Search Documents
Search Again
Search Again
Refine Search
Refine Search
-
Secondary Breakage In Taconite Open Pit MiningBy S. C. Howell
The mining of taconite, to provide feed for a processing plant, requires that the flow of material continue uninterrupted. This means first, that the crude must be of a size acceptable to the primary
Jan 1, 1968
-
Investigation of Spectroscopic Methods for Monitoring Diesel Particulate MatterBy A. L. Miller, A. J. Chambers, P. R. Griffiths, D. A. Parks
"Diesel engines are one of the primary contributors to the presence of nano and ultrafine aerosols in ambient air and occupational environments. Exposure to diesel emissions has been shown to contribu
Jan 1, 2018
-
The Ross Shaft Pillar Project At The Homestake MineBy M. E. Poad
In 1986, a cooperative effort by the Homestake Mining company, the U.S. Bureau of Mines and the University of Utah was initiated to determine shaft stability while recovering high grade ore in a nearb
Jan 1, 1994
-
The Potential Of Thin-Seam Mining Systems For Improving Safety And ProductivityBy J. A. Farinelli
In the Appalachian region of the United States, approximately 40% of the underground coal reserve base exists in seams 0.7 - 1.1m thick. These seams are, in general, often of premium quality and are f
Jan 1, 1987
-
Regional Economic Factors Influencing The Consumption Of Non-Metallic Mineral Construction Materials ? IntroductionBy Henry N. McCarl
[ ]
Jan 1, 1966
-
Packaged Continuous Hoisting - Underground To PlantBy D. G. Ball
Other than being used to convey fill material for the gob stowage or building of ribside packs on advancing longwell faces, pneumatic conveying has not been used for the transport of materials on a la
Jan 1, 1977
-
Cable Bolting For Pillar Recovery At The Magmont MineBy S. R. Dismuke
Ore at the Magmont Mine in southeast Missouri is extracted by the room and pillar method on two and sometimes three horizons. In 1991, an innovative plan was formulated for recovery of high grade ore
Apr 13, 2011
-
Role Of Kaolin Tailings Ponds In ConservationBy J. Iannicelli
Kaolin tailings ponds play an important role in reclamation of land and water. Discharges impounded from kaolin plants include oversize fractions consisting of coarse kaolin, mica, quartz as well as m
Jan 1, 1985
-
Mine Emergency Response Before, During, And Following A Large Underground Coal Mine FireBy R. L. Derick
The Orchard Valley Mine, a large underground coal mine located in western Colorado, experienced a major mine fire during an idled Sunday on June 1, 1986. This mine had extensive problems with spontane
Jan 1, 1993
-
Moisture Reduction Of Filter Cake By Improved Filter Design ? IntroductionBy D. A. Dahlstrom
With today's high energy costs per million BTU's, far greater emphasis is placed on increasing thermodynamic efficiency in the use of energy. America has long since discarded its previous go
Jan 1, 1983
-
Comminution Of Carbonate Minerals In A High-Pressure Roller MillBy E. Forssberg
Studies have been carried out with the High Pressure Roller Mill, HPRM, to produce calcium carbonate minus 10 micron. This paper presents the optimization of the specific grinding force of the HPRM sy
Jan 1, 1996
-
Removal Of Ammonia Nitrogen From Stormwater By Modified Fly Ash And ZeoliteBy P. Shang
Fly ash and zeolite have strong absorption to cations since their porous microstructure. The porosities of fly ash and zeolite can also be increased by modification, which improves the absorption of t
Jan 1, 2010
-
Heap Leach Recovery Study Based On Crushed Ore Particle Size Distribution and Compaction DegreeBy S. Lee, F. Campero
"Past heap leach design has evaluated hydrodynamic parameters based on a uniform particle size of heap material, but has ignored the equal importance of the instability of fine migration within heap s
Jan 1, 2016
-
Novel Method to Locate and Profile the Bed in a ThickenerBy R. D. Cook, J. L. Johnson
"Measuring mud bed level in a sedimentation device is an important control variable. Methods used to date for this purpose have had limited success providing continuous, consistent measurements at a r
Jan 1, 2015
-
Bucket Wheel Excavator Systems In Captain Mine, Southern IllinoisBy B. K. Gupta
Arch Mineral's Captain Mine has used the Bucket Wheel Excavator System(BWE) for over 3 years in conjunction with a 180 yd3 (138M3) stripping shovel. The bucket wheels prestrip the soft overburden
Jan 1, 1984
-
Cost-Per-Ton Improvement Ideas For Underground EquipmentBy J. Wiebmer
The two most important influencers of cost-per-ton in an underground mining machine are its productivity (tons/hour) and its availability-utilization (hours/year). Operating cost and initial price hav
Jan 1, 1997
-
Unstable Operating Ranges Of A Fan And Non-Achievable Quantity Ranges Of Airways In A Ventilation SystemBy S. Lin
Fan stall is a notorious phenomenon with axial-flow fans. When multiple fans of this type serve a ventilation system, their mutual impacts are very complicated and not well understood. Results from la
Jan 1, 1996
-
Estimation of Metabolic Heat for Refuge Alternative TestingBy T. E. Bernard
"Refuge alternatives (RA) provide shelter to miners trapped underground during a disaster. RA manufacturers must demonstrate that their RAs meet the Mine Safety and Health Administration (MSHA) requir
Jan 1, 2017
-
The Planning And Design Of The New 1000 M Haulage Level At LKAB MalmbergetBy A Pettersson
LKAB owns and operates two of the largest underground mines in the world in Northern Sweden. In Malmberget, with a production capacity of about 30,000 t/day of iron ore, the current main 815 m haulage
Jan 1, 1998
-
Simultaneous Determination Of Open Pit Mine Production Planning VariablesBy H. Sevim
Long term production planning in open pit mines requires the determination of cutoff grade, mining and milling production rates, mining sequence, mine life, and ultimate pit limits. These variables in
Jan 1, 1995