Search Documents

Search Again

Search Again

Refine Search

Publication Date
Clear

Refine Search

Publication Date
Clear
Organization
Organization
  • SME-ICGCM
    Electromagnetic Seam Wave Mapping Of Roof Rock Conditions Across A Longwall Panel

    By Larry Stolarczyk

    The mining industry would benefit greatly by imaging geologic conditions well in advance of mining. In layered deposits such as coal, trona, quartz, and potash, natural waveguides form and enable elec

    Jan 1, 1999

  • SME-ICGCM
    Effects of Bolt Spacing, Bolt Length, and Roof Span on Bolt Loading in a Trona Mine

    By Steve P. Signer

    Researchers from the Spokane Research Laboratory of the National Institute for Occupational Safety and Health installed 39 instrumented, fully grouted bolts at six test sites in a trona mine retreat p

    Jan 1, 2001

  • SME-ICGCM
    lnterpanel Barriers for Deep Western U.S. Longwall Mining

    By Leo Gilbride

    Western U.S. longwall operators face increasing challenges with optimizing ground control and productivity as mines reach greater depths and coal bursting hazards increase. Some western U.S. mines, ma

    Jan 1, 2004

  • SME-ICGCM
    Analysis Of Cable Bolt Performance Using Numerical Modeling

    By M. Bouteldja

    A finite element modelling approach is developed for the evaluation of the mechanical performance of cable bolts supports in underground mine structures. The modelling approach permits the simulation

    Jan 1, 1999

  • SME-ICGCM
    Roof Bolting for Long-Term Entries in Underground Coal Mines

    By Peter Zhang

    As simpler and easier reserves are exploited to depletion, underground coal mining continues in more complex geologic settings and conditions. Roof bolting for long-term entry stability is always a ch

    Jan 1, 2011

  • SME-ICGCM
    The New Two-Dimension LaModel Program

    By Olayemi Akinkugbe

    As coal production in the United States continues to increase, the availability of unexploited or virgin fields continue to diminish. As a result, mine operators are forced to mine in unfavorable or m

    Jan 1, 2004

  • SME-ICGCM
    Time-Dependent Analysis Of Underground Opening Stability

    By Changshou Sun

    Excessive deformation occurred in the underground openings of Jinchuan Nickel Mine, the largest nonferrous underground mine in China. Developed in weak rock formations at great depth, the underground

    Jan 1, 1999

  • SME-ICGCM
    Influence of joints on the elastic response of a LFUFL stope to FEM mining

    By W. G. Pariseau

    A new approach to the direct inclusion of the effects of joints and geologic structure in rock mechanics analyses is applied to an elastic analysis of stability of a Lucky Friday undercut and 4111 lon

    Jan 1, 1989

  • SME-ICGCM
    Roof Bolt Response To Shear Stress: Laboratory Analysis (01deebbf-0c9c-422b-b7e0-1ccfd8e161d8)

    By Ed Mchugh

    Recent studies by researchers from the National Institute for Occupational Safety and Health indicate that shear loading contributes significantly to failure of bolts used for rock reinforcement in co

    Jan 1, 1999

  • SME-ICGCM
    A probabilistic approach to ground support design in underground mines,

    By Kevin Beauchamp

    In many cases traditional support designs cover the many variations in ground conditions and bolt performance by a conservative factor of safety. The result is that most bolts are ineffectual most of

    Jan 1, 2003

  • SME-ICGCM
    Ground Control Techniques Utilizing Polymer Grid Structures (6a308b5b-e28a-436d-9aed-f102a6943d1b)

    By Brian E. Travis

    Lightweight polymer grids have recently been introduced to the mining industry. They are currently being used for roof and rib control, longwall shield recovery, safety guarding or barricade, highwall

    Jan 1, 1992

  • SME-ICGCM
    The Design of Room and Pillar Mining Systems in the UK

    By Graham Daws

    State of the Art Room and Pillar mining techniques have been employed at two coal mines in the UK in the last two years. This paper describes the design of pillars and rockbolted support systems for R

    Jan 1, 1998

  • SME-ICGCM
    Geotechnical Planning Basis for the Optimization of Workings

    By Nikolaos Polysos

    Besides considering the given geomechanical conditions, the geological/geotechnical logging of drill cores and heading faces during the driving of parallel entries and the resulting rock classificatio

    Jan 1, 2003

  • SME-ICGCM
    Statistical Regional Calibration Of Subsidence Prediction Models

    By D. N. Cleaver

    Like other influence function methods, the SWIFT subsidence prediction program, developed within the Mineral Resources Engineering Department at the University of Nottingham, requires calibration to r

    Jan 1, 1995

  • SME-ICGCM
    International Conference On Ground Control In Mining Design Of Three-Entry System For Super Longwall Panels

    By J. D. Cole

    In order to reduce the number of longwall face moves and to increase the rate of gateroad construction, super longwall panels, 1000 feet wide and 12000 to 14000 feet long, are planned for Wolf Creek C

    Jan 1, 1990

  • SME-ICGCM
    Variation In The Load Transfer Of Fully Encapsulated Rockbolts

    By Paul Hagan

    A diverse range of rockbolt designs and resin anchors are available for use in underground mines. Despite their wide spread use, the factors that affect the performance a rockbolt is not fully underst

    Jan 1, 2004

  • SME-ICGCM
    Application Of A Static And Geophysical Monitoring System For Detection Of Stability Problems

    By Maleki. Hamid

    The U.S. Bureau of Mines implemented an inte¬grated static and geophysical monitoring program in a southern Wyoming mine to study changes in seismic wave propagation properties in roof strata. The pur

    Jan 1, 1993

  • SME-ICGCM
    Longwall Stability Analysis Of A Deep, Bump-Prone Western Coal Mine-Case Study

    By Lance R. Barron

    The U.S. Bureau of Mines, in cooperation with a central Utah coal .mine operator, began a study in July 1988 into longwall gateroad designs applicable to deep, bump- prone mine conditions. Prior to th

    Jan 1, 1990

  • SME-ICGCM
    Some Technical Considerations When Mining Under Bodies Of Water

    By John W. Fredland

    Conducting mining operations under a body of Water can create hazardous conditions for miners. The potential for a sudden inrush must be considered and abnormal ground control conditions can be encoun

    Jan 1, 1982

  • SME-ICGCM
    Geological Sensing - The Key To Increasing Miner Safety

    By J. R. M. Hill

    The U.S. Bureau of Mines is involved in research to improve geological sensing (or geo-sensing) techniques. This paper presents results from field trials of two research projects concerned with new te

    Jan 1, 1992