Search Documents
Search Again
Search Again
Refine Search
Refine Search
-
Kyoto Carbon CreditsBy H. Immink
Keywords: Kyoto Protocol, carbon credits, global warming, energy, auditing Climate change is nowadays being taken increasingly seriously, and the link between global warming and the carbon dioxide
Jan 1, 2006
-
Briquetted Chrome Ore Fines Utilisation In Ferrochrome Production At Zimbabwe AlloysBy N. N. Malila, N. R. Shoko
The ever-increasing pressure on the profit margins of ferro-chrome producers and the gradual depletion of deposits of rich hard lumpy chrome ores calls for the ferrochrome industry to maximise the use
Jan 1, 2004
-
Factors Influencing Base Metal Recovery From Waste Reverberatory Furnace Slags In A50 KVA Laboratory DC Plasma Arc FurnaceBy W. Banda
Paper written on project work carried out in partial fulfilment of Phd. (Process Engineering) degree* The recovery of cobalt and copper from waste slag was studied in a plasma DC-arc furnace in red
Jan 1, 2004
-
A Laboratory Investigation Into The Effect Of Specimen Size On The Strength Of Coal Samples From Different AreasBy J. N. Van der Merwe
The results of over 900 coal strength tests done during the period 1993?1994 for the SIMRAC project COL021A were re-analysed with a view to find a method to delineate areas or seams that can be groupe
Jan 1, 2003
-
Engineering Considerations In The Tolerability Of Risk - Mine And Occupational Health And Safety 2010 ? 1 RiskBy Noel C. Joughin
In making judgements on tolerable levels of risk in industry, and in all spheres of life, it needs to be understood that every action gives rise to risk. Without risk, nothing can be done. Without ris
Jan 1, 2011
-
Improved Technologies In Longhole Blast Hole Drilling, Applied To Drop Raising And Longhole Stoping As Well As The Application Of A Small Twin Boom Mechanized Drillrig?Longhole blast hole drilling? techniques are not new to the mining industry. Appropriate mechanization and improvement of the techniques and application has evolved from the industry requirements. T
Jan 1, 2003
-
Some Pitfalls And Misuses Of Rock Mass Classification Systems For Mine Design ? SynopsisRock mass classification systems are extensively used in rock engineering design work, and mine design is no exception. Among the systems most widely used for mining-related design work are the NGI 0-
Jan 1, 2012
-
Important Considerations In The Testing Of High-Density Tailings For Beach Profile Prediction ? SynopsisBy G. I. McPhail
The authors have conducted several investigations into the prediction of the beach profile of high-density tailings and have found that there are a number of important considerations that need to be t
Jan 1, 2012
-
Measurement of in situ stresses in deep drillholes for a hydroelectric projectBy N. Kumar, A. K. Dhawan, A. Varughese, S. K. Khullar
Abstract The in-situ stress field is one of the primary parameters influencing the performance of underground structures particularly in the Himalayas where there is strong influence of topography
Jan 1, 2003
-
The Impact Of The Draft Mineral And Petroleum Resources Royalty Bill On Gold Mine Reserves (7126a81e-7d07-4922-8a31-925a1ca29865)The latest Draft MPRRB was released for public comment in October 2006. The main purpose of the Bill is to collect royalties at mines developed in terms of new-order mineral rights granted through th
Jan 1, 2007
-
Sampling - A Critical Component To Gold Mining Project Evaluation (60ce14f9-844a-41ea-89be-138917950365)Poorly designed sampling protocols generally result in high project risk by artificially increasing grade variability (ie the nugget effect). Sample collection, preparation and assay protocols that su
Jan 1, 2007
-
Structural Dependence Of Alkali Oxide Activity In Coal Ash SlagsBy L Singheiser, W. Willenborg, M. Mueller, K. Hilpert
The limitation of fossil fuel resources and the necessity of reducing CO2emission require an increase of the efficiency of power plants by using combined cycle power systems. Pressurized Pulverized Co
Jan 1, 2004
-
Does Thickening Save Water? ? SynopsisBy A. J. Vietti
A pilot plant paste thickening campaign was conducted at the Anglo Platinum Limited Mogalakwena South Concentrator plant in South Africa in order to determine the water saving capability of P&TT techn
Jan 1, 2011
-
The influence of Fe3+/Fe2+ratio on the viscosity of silicate slagsViscosity measurement was carried out over a narrow range of silica content around the fayalite composition. A wide range of temperature and oxygen potential was covered where the slag was completely
Jan 1, 2004
-
Primary De-Oxidation Of Basic Oxygen Furnace Steel By Means Of CarbonBy C. Kloppers
The aim of this investigation was to reduce the cost of primary steel de-oxidation by substitution of aluminium primary de-oxidation with a practice that uses carbon. The cost of carbon is four times
Jan 1, 2001
-
Alignment Of SAMREC Reserve With Mining PlanBy L Tolmay, L Nair
Investor confidence can be compromised when one observes large discrepancies between the SAMREC reserves and the mining plan. It is therefore up to the responsible persons to ensure that all contribut
Jan 1, 2007
-
SPOTLIGHT on the 27th Annual Hendrik van der Bijl Memorial LectureBy A. N. Brown
The Hendrik van der Bijl Memorial Lecture is arranged annually under the auspices of the Pretoria Engineers Liaison Committee. This is a multidisciplinary Committee with representatives from eleven so
Jan 1, 1989
-
The gas-dynamic method of calculation of explosion-proof distances during explosions of methane-air mixture in mines with regard to explosion protective structuresBy D. Yu. Paleev, O. Yu. Lukashov, A. Yu. Krainov, E. R. Shrager, I. M. Vasenin
The gas-dynamic method is presented of calculation of explosion-proof distances during an explosion of the methane-air mixture in mine working. On the basis of this method is modelled of shock waves i
Jan 1, 2003
-
Implementation Of An Alternative Matte-Level Measurement Solution At Lonmin Marikana Smelter Division For Improved Process MonitoringBy T. J. Goff
Keywords: accurate control, matte level, smelting operations, process control, tapping, sounding bar, electromagnetic measurement [ ] Accurate control of matte levels during primary matte smelting
Jan 1, 2011
-
Mass Exchange At The Metal-Slag Interface In The Continuous Casting ProcessBy P. R. Scheller
Reactions between metal and slag are of decisive importance for metallurgical processing. In the continuous casting process, where metal solidifies at the metal-slag interface, reaction products can c
Jan 1, 2004