  • AUSIMM
    Some Key Facts and Concepts in the Evolution of Sampling and Assaying Practices at Codelco

    Incorrect sampling and measurement operations and misunderstanding the components of variability can cause huge economic losses to the mining industry. The main objective of this paper is to illustrat

    Jan 1, 2008

  • CIM
    Selective flotation of sphalerite from Pb-Zn ore without copper activation

    By M. Leroux, S. R. Rao, J. A. Finch

    "Poor Pb-Zn selectivity during Pb flotation in laboratory tests on a Mississippi Valley-type Pb-Zn ore was traced to apH effect. In the pH range, 9.5 to 11.0 sphalerite floated readily without copper

    Jan 1, 1987

  • AUSIMM
    The Wakamarina Gold-Scheelite-Quartz Lodes, Marlborough, New Zealand

    By R L. Brathwaite

    The gold-scheelite-quartz lodes of the Wakamarina valley were the most productive of the mesothermal gold-bearing areas in the Marlborough Schist. Most of the production came from the Empire City and

    Jan 1, 1995

  • IOM3
    Project financing and the mineral development agreement

    By D Macdougall, J Otto

    The financing of large mining projects in developing countries is often achieved, at least in part, by limited-recourse financing methods. Financing agreements are affected by the basic accord that is

    Aug 1, 1994

  • SME
    State Summaries ? Arizona

    By N. Niemuth

    Strong demand for copper in developing nations such as China and India, plus the additional demand for industrial minerals to supply the Arizona construction market, brought about a record-setting yea

    Jan 1, 2008

  • CIM
    How to use Energy Management to Improve Mining Operation Productivity and Reduce Downtime: Canadian Utility Company Incentive Programs

    By A. Tylczak, C. Norman, C. Shook, S. Loif

    "There are a lot of good reasons to manage energy use at mining operations. Optimizing process energy use reduces operating costs. Tracking energy use can help identify unplanned process changes or m

    Jan 1, 2015

  • AUSIMM
    Mining and Ore-Treatment at the Talisman Mine, Karangahake, NZ

    THE Talisman mine is situated on the Waitawheta (pronounced Wytaffetta) river just above its junction with the Chinemuri (pronounced Chinnemurre) river near Karangahake, NZ. The explored reef-bearing

    Jan 1, 1912

  • SME-ICGCM
    Recent Developments in Pre-driven Recovery Road Design

    By Rob Thomas

    Pre-driven recovery roads are used to speed up the longwall recovery process by reducing bolt-up requirements and by improving ground conditions on the face during the removal of the powered supports.

    Jan 1, 2008

  • NIOSH
    Mining Haul Truck Cab Noise: An Evaluation Of Three Acoustical Environments

    By S. B. Bealko

    Mining haul trucks comprise the majority of the equipment used in underground limestone mining operations and are known to emit high levels of noise. A previous study conducted by the National Instit

  • AUSIMM
    The Development of the Dudley Seam at Burwood Colliery

    A brief review is given of the history of the Colliery to date together with the reasons for the development of an additional seam.Investigations into the quality of the coal ami its suitability for t

    Jan 1, 1958

  • CIM
    Real Time On-Belt Elemental Analysis Using PGNAA for Mineral Processing Plant Control

    This paper discusses how elemental analysis of conveyed bulk flows in real time using PGNAA (Prompt Gamma Neutron Activation Analysis) technology has resulted in significant improvements in advancing

    Jan 1, 2014

  • ISEE
    Geotechnical Influences on Blast Induced Stress Wave Propagation, Copper Cliffs, Ontario

    By Roger S. Jackson

    "This study interprets vibrations produced by single underground shots, recorded on surface by 135 digital seismographs laid out in four linear arrays. Several vibration anomalies were observed and ar

    Jan 1, 2010

  • NIOSH
    IC 7683 Hydraulic Air Compressors ? Introduction

    By Leroy E. Schulze

    A review of development and a reevaluation of uses of the hydraulic air compressor are suggested by the constant changes in technology, which frequently make an old art valuable in solving current pro

    Jan 1, 1954

  • CIM
    Geology, 40Ar/39Ar geochronology and Sn-W-Mo-bearing sheeted veins of the Mount Douglas Granite, southwestern New Brunswick

    By M. J. McLeod, D. R. Lux, R. P. Taylor

    "The Mount Douglas Granite constitutes the eastern part of the Saint George Batholith and contains the youngest, most differentiated phases of the batholith. It also contains extensive endogranitic, l

    Jan 1, 1988

  • NIOSH
    IC 7082 Reconnaissance Of Placer-Mining Districts In Lemhi County, Idaho - Introduction

    By S. H. Lorain

    This paper briefly describes the principal commercial and near-commercial deposits of gold-bearing gravel and the important placer-mining operations in Lemhi County, Idaho. It is on of a series on wes

    Jan 1, 1939

  • SAIMM
    Capping and Kriging Grades with Long-Tailed Distributions

    By M. Maleki

    Variogram analysis and kriging lack robustness in the presence of outliers and data with long-tailed distributions, which often arises when estimating grades in precious metal deposits. The capping te

    Jan 1, 2014

  • IIMP
    Cobrepampa: magmatismo asociado y características metalogenéticas

    By Michael Valencia, Alonso Marchena, Fredy Arcos, Miguel Chumbe

    Cobrepampa es un depósito de cobre ubicado en Acarí (Caravelí-Arequipa). La mineralización se emplaza en pórfidos dioríticos pertenecientes al intrusivo Cobrepampa (Superunidad Linga) y está constitui

    May 22, 2019

  • CIM
    The Derrick Stack Sizer™: Revolutionary Advancements in Wet Screening Technology

    By Benjamin H. Clark

    "For over 50 years, Derrick Corporation has been renowned for its innovative and durable fine screening equipment and screen surface technology. Derrick’s latest innovation, the patented Stack Sizer,

    Jan 1, 2007

  • CIM
    World’s First Power Demand Stabilization System for A 3-Electrode Electric Arc Furnace for Shielded Arc Nickel Smelting

    By B. Lueger, D. Shen, M. Sedighy, R. Rand, R. Saleh, J. Cheung, M. Rifai, I. Khan, W. Sauri, D. Setianto

    The world’s first active power demand stabilization system for a 3-electrode electric arc smelting furnace was commissioned at PT Vale Indonesia in December 2012 on Furnace No. 2 using an SPLC (Smart

    Jan 1, 2014

  • AUSIMM
    Cost Model of the Leigh Creek Coalfield

    The Leigh Creek Coalfield is owned and operated by the Electricity Trust of South Australia to supply fuel to the Northern Power Station. To supply electricity at lowest cost, a costing and decision

    Jan 1, 1990