Latest Fire Protection Innovations for Large-Scale Mining EquipmentBy Don A. Toth
Until recently, the fire protection systems used to protect mining equipment were based on generically designed, off the- shelf concepts. These systems were reliant on single agent approaches and were
Apr 1, 2005
-
Investigation of Liner Wear at Chadormalu Semi-autogenous Grinding MillsBy Mohammad Noaparast, Babak Fotoohi
"Due to certain advantages in (semi-)Autogenous-Ball mill circuits in most of the high-throughput ore grinding units of mineral processing plants, much attention is paid to optimize the mill performan
Jan 1, 2005
-
Optimization of the Damang Mine (f1135579-fc96-4b0b-98ae-1df94fee7413)By Dayang Datu Khalil, Charle Amoah, Fred Kock
Abosso Goldfields Limited has been optimizing the comminution circuit at the Damang Mine Operation for the treatment of 100% primary ore. The optimization process started at a base rate of 343 tph whe
Jan 1, 2012
-
The Niobec MillBy Michel Robert
"In 1974, Copperfields Mining Corporation and Soquem formed a new company, Niobec Inc, to bring the niobium deposit of the St-Honore carbonatite into production.St-Honore is located in the Saguenay ar
Jan 1, 1978
-
A Geometallurgical Approach to Flotation Process Design Using Optimised Grade-Recovery CurvesBy D. Hatfield
"Flotation plants typically aim to maximise recovery at or above a target grade. As the ore from the mine varies, operators increase or decrease the mass pull in different flotation banks by adjusting
Jan 1, 2013
-
Energy Conservation at Falconbridge Nickel Mines LimitedBy D. M. Doyle
"In this paper I will summarized the Falconbridge Nickel Mines1) energy costs and consumption data by fuel, process, cost centre and estimate our future costs and consumption patterns 2) detail the di
Jan 1, 1978
-
Treatment of and Gold Recovery from Effluent at Giant Yellowknife Mines LimitedBy G. Halverson, K. Blower
"Giant Yellowknife Mines Limited (Giant) has been producing gold since 1948. Located at Yellowknife, Northwest Territories, Canada, see Figure 1, the mine processes approximately 1,200 short tons per
Jan 1, 1987
-
Hydraulic Calculation of Gravity Transportation pipeline System of Cemented Coal Gangue Backfilling in Suncun Coal Mine, ChinaBy Q. Zhang
The necessary capability of the gravity transportation pipeline system for cemented coal gangue backfilling at the Suncun Coal Mine, China, is about 74.4 m3?h-1 according to mining production and work
May 1, 2007
-
Pipe Ore Processing Developments in the Thompson MillBy P. G. Claridge, R. A. Tenbergen
"Pipe Open Pit ore is delivered by rail to the Thompson Mill at a rate of 34,000 tons per week. Ore is milled at a rate of 220 tons per hour.Characteristics of the serpentinised peridotite host rock a
Jan 1, 1975
-
Cyanide Recovery and Copper Removal from Gold Plant Effluents using Vitrokele™ - Pilot Plant ResultsBy D. Kidby, A. Briggs
"Vitrokele ™ is a synthetic adsorbent, using chelating groups on large polystyrene beads, developed in Canada over 7 years ago, and first commercialised in 1985 to recover noxious metals from plating
Jan 1, 1992
-
The Kumtor Gold Mill Start Up and Start up ChallengesBy John Kazakoff, Andrew Mortimore
"Production at the remote Kumtor Gold Mine in Kyrgyzstan commenced on schedule in December 1996.The ore mined during the first few months of 1997 from the upper benches of the pit did not produce the
Jan 1, 1999
-
Reducing Selectivity in Narrow-Vein Mining through the Integration of Underground Pre-concentrationBy Andrew Bamber
The introduction of pre-concentration technology into the underground narrow-vein mining scenario has the potential to change the entire economics of utilizing bulk-mining methods in these situations.
Oct 1, 2004
-
Cluff Lake Mill - Phase 2 ExpansionBy H. A. Schnell
"The Phase I Mill at Cluff Lake in northern Saskatchewan was designed to accommodate a very specific high grade uranium ore. As this high grade ore was depleted, construction was undertaken on a new m
Jan 1, 1985
-
Modelling Secondary Crushing Plants for Teaching Purposes and Operator TrainingBy J. A. Meech, R. J. Tucker
"A dynamic computer model has been developed to simulate the operation of ore crushing plants. The model was created in a general form to allow imitation of a wide variety of secondary crushing circui
Jan 1, 1985
-
Pressure Acid Leaching of Non-Ferrous Smelter Slags for the Recovery of Their Base Metal ValuesBy W. Curlook, V. G. Papangelakis, M. Baghalha
A pressure acid leaching process has been developed for the extraction of metal values, nickel, copper, cobalt and zinc, from base metal smelter slags. The basic concept contemplates cooling the smelt
Jan 1, 2004
-
Condition Monitoring and Basic Maintenance?. One Without the Other?? Founded In 1953 ? Mining growth of 83% since 2007 ? We produced over 1 million ounces of Au in 2012 ? We Forecast of 20% Au production in 2013-2015 ? We have paid a dividend 31 years consecuti
Aug 1, 2013
-
Circuit Consolidation at Pine Point Mines Limited Pine Point, N.W.T.By R. E. Jones
"INTRODUCTIONCominco Limited, one of the free world's largest producers of lead and zinc having majority ownership in Pine Point Mines Ltd., operates a mining and concentrating complex on the south sh
Jan 1, 1982
-
High Pressure Direct Injection of Natural Gas in a Diesel Engine for High Performance/Low EmissionsBy K. Bruce Hodgins
The North American mining industry faces challenging emissions regulations in coming years with the introduction of new standards for off-road diesel engines. In order to remain competitive, industry
May 1, 2002
-
Goldcorp Inc., Red Lake Mine Design and CommissioningBy R. Tyreman, G. Ritson
"The Red Lake Mine is situated in Balmer Township, Red Lake area in northwestern Ontario. It is an underground mine that has been in production since 1948. The property was originally known as the Dic
Jan 1, 2001
-
Converting the Key Lake Mill Process for McArthur River Ore"The Key Lake mill was commissioned in 1983 to process the two Key Lake ore deposits. With the depletion of these ore bodies in 1999, the plant was converted to mill the exceptionally rich McArthur Ri
Jan 1, 2001