Search Documents

  • CIM
    Advanced Control for Column Flotation

    By G. A. Kosick, G. S. Dobby

    "This paper presents the principles and application of a recently developed control system for flotation columns and column circuits. The control system uses triple pressure sensors to directly sense

    Jan 1, 1990

  • SAIMM
    Techno-Economic Optimization Of Level And Raise Spacing In Bushveld Complex Platinum Reef Conventional Breast Mining

    By C. Musingwini

    The Bushveld Complex is economically significant and strategically important to South Africa, thus it is imperative that optimal extraction of platinum group metal (PGM) resources on the Bushveld Comp

    Jan 1, 2010

  • AUSIMM
    Three-Dimensional Modelling of Construction Tolerance in Trapezoidal Segments

    By R Bertuzzi

    This paper presents a three-dimensional analysis of a trapezoidal-shaped segmental tunnel lining for a recent tunnelling project in Sydney. Two- dimensional analyses, hand calculations and equipment s

    Jan 1, 2008

  • NIOSH
    IC 7610 Tunnel Construction By Peripheral Sawing At The Fort Randall Reservoir, Pickstown, S. Dak. - Introduction And Summary

    By Walter E. Lewis

    The Fort Randall Reservoir project, on the Missouri River at Pickstown, S. Dak., was designed by the Corps of Engineers and is part of the Missouri River Basin Development Program. The location of the

    Jan 1, 1951

  • CIM
    Commissioning of a Brownfield CDS Plant: Victories and Pitfalls (48th Annual Canadian Mineral Processors Operators Conference)

    By N. Romani, R. Provost

    "Commissioning of a circulating dry scrubber (CDS) plant was recently completed at an existing facility in Québec, Canada. The CDS plant treats the sulphur dioxide off-gas emitted from rotary kilns i

    Jan 1, 2016

  • AUSIMM
    Electrochemical Behaviour of Massive Chaclopyrite Bioleached Electrodes in Presence of Acidithiobacillus ferrooxidans and Acidithiobacillus caldus

    Electrochemical Behaviour of Massive Chaclopyrite Bioleached Electrodes in Presence of Acidithiobacillus ferrooxidans and Acidithiobacillus caldus In this work, the monitoring of bacterial and chemic

    Sep 13, 2010

  • AUSIMM
    Line and Plumb-Bob - A Review of Alluvial Mining at Five Mile Beach, Okarito, South Westland

    Although auriferous beach and fore-dune sands at Five Mile Beach south of Okarito township had been intensively mined by hand and primative mechanical methods drilling of the sandspit by the Gold Deve

    Jan 1, 1993

  • SME-ICGCM
    Improvements in Coal-Waste Disposal Since Buffalo Creek

    By Kelvin K. Wu

    A coal waste disposal dam failed on Buffalo Creek near Saunders, West Virginia, on February 26, 1972. This accident resulted in the loss of 125 lives, left over 4000 people homeless, and resulted in m

    Jan 1, 2006

  • NIOSH
    RI 8537 Wear Properties of Electrodeposited Titanium Diboride Coatings

    By D. R. Flinn

    A newly developed chemical conditioning technique, which greatly simplifies the preparation of plating baths for the electrodeposition of titanium diboride (TiB2) coatings, is described in this report

    Jan 1, 1981

  • SME
    Opencast Mining Of Brown Coal In Eastern Europe (53316393-306c-401a-9c67-5ad911520cfd)

    By Yoginder P. Chugh

    Most mines are large producing 0-25 mmt annually. The coal is mine.) at depths ranging from .0-150 m 120-500 ft mining at 300 m .(,1000 ft) depth is anticipated in the future. Single and multiple seam

    Jan 1, 1980

  • NIOSH
    RI 8289 Comparison of Five Types of Low-Energy Scrubbers for Dust Control

    By E. F. Divers

    This Bureau of Mines report describes the results of a program to develop small, rugged mechanical dust collectors (scrubbers) with high dust collection efficiency and low energy comsumption for contr

    Jan 1, 1978

  • SME
    Comparing Simulated And Interpreted Geologic Models

    By M. Rossi

    Geologic ore controls are usually interpreted and modeled from cross sections and plans, as they are critical to construct meaningful and accurate ore reserves models. The geologic boundaries are oft

    Jan 1, 2004

  • NIOSH
    OFR-57-82 Undercut And Fill System For Pitching Coal

    By Arnis Mangolds

    A study of the technical and economic feasibility of using a unique undercut and fill system developed by USBM engineers to mine steeply pitching coal is discussed. A brief resource assessment has ind

    Jan 1, 1981

  • SME
    Pre-Excavation Drilling and Grouting for Water Control and Ground Improvement in Highly Variable Ground Conditions at the Arrowhead Tunnels Project

    By Brian Fulcher

    The Arrowhead Tunnels Project represents the final portion of a 70 km (44-mile) long water conveyance facility that will bring up to 28 m3/sec (1,000 ft 3/sec) of water into Southern California. The 1

    Jan 1, 2008

  • NIOSH
    IC 8832 Automatic Fire Protection Systems For Surface Mining Equipment

    By William H. Pomroy

    Fire on surface mining equipment is a serious hazard to life and property. The Bureau of Mines, through a program of contract and in-house research, has developed and in-mine demonstrated reasonably p

    Jan 1, 1980

  • DFI
    What Has Been Learned About Drilled Shafts From The Osterberg Load Test - Summary

    By Jorj O. Osterberg

    The Osterberg (O-Cell) Method makes it possible to separate the side shear resistance (skin friction) from end bearing. The O-Cell is placed on or near the bottom of a drilled shaft and after the conc

    Jan 1, 1999

  • NIOSH
    RI 4462 Lime-Soda Sinter Process For Alumina From High-Silica Bauxites: Laboratory And Pilot-Plant Tests

    By John E. Conley

    The great demand for metallic aluminum for the prosecution of World War II caused the consumption of bauxite, the common ore of aluminum, to increase greatly. Prior to the war, the domestic deposits &

    Jan 1, 1949

  • ISEE
    Techniques for Assessing the Performance of Explosives and Initiating Devices

    By A R. Cameron

    "The number of commercial explosive products available to the mining industry has been steadilyincreasing and associated with this there has been an increase in the range of characteristics or propert

    Jan 1, 1994

  • IOM3
    Replacement mineralization styles and breccia dome formation at Dirtlow Rake fluorite-barite deposit, Castleton, England

    By C. A. Jeffrey

    The Dirtlow Rake vein deposit, which is up to 12 m thick, contains a range of paragenetically linked replacement mineralisation styles typical of many Mississippi Valley-type deposit environments. The

    Jun 19, 1905

  • IOM3
    Fracture behaviour of three Australian iron ores

    By B. M. England, M. V. Swain, N. Bristow, R. D. Dukino

    The toughness and fracture mechanisms of ores with significantly different microstructures from Yandi, Koolan and Mount Whaleback were studied with a view to understanding their degradation behaviour.

    Apr 1, 1995