Search Documents

Search Again

Search Again

Refine Search

Publication Date
Clear

Refine Search

Publication Date
Clear
Organization
Organization
  • SME
    Machine Utilization Time Of NATM Method In Metro Tunnels: The Case Of Kadikoy-Kartal Metro Tunnels (Istanbul) ? Introduction

    By I. Ocak

    Initial investment for mechanical boring of tunnels is found to be high in most cases. Conventional drilling and blasting is not the possible especially in urban area. In these conditions impact hamme

    Jan 1, 2011

  • SME
    Educational Programs And Partnerships In Mineral Engineering

    By Wijnand Dalmijn, Hans de Ruiter

    Experience over the past eight years has proven that partnership and cooperation in mineral engineering education is essential to maintain programs in this field. At this moment the joint European Min

    Jan 1, 2005

  • SME
    The Role Of Occupational Health & Safety Management Systems In Implementing Best Management Practices For Self-Monitoring Programs In Mining Operations ? Introduction

    By A. Korchevisky

    Environmental self-monitoring is one of the advanced approaches for industrial sustainability programs. Organization for Economy Cooperation and Development (OECD) defines self-monitoring as ?the syst

    Jan 1, 2012

  • SME
    Hard Rock Pressure Tunnel Final Lining Design Guide Summary - NAT2022

    By Wern-ping N. Chen

    Pressure tunnel includes water-supply tunnels and tunnels for hydroelectrical power plants. Their design principles are different from those of water/wastewater/conveyance and transportation tunnels.

    Dec 1, 2022

  • SME
    Mining Foundation of the Southwest Selects 1999 honorees

    The Mining Foundation of the Southwest (MFSW)promotes public understanding and education related to the mining industry. Towards this goal, the Foundation has funded several projects from donations a

    Jan 1, 1999

  • SME
    Construction of a Mixed Face Reach Through Granitic Rocks and Conglomerate

    By John J. Murray, Michael T. McRae, Michael A. Krulc, Kathy L. Schuler

    The San Vicente Pipeline Tunnel Project involves the construction of an 8.5-foot-diameter water pipeline in an 11 mile tunnel in San Diego, California. The tunnel is located in extremely variable geol

    Jan 1, 2007

  • SME
    Beacon Hill Station Dewatering Wells and Jet Grouting Program

    By Zephaniah Varley, Dominic Parmantier, Paul Schmall, Richard Martin, Red Robinson

    Sequential excavation of the Beacon Hill Station has been accomplished in highly complex and inter-layered sand, silt, and clay soils with multiple perched groundwater tables. Successful excavation ha

    Jan 1, 2007

  • SME
    Industrial Minerals 2004 - Iodine

    By S. Krukowski

    Iodine is a bluish-black, crystalline solid with sub-metallic luster, and has a specific gravity of 4.93. It volatilizes (sublimates) at ordinary temperatures into a blue-violet gas that has an irrit

    Jan 1, 2005

  • SME
    Utilization Of Spent Potliners As A Fluidizer

    By S. Shrivastava, R. G. Reddy

    Spent potliner is generated in the electrolytic process of reducing alumina to make aluminum metal using molten fluoride electrolytes. Spent potliner (SPL), obtained at the end of the pots life contai

    Jan 1, 1999

  • SME
    Design Principles for Soft Ground Cutterheads

    By Werner Burger

    The last decade has witnessed a rapid development and application of slurry and EPB type tunnel boring machines. Both soft ground types are able to excavate tunnels in unstable ground conditions below

    Jan 1, 2007

  • SME
    Monitoring Reclaimed Mine Land For Stray CO2 Hazards

    By M. Moagabo

    CO2 emissions from carbonate laden reclaimed mine spoil has been shown to pose a hazard to residents in homes built on or adjacent to such land. The objective of this project was to develop a soil CO2

    Jan 1, 2012

  • SME
    National Western Mining Conference Attendance Mirrors Industry’s Upswing

    By Steve Kral

    For a state whose roots are in mining, most Colorado residents probably do not realize that the industry still contributes heavily to the state’s economy. In 2005, the industry contributed, directly

    Jan 1, 2006

  • SME
    Maximizing Value By Protecting Your Intellectual Property Assets ? Introduction

    By S. E. Chetlin

    In the mid-1970?s, the market value of tangible assets of S&P 500 companies far outstripped the value of intangible assets, including intellectual property (e.g., 83% tangible assets v. 17% intangible

    Jan 1, 2012

  • SME
    EPB Tunneling in Canada

    By Laura McNally

    In 2006 McNally International Inc. in a Joint Venture partnership with Aecon Constructors was the successful bidder on two York Region Tunnel Projects: Bathurst Collector/Langstaff Trunk Sewers; and Y

    Jan 1, 2008

  • SME
    Hindsight Is 20/20?Reverse Engineering Tunnel Risk Analyses

    By Lee W. Abramson

    Performing risk analyses on tunnel projects has become common place and on many projects it is required from an owner or regulatory perspective. After the project is planned, designed and constructed,

  • SME
    Mining Foundation of the Southwest Honors 2002 Inductees

    The 20th annual American Mining Hall of Fame Awards Banquet sponsored by the Mining Foundation of the Southwest will be held at the Westin La Paloma in Tucson, AZ, on Saturday, Dec. 7, 2002. This y

    Jan 1, 2002

  • SME
    Geotechnical And Structural Design Challenges Of The Fremont Central PARK Subway For The Bart WARM Springs Extension

    By Mitchell L. Fong

    The Bay Area Rapid Transit (BART) District will be extending BART service south along an 8.7-km (5.4-mile) -long corridor in the city of Fremont, California as part of the Warm Springs Extension (WSX)

  • SME
    New method allows for anchorage checkfor rock bolts

    By Gene Mattila, Ron Boyd

    Introduction Rock bolting is a general term that encompasses pinning, roof bolting, rib bolting, and cable bolting. Rock bolting contributes the highest nonproductive cost and is the most significant

    Jan 4, 1985

  • SME
    Hydro-Jex© Operations At Anglogold Ashanti?s Cripple Creek & Victor Gold Mine

    By T. Seal

    Hydro-Jex© releaching was undertaken during the summer of 2010 at the Valley Leach Facility (VLF) at AngloGold Ashanti?s Cripple Creek & Victor Gold Mine. Several advancements to the technique were m

    Jan 1, 2011

  • SME
    Site Specific Blasting Model For Mine-To-Mill Optimization

    By K. M. Kim

    A site-specific blasting model has been developed for the Asarco Mission mine. The main inputs to the model are the in-situ block size (F80), the post-blast fragmentation (P80) and the intact tensile

    Jan 1, 2011