    CSM Cutter Soil Mixing - A New Technique For The Construction Of Subterranean Walls Initial Experiences Gained On Completed Projects

    By E. Stoetzer

    In all known deep mixing processes the existing soil is mixed with self hardening slurry by mixing tools that rotate about a vertical axis (augers, mixing paddles). Wall panels are constructed using s

    Jan 1, 2006

  • DFI
    Technical Note - Hollow Threaded Rebar For Cross Hole Sonic Logging Access Tubes Combined With Longitudinal Concrete Reinforcing In Drilled Shafts

    By Josef K. Alter

    Crosshole Sonic Logging (CSL) of drilled shafts requires 1.5-in (38-mm) or 2-in (51-mm) I.D. sonic access tubes to be installed inside the steel reinforcement cage. The sonic access tubes do not contr

    Jan 1, 2011

  • DFI
    Innovative Cofferdams Used On The I-205 Columbia River Bridge

    By Robert Bittner

    The following is a report on the development of two unique and separate cofferdam systems used in the construction of the marine foundations for the I-205 Columbia River Bridge at Portland, Oregon for

    Jan 1, 2013

  • DFI
    Piled Foundation Design as Reflected In Codes and Standards

    By Bengt H. Fellenius

    "ABSTRACTAn example from a guidelines document for the Eurocode is discussed that addresses design for geotechnical strength of piled foundations in settling soil, generating drag force and downdrag.

    Jan 1, 2014

  • DFI
    Ultimate Shaft Friction, Displacement Response and Set-Up for Axially Loaded Piles in Clay

    By Kjell Karlsrud

    "Abstract New semi-empirical design procedures for the determination of ultimate shaft friction and load-displacement response of axially loaded piles in clay are proposed. Hereunder also prediction o

    Jan 1, 2014

  • DFI
    Vibwall Installation - Cardiff Bay Barrage ? Synopsis

    By Graeme McWhirter

    This paper discusses the Installation of a Vibwall for the Cardiff Bay Barrage Project Wales, UK, by Kvaerner Cementation Foundations. Only the second use of the technique in the UK the wall was succe

    Jan 1, 2000

  • DFI
    Press-In Piling Technology For Sustainable Construction

    By Philip Dubbeling

    Conventional dynamic sheetpiling techniques are ill-suited to urban development because of the emission of excessive noise and ground vibrations. Drilled shafts and slurry walls alleviate some of thes

    Jan 1, 2006

  • DFI
    Construction Considerations For Ground Modification Projects ? Synopsis

    By J. P. Welsh

    Ground Modification construction is rapidly evolving in the United States. An assessment of the construction status of Ground Modification methods with their dates of introduction and general acceptan

    Jan 1, 2010

  • DFI
    Resonant Driving of Sheet Piles: High Production Sheet Pile Driving With Zero Ground Vibration

    By Mathew Janes

    "Sheet piles remain an economic solution to many shoring problems. However, installation of sheet piling suffers high noise and vibration with conventional impact or vibratory methods or low productio

    Jan 1, 2014

  • DFI
    Case Study: MGM Casinonational Harbor, Washington, DC Displacement Cast-In-Place Piles in Coastal Plain Soils

    By Karl A. H iggins, James P. Racine

    "Displacement Cast-in-Place (DCIP) piles are not a common deep foundation type in the Washington, DC Metro Area market. As a result, less regional data is available for these foundations compared to o

    Jan 1, 2017

  • DFI
    The Utilization Of Static-Load Piledriving Near Structures That Are Sensitive To Vibration - Static-Load Piledriving: - Concept;

    By Robert A. Field

    Static-Load Piledriving utilizes a hydraulic push to facilitate the installation of a pile. The pile is not rotated, impacted or vibrated. A smooth pushing force advances the pile incrementally into t

    Jan 1, 1997

  • DFI
    Problems Encountered For Deep Caissons For The Second Bassein Creek Bridge At Mumbai, India

    By Deepak B. Deshpande

    This paper enumerates various difficulties encountered in the design and construction of deep caisson foundations for the Second Bassein Creek Bridge constructed over a creek with very difficult site

    Jan 1, 2002

  • DFI
    Installation And Performance Characteristics Of High Capacity Helical Piles In Cohesive Soils

    By Mohammed Sakr

    This paper presents the results of a full-scale axial compression and tension (uplift) testing program executed on large-capacity helical piles installed in very stiff to very hard clay till soils (i.

    Jan 1, 2012

  • DFI
    Construction And Instrumentation Of A Deep Foundation ? Synopsis

    By Y. K. Wong

    This paper describes in detail various problems concerning the construction of a pile-raft foundation supporting a 42-storey tower block. The subsurface generally consists of highly weathered sediment

    Jan 1, 2010

  • DFI
    Urban Legends: Two Case Studies That Redefine "Impossible"

    By Grant R. J. Bearss

    Due to environmental concerns in urban construction, many typically simple projects become very complex or feasibly impossible. The introduction of relatively new concepts has redefined "impossible",

    Jan 1, 2002

  • DFI
    Untangling The Octopus" Bored-In Pile Construction - On Nysdot Project D256424 Ithaca, New York - Executive Summary - Bored-In Pile Construction

    By Andrew L. Peterson

    CATOH Inc. of Weedsport, New York recently completed a very challenging Bored-In Pile project which features unique construction techniques in the installation and load testing of 45 and 100 ton capac

    Jan 1, 1997

  • DFI
    Creative Shoring Solutions For A Tight Urban Site

    By David G. Winter

    The Olive 8 excavation site in Seattle was surrounded on three sides by conditions requiring innovation, careful modeling, and extensive instrumentation to support use of a first-of-its-kind shoring s

    Jan 1, 2009

  • DFI
    Unbraced Circular Cofferdam For Vent Building No. 6 At The South Bulkhead - Introduction

    By Philip Bonanno

    The first major project in Boston's new access to Logan Airport was an Immersed Tube Tunnel which extended 3,600 ft. from South Boston to East Boston across Boston Harbor. Twelve tube sections, 3

    Jan 1, 1994

  • DFI
    Drilled Shaft Difficulties and a Micropile Solution

    By Jeff Jackson, Paul Axtell, David Graham

    The Montana Department of Transportation recently awarded a contract to construct a replacement bridge across the Clark Fork River in Heron, MT. Both abutments and both intermediate bridge bents were

    Jan 1, 2018

  • DFI
    Deep Soil Mixed Wall And Jet Grouting For An Excavation Support System At The Museum Of Fine Arts In Boston, Massachusetts

    By Harry Schnabel

    A 6200 m² cement deep soil mixed (CDSM) wall was constructed for an addition to the Museum of Fine Arts in Boston, Massachusetts. The addition was located along the east side of the existing museum wi

    Jan 1, 2011