Caisson Design And Construction Challenges On The New Tiger Stadium Project - Summary
By Fritz J. Klingler
From site demolition, to design, to construction, Detroit's new Tiger Stadium project is required to be completed within a short 2 ½ years from award of the design-build contract. Such extreme sc
Jan 1, 1999
-
Plastoelastic Analysis Of Bearing Capacity For Soil Anchor
By Hui Yongning
This paper presents a simulating test of constitutive relation of soil anchor in laboratory and puts forward a new plastoelastic mechanical model, on which a new calculating formula of elastic and pla
Jan 1, 1991
-
South 196th/200th Street Corridor And Bridge Crossing, Kent, Washington
By James Su
The Green River Valley in Kent, Washington, is a fast growing area containing retail facilities, warehouse factories and industrial businesses, including the Boeing Space Center. Traffic from Intersta
Jan 1, 1998
-
Excavation Construction for the Transbay Transit Center
By Nick O’Riordan, Kaitlyn L. Fleming, Michael Riemer, Youssef M. A. Hashash, Stephen McLandrich, Mohamad Jammoul, Pierre Gouvin, Andrew Yeskoo
"To accommodate urbanization, cities are developing more underground space as a means to house public transportation systems and other entities. Underground developments often require construction of
Jan 1, 2015
-
Excerpts From Drilled Shafts: Construction Procedures And Design Methods - General Approach
By L. C. Reese
? Good construction and inspection presumed. ? Capacity-computation factors are independent of construction method. ? To account for variable or uncertain site conditions, anticipated construc
Jan 1, 1988
-
Effect Analysis On Static And Dynamic Tests Of Pile Foundations
By Hou Shitao
With the development of Wuhan's city planning in China, new buildings of moderate and high store have been increasing day by day. Precast concrete piles or cast-in-site piles were used in the maj
Jan 1, 1991
-
Case History: Estimating Ground Vibrations Caused By Pile Driving
By Tracy Brettmann
A new method for estimating ground vibrations caused by pile driving was developed as a result of a vibration monitoring program performed for a large pile driving project. The method is accurate, rat
Jan 1, 1999
-
Overview Of Earth Retaining Systems And Their Selection
By Raymond J. Castelli
The paper provides a general overview of the numerous types of earth retaining systems currently available, and organizes these various systems by several classification methods. These classifications
Jan 1, 2003
-
Mini-Pile Design and Construction Methods Change to Mitigate Soil Loss through Glacial Till (db8ff9fc-ef1a-44d4-9e2e-ad6c00fcf7e5)
By Cassandra A. Wetzel
"Rock socketed mini-piles are a desirable foundation alternative when design capacity is more than 40 tons and there is limited access. In this case history mini-piles were designed to support between
Jan 1, 2017
-
Automated Installation Monitoring For Augercast And Driven Piles
By Garland Likins
Where soil conditions are favorable, augercast piles have significant economic advantages, but they also have some uncertainty due to the in construction methods. To confirm structural integrity, stat
Jan 1, 1999
-
Anchored Excavation Support Using SMW (Soil Mixed Wall)
By Seth L. Pearlman
A major excavation support case history for the Eastern approach to the Third Harbor Tunnel (THT) in Boston, MA is described, which uses an anchored Soil Mixed Wall (SMW). Both general and project spe
Jan 1, 1993
-
Bearing Capacity Of Long Piles Driven Into Soft Soil ? Synopsis
By F. Z. Suo
Baoahan Iron and Steel Complex is situated at lower beaches of the Yangtze River. The subsoils 50~70 M below the surface is a deposite of Yangtze River delta, consisting mainly of weak silty clay and
Jan 1, 2010
-
Use Of And Design Parameters For High Capacity Foundation Elements In Boston Bedrock - Introduction
By Mark X. Haley
Foundation design and construction in Boston has changed dramatically during the past 10 years. Prior to 1985, the primary foundation element in Boston, where deep foundations are required, was driven
Jan 1, 1994
-
Ultimate Uplift Capacity Of Single And Group Piles In Clay ? Synopsis
By B. M. Das
Several laboratory model test results for the determination of the ultimate uplift capacity of single and group metal piles embedded in near-saturated clay have been presented. Based on the uplift tes
Jan 1, 2010
-
Excavation Support At Historic Buildings In An Urban Environment - A Case Study
By Tony Mazzo
It has often been said by consulting engineers that foundation contractors are in the business of taking risks. One would agree that the mere fact a foundation project can be budgeted, planned, engine
Jan 1, 2003
-
Tied-Back Offset Tangent Caisson Retaining Wall For The North Bulkhead Third Harbor Tunnel Project Boston, Massachusetts ? Introduction
By Daniel L. Hanson
This paper presents a case history of the design, installation and performance of a tied-back tangent caisson retaining wall which was constructed as part of the Third Harbor Tunnel project currently
Jan 1, 1994
-
Permanent Displacement And Pile Driving Vibrations - Summary
By Charles H. Dowding
Whenever piling vibrations are significant, construction activities associated with pile driving and/or excavation can produce permanent displacement. These permanent displacements are more detrimenta
Jan 1, 1991
-
Measurement And Analysis On The Bearing Behaviour And Driving Effects Of Piles In Shanghai Region
By Gao Dazhao
This paper presents some research results of pile foundation performance. Measurements on the bearing behaviour and driving effects of piles have been carried out during pile testing and pile driving.
Jan 1, 1991
-
Static And High Strain Dynamic Test Co-Relation Studies On Cast-In-Situ Concrete Bored Piles - Synopsis
By N. V. Nayak
Maharashtra State Road Development Corporation Ltd., has initiated a scheme for construction of 55 flyovers in Mumbai in India. To ensure speedier completion of projects several new technologies were
Jan 1, 2000
-
Automated Instrumentation For ACIP And Drilled Displacement Piles - 1. Introduction
By John Lemke
Current practice for monitoring static pile load tests commonly consists of measuring load and displacement at the top of a pile. This is typically accomplished by monitoring dial gauge movements, lin
Jan 1, 2002