Search Documents

Search Again

Search Again

Refine Search

Publication Date
Clear

Refine Search

Publication Date
Clear
Organization
Organization
  • SME
    Secondary Breakage In Taconite Open Pit Mining

    By S. C. Howell

    The mining of taconite, to provide feed for a processing plant, requires that the flow of material continue uninterrupted. This means first, that the crude must be of a size acceptable to the primary

    Jan 1, 1968

  • SME
    Investigation of Spectroscopic Methods for Monitoring Diesel Particulate Matter

    By A. L. Miller, A. J. Chambers, P. R. Griffiths, D. A. Parks

    "Diesel engines are one of the primary contributors to the presence of nano and ultrafine aerosols in ambient air and occupational environments. Exposure to diesel emissions has been shown to contribu

    Jan 1, 2018

  • SME
    The Ross Shaft Pillar Project At The Homestake Mine

    By M. E. Poad

    In 1986, a cooperative effort by the Homestake Mining company, the U.S. Bureau of Mines and the University of Utah was initiated to determine shaft stability while recovering high grade ore in a nearb

    Jan 1, 1994

  • SME
    The Potential Of Thin-Seam Mining Systems For Improving Safety And Productivity

    By J. A. Farinelli

    In the Appalachian region of the United States, approximately 40% of the underground coal reserve base exists in seams 0.7 - 1.1m thick. These seams are, in general, often of premium quality and are f

    Jan 1, 1987

  • SME
  • SME
    Packaged Continuous Hoisting - Underground To Plant

    By D. G. Ball

    Other than being used to convey fill material for the gob stowage or building of ribside packs on advancing longwell faces, pneumatic conveying has not been used for the transport of materials on a la

    Jan 1, 1977

  • SME
    Cable Bolting For Pillar Recovery At The Magmont Mine

    By S. R. Dismuke

    Ore at the Magmont Mine in southeast Missouri is extracted by the room and pillar method on two and sometimes three horizons. In 1991, an innovative plan was formulated for recovery of high grade ore

    Apr 13, 2011

  • SME
    Role Of Kaolin Tailings Ponds In Conservation

    By J. Iannicelli

    Kaolin tailings ponds play an important role in reclamation of land and water. Discharges impounded from kaolin plants include oversize fractions consisting of coarse kaolin, mica, quartz as well as m

    Jan 1, 1985

  • SME
    Mine Emergency Response Before, During, And Following A Large Underground Coal Mine Fire

    By R. L. Derick

    The Orchard Valley Mine, a large underground coal mine located in western Colorado, experienced a major mine fire during an idled Sunday on June 1, 1986. This mine had extensive problems with spontane

    Jan 1, 1993

  • SME
    Moisture Reduction Of Filter Cake By Improved Filter Design ? Introduction

    By D. A. Dahlstrom

    With today's high energy costs per million BTU's, far greater emphasis is placed on increasing thermodynamic efficiency in the use of energy. America has long since discarded its previous go

    Jan 1, 1983

  • SME
    Comminution Of Carbonate Minerals In A High-Pressure Roller Mill

    By E. Forssberg

    Studies have been carried out with the High Pressure Roller Mill, HPRM, to produce calcium carbonate minus 10 micron. This paper presents the optimization of the specific grinding force of the HPRM sy

    Jan 1, 1996

  • SME
    Removal Of Ammonia Nitrogen From Stormwater By Modified Fly Ash And Zeolite

    By P. Shang

    Fly ash and zeolite have strong absorption to cations since their porous microstructure. The porosities of fly ash and zeolite can also be increased by modification, which improves the absorption of t

    Jan 1, 2010

  • SME
    Heap Leach Recovery Study Based On Crushed Ore Particle Size Distribution and Compaction Degree

    By S. Lee, F. Campero

    "Past heap leach design has evaluated hydrodynamic parameters based on a uniform particle size of heap material, but has ignored the equal importance of the instability of fine migration within heap s

    Jan 1, 2016

  • SME
    Novel Method to Locate and Profile the Bed in a Thickener

    By R. D. Cook, J. L. Johnson

    "Measuring mud bed level in a sedimentation device is an important control variable. Methods used to date for this purpose have had limited success providing continuous, consistent measurements at a r

    Jan 1, 2015

  • SME
    Bucket Wheel Excavator Systems In Captain Mine, Southern Illinois

    By B. K. Gupta

    Arch Mineral's Captain Mine has used the Bucket Wheel Excavator System(BWE) for over 3 years in conjunction with a 180 yd3 (138M3) stripping shovel. The bucket wheels prestrip the soft overburden

    Jan 1, 1984

  • SME
    Cost-Per-Ton Improvement Ideas For Underground Equipment

    By J. Wiebmer

    The two most important influencers of cost-per-ton in an underground mining machine are its productivity (tons/hour) and its availability-utilization (hours/year). Operating cost and initial price hav

    Jan 1, 1997

  • SME
    Unstable Operating Ranges Of A Fan And Non-Achievable Quantity Ranges Of Airways In A Ventilation System

    By S. Lin

    Fan stall is a notorious phenomenon with axial-flow fans. When multiple fans of this type serve a ventilation system, their mutual impacts are very complicated and not well understood. Results from la

    Jan 1, 1996

  • SME
    Estimation of Metabolic Heat for Refuge Alternative Testing

    By T. E. Bernard

    "Refuge alternatives (RA) provide shelter to miners trapped underground during a disaster. RA manufacturers must demonstrate that their RAs meet the Mine Safety and Health Administration (MSHA) requir

    Jan 1, 2017

  • SME
    The Planning And Design Of The New 1000 M Haulage Level At LKAB Malmberget

    By A Pettersson

    LKAB owns and operates two of the largest underground mines in the world in Northern Sweden. In Malmberget, with a production capacity of about 30,000 t/day of iron ore, the current main 815 m haulage

    Jan 1, 1998

  • SME
    Simultaneous Determination Of Open Pit Mine Production Planning Variables

    By H. Sevim

    Long term production planning in open pit mines requires the determination of cutoff grade, mining and milling production rates, mining sequence, mine life, and ultimate pit limits. These variables in

    Jan 1, 1995