The Red Dog VIP mill optimization project. Part B: An integrated approach to modelling and design of the flotation plant
By B. K. Gorain, A. W. Stradling
"The traditional metallurgical scale-up techniques for flotation plants are based on lumped flotation rate constants, dimensionless hydrodynamic numbers and the use of safety factors. Once the plant h
Jan 1, 2003
-
Mechanism of Slag and Matte Formation in Copper Flash Smelting
By Zhuo Chen, Jun Zhou, Jiemin Zhou
Samples of the reacting suspension particles were taken from the reaction shaft of a commercial flash furnace at different heights. The processes of matte and slag formation and morphology of the samp
Jan 1, 2019
-
The Operating Range Method for Backfill Hydraulics
By D. J. Hallbom
This paper presents a novel methodology for the hydraulic design of mine backfill distribution systems. The ?operating range? method uses the concepts of the hydraulic grade line and equivalent pipe l
May 1, 2007
-
Using 3D Computer Simulation to Improve Construction Project Planning
By Patrick Cloutier
Presentation objectives ? Introduce discrete-event 3D computer simulation as a tool to design, improve and optimize construction projects: ? Describe a real typical construction project planning i
Aug 1, 2013
-
Assessing Vertimill Ultrafine Grinding Performance: The Gibraltar Mine Case
By Keith Merriam, Jim McDonnell, Peter Radziszewski, Rob Rotzinger, Ian DeHart
"Taseko Mines Limited Gibraltar copper-molybdenum mine recommenced operation in 2004 with the initiation of a series of development projects to increase throughput capacity as well as modernize the mi
Jan 1, 2015
-
The Rabbit Lake Mill -Twenty Years of Milling
By Lam. E. K., J. W. Jarvi, B. P. Bharadwaj
"The Rabbit Lake Operation is located in Northern Saskatchewan on the western shore of Wollaston Lake approximately 800 km north of Saskatoon, Saskatchewan.The Operation is owned by a joint venture of
Jan 1, 1996
-
Evaluation of the Effect of Mixing Method, Sequence and Time on the Properties of Gelfill
By C. Doucet
Since 2001, CANMET Mining and Mineral Sciences Laboratories (MMSL) have worked with Falconbridge Ltd. (now Xstrata Nickel) to evaluate trends in the strength development and water retention properties
May 1, 2007
-
Assessing the Performance and Efficiency of Fine Grinding Technologies
By Jan E. Nesset, Colin Hardie, Peter Radziszewski, Donald P. Leroux
"The successful introduction of new high intensity stirred milling technologies (e.g. IsaMill, SMDetritor) to the mining industry in recent years prompted Noranda-Falconbridge to initiate a study comp
Jan 1, 2006
-
A Study of Cemented Crude Tailings Backfill Technology Based on Vertical Sand Silos
A key point in the manufacture of cemented backfill is the dewatering and settlement of the total tailings product. A new technology characterized by rapid non-mechanical settlement of total tailings
May 1, 2007
-
Energy Savings and Improved Recovery with Small Grinding Media
By Michel Brissette
"To recover more valuable ore and considering the complexity of minerals, the needs to grind finer is increasing. To reach the desired fine grinding targets, using the existing grinding media size, th
Jan 1, 2009
-
Mineralization and Metallurgy of the Samatosum Project
By P. J. Gron
"The Samatosum Project is a base and precious metal deposit located in south central British Columbia. A dilute ore reserve of 766, 682 tonnes grading an average 1.1% copper, 3.0% zinc, 1.4% lead, 833
Jan 1, 1990
-
Flowsheet Development for the Hypogene Geomet Unit in the Ivanplats Kamoa Copper Project
By S. R. Amos, N. O. Lotter, A. L. Hannaford, J. F. Oliveira, D. W. Broughton
"Ivanplats Ltd appointed Xstrata Process Support to perform the flowsheeting development work for their hypogene and supergene geomet units of the Kamoa Copper deposit, located in the Democratic Repub
Jan 1, 2013
-
A Generic Study of the Capital and Operating Costs for the Recovery of Precious Metals from Refractory Ore
"This generic study has been developed in response to the frequently asked question, ""That is the best treatment route for refractory gold ore?"". The study has developed operating and capital costs
Jan 1, 1989
-
Evaluating Multi Zone Ore Bodies of the Raglan Nickel Deposit using Current Planning Techniques Complemented by Real Option Pricing.
By Bruno Lemelin
Falconbridge Ltd Raglan Mine has been in production since 1998 and has produced annually some 900 000T of ore grading 3.1% nickel, 0.9% copper and 0.06% cobalt. The mine is located in Nunavik, Norther
May 1, 2004
-
Comminution Circuit Comparison Conventional versus Semi-Autogenous
By G. H. Babcock, D. A. Knight, V. G. Medina
"Production commenced at the Golden Sunlight Mine in 1983 and at Kidston Gold Mine in 1985. These projects were both constructed under the management of the Placer Dome Inc. (Technical Services) group
Jan 1, 1991
-
Lessons Learned from Measuring and Monitoring the Social License to Operate
By Ian Thomson
The Social License to Operate ? We are operating in an era where social license in the resource industry is as important ? if not more important ? than mineral potential ? Concept proposed by Plac
Aug 1, 2013
-
Calibration of Level Detection Systems in Flotation Columns Using a Conductivity Probe
By A. Uribe-Salas, J. A. Finch, B. J. Huls
Froth depth or interface level is an important control variable in column flotation which can influence both grade and recovery. A common method of locating the level is based on sensing the hydrostat
Jan 1, 1989
-
Framework for optimizing components in an oilwell cement slurry design
By D. Getzlaf
"Oilfield cementing has been utilized in the industry since the turn of the century. Originally, wells were shallow and criteria for well integrity were somewhat limited. Since that time, wells have s
Jan 1, 2004
-
Transforming Flow Sheet Design with Inert Grinding – the IsaMill
By K. E. Barnes
"The IsaMill was developed for fine-grained ores that required at least double the grinding efficiency of ball or tower milling to be economic. This was achieved, but in practice, the benefits of usin
Jan 1, 2006
-
Health and Safety in Mineral Exploration: The PDAC Role
By Bill Mercer
The Triggers for PDAC Involvement in H&S ??Increase in serious accidents in mineral exploration in past few years ??Increasing junior role in exploration ?? Impression that there were few H&S prot
May 1, 2008