augered-Cast-in-Place (ACIP) Piles. It also evaluates other aspects o

    Jan 1, 2000

  • DFI
    Mediation Of Construction Disputes - An Advanced Preparation Guide For Mediation Of The Complex Construction Case - Introduction

    By Alan Alhadeff

    Why is mediation being hailed as the wave of the future? The high cost of putting on a trial, over-crowded court calendars and long trial delays have resulted in what prominent attorneys and leadi

    Jan 1, 1990

  • DFI
    Engineering The Mansion's Heritage

    By Ken MacLeod

    A development at 83 Queens Road in Melbourne, Australia required construction of a three level basement. The normal geotechnical constraints of excavating adjacent to an existing relatively new buildi

    Jan 1, 2006

  • DFI
    Soil-Structure Interaction Of A High-Rise Building Near Sensitive Structures In Soft Soil Conditions

    By Mohamed Hassan, Matthias Seip, Steffen Leppla

    In the east of Frankfurt am Main, Germany, a new high-rise building is planned directly next to the river Main. The high-rise building will have a height of about 75 m and will be founded on a Combine

    May 1, 2022

  • DFI
    The Role Of Real-Time Instrumentation In Large Infrastructure Projects

    By J. G. La Fonta

    The rapid development of real-time monitoring technology for the construction of large underground structures in urban areas can be attributed to: the zero-risk objective, the need for transparency be

    Jan 1, 2006

  • DFI
    Design, Construction, and Long-Term Monitoring of a Pile-Supported LNG Tank in Savannah, Georgia

    By Cheng Lin, Guoming Lin

    "This paper presents a case history for the design, construction and long-term performance monitoring of a driven prestressed concrete (PSC) piled foundation supporting a large liquefied natural gas (

    Jan 1, 1900

  • DFI
    DYNA Force-An Elasto-Magnetic Sensor For Force Measuring Of Post Tensioning Ground Anchors

    By Lucian Bogdan

    On many occasions during construction and service life of the structure, it is crucial to know the load in post tensioning tendons and anchors. Although there are many methods to measure the tendon fo

    Jan 1, 2009

  • DFI
    Drilled Pier Foundation In Hard Carbonate Rock ? Synopsis

    By K. E. Darnell

    Drilled pier foundations have long been a favored foundation type for heavily loaded structures. Drilled piers derive their load-bearing capacity from end-bearing, and/or sidewall friction. This type

    Jan 1, 2010

  • DFI
    Soil Improvement Using Gravel-Sand Columns for a Highway Project in Germany

    By Schmitz Stefan, Stephan Jee-Sun

    "Due to the reunion of Western and Eastern Germany in the late 80’s, a multitude of infrastructure projects had to be executed. A good portion of these projects required improvement of the motorway sy

    Jan 1, 2015

  • DFI
    Development of Lattice-Shaped Cement Treatment Method for Liquefaction Countermeasure

    By Seiji Mizutani, Hirofumi Taguchi, Makoto Yoshida, Hidenori Takahashi, Naotoshi Shinkawa, Kazuo Konishi, Yoshiyuki Morikawa, Masaya Kawata

    "The lattice-shaped cement treatment method has been used to improve the seismic performance of liquefied sandy soil in Japan. The efficacy of the method has been confirmed by the huge earthquake in J

    Jan 1, 2015

  • DFI
    Comparison of LRFD Resistance Factors to Tension Pile Load Tests

    By Seth H. Hamblin, John E. Regan, Dimitrios Palantzas

    "Through reliability-based calibration of larger pile load test databases, recent developments of the Load Resistance Factor Design (LRFD) methods, which include geotechnical load and resistance facto

    Jan 1, 2015

  • DFI
    North American Geotechnical Exploration Practice ? Synopsis

    By C. O. Riggs

    Geotechnical exploration in North America, in particular, exploration for deep foundations analyses, is currently and generally performed following the most basic sampling and insitu testing methods a

    Jan 1, 2010

  • DFI
    Building The Devil’s Playground: How a Ground Improvement Program Eliminated the Need for Pile Foundations

    By Christian B. Woods, Joe C. Drumheller

    "Kenneth A. Huber, P.E., Langan Engineering & Environmental Services, New York, New York, USAThe dream to bring New Jersey Devils hockey to the largest city in New Jersey became a reality in the summe

    Jan 1, 2015

  • DFI
    Evaluating Installation Disturbance of Helical Anchors in Clay from Field Vane Tests

    By John Erikson, Alan J. Lutenegger, Nicholas Williams

    "In order to evaluate the level of disturbance produced in clays during installation, a series of single-helix and multi-helix anchors were installed at a test site consisting of a stiff overconsolida

    Jan 1, 2017

  • DFI
    Ground Improvement By Means Of Stabilising Columns

    By Georg Breitsprecher

    The technique of Stabilising Columns (product names are for example "Stabilisierungssaulen" (STS) or "Coplan Stabilisierungs-verfahren" (CSV)) is gradually becoming well accepted for ground improvemen

    Jan 1, 2006

  • DFI
    Micropile Performance Variability: A Fundamental Case Study

    By Walter E. Vanderpool

    Type 1B micropiles (Bruce and Juran, 1997) can be installed rapidly and efficiently. During an 85-day period, 536 micropiles were installed to depths of 61 meters within a site 41 meters by 43 meters.

    Jan 1, 2002

  • DFI
    Design Equations For Laterally Loaded Piles Embedded In Sand

    By T. G. Davies

    The paper presents design equations for singly laterally loaded piles embedded in sand. These equations were obtained from a comprehensive nonlinear analysis of free and fixed head piles subjected to

    Jan 1, 2010

  • DFI
    New Technique To Drive Piles By Impact Hammer Inside The Pile - Synopsis

    By Djk Arentsen

    A new technique to drive tubular piles by impact hammer inside the pile has confirmed a dramatic reduction of noise and the opportunity to save steel. Also a reduction in driving time and a higher bea

    Jan 1, 1996

  • DFI
    Augered Cast-In-Place Pile Load Tests On The Cincinnati, Ohio/Northern Kentucky Riverfront

    By Theodore W. Vogelpohl

    Augered cast-in-place piles have proven to be effective, adaptable and economical for projects throughout the Ohio River Valley. Specifically, they have been used extensively for high-rise structures,

    Jan 1, 2005