    Maintenance Contract on Cat 785 Trucks Works Well at Round Mountain

    By J. B. Rasmussen

    As part of a purchase of a fleet of Caterpillar 785 trucks, Round Mountain Gold Corp., Cashman Equipment Co. and Caterpillar Inc. entered into a four-year contract for the major maintenance of the fle

    Jan 1, 1991

  • SME
    Vari-Stem Blasthole Plugs Improve Blasting Patterns

    In September 2003, a test was conducted to see if a115-mm- (4.5-in.-) diam Mocap Vari-Stem blasthole plug could improve the pattern of explosives using different top stemming material. The test too

    Jan 1, 2004

  • SME
    Sustainable Mineral Development: Possibilities and Pitfalls illustrated by the Rise and Fall of Dutch Mineral Planning Guidance

    By M. J. van der Meulen

    "The Netherlands has major resources of sand, gravel and clay, exploited mainly for construction works and the building materials industry. As in most western countries, mineral extraction meets with

    Jan 1, 2005

  • SME
    Longwall Mining, Shale Gas Production, and Underground Miner Safety and Health

    This paper presents the results of a unique study conducted by the National Institute for Occupational Safety and Health (NIOSH) from 2016 to 2019 to evaluate the effects of longwall-induced subsurfac

    Jan 7, 2020

  • SME
    Maximizing Efficiencies In Thickeners - Automatic Flocculant Dosing Control For Mining Thickeners And Clarifiers

    By J. Evans

    Including: Tailings thickeners, CCD?s, paste thickeners, HI-rate thickeners, lamella thickeners, high compression thickeners, clarifiers etc. Flocculant dosing control for mining thickeners and clarif

    Jan 1, 2011

  • SME
    A Structural Interpretation Of The Garlock Fault Zone At The Tehachapi Crossing

    By Chester M. F. Peters

    The opportunity to make a close study of the available geologic data existing along the line of the California Aqueduct crossing of the Garlock fault in the Tehachapi Mountains was brought about first

    Jan 1, 1997

  • SME
    Applicable Analytical Tools For A Seismic Design Of Underground Excavations

    By Christopher M. St. John, Tony F. Zahrah

    Empirical and numerical methods are the two extremes of the tools available for the seismic design of subsurface excavations and underground structures. Both have their limitations: when relying on pu

    Jan 1, 1985

  • SME
    Pogo Mine Control System: A Hybrid of DCS and PLC

    The Pogo Mine, near Delta Junction, Alaska is a new 2500 STPD gold operation. The control system of the mine and milling operations are a hybrid of DCS (Distributed Control System) control and PLC (Pr

    Jan 1, 2008

  • SME
    Sinking A Freeze Shaft With Installation Of A Water-Tight, Flexible Lining

    By Klaus Stoss, Bernd Braun

    The sinking and lining of a large mine shaft with 8.0 m i.d. and 1,133 m total depth is described in detail. The ground freezing method was applied to safely sink the shaft through unstable, waterbear

    Jan 1, 1983

  • SME
    Phosphogypsum Uses

    By P. R. Clifford

    Phosphogypsum is a byproduct of the manufacture phosphoric acid. There are approximately one billion tons of phosphogypsum stored in stacks in northern and central Florida. The Florida Institute of

    Jan 1, 2002

  • SME
    Cryogenic Air Supply for Cooling Built-in-Place Refuge Alternatives in Hot Mine Mining, Metallurgy and Exploration - Springer

    By Miguel Reyes, Bruce Whisner, Joseph Bickson, Lincan Yan, David Yantek, Justin Srednicki, Nicholas Damiano, Eric Bauer

    Built-in-place (BIP) refuge alternatives (RAs) are designed to provide a secure space for miners who cannot escape during a mine emergency. Heat and humidity buildup within RAs may expose miners to ph

  • SME
    Cryogenic Air Supply for Cooling Built-in-Place Refuge Alternatives in Hot Mine Mining, Metallurgy and Exploration

    By Miguel Reyes, Bruce Whisner, Joseph Bickson, Lincan Yan, David Yantek, Justin Srednicki, Nicholas Damiano, Eric Bauer

    Built-in-place (BIP) refuge alternatives (RAs) are designed to provide a secure space for miners who cannot escape during a mine emergency. Heat and humidity buildup within RAs may expose miners to ph

  • SME
    Challenges and Opportunity in Modelling and Simulation of Mineral Processing Systems

    By K. V. S. Sastry, K. D. Lofftus

    Mathematical modeling and computer simulation are two valuable quantitative tools that are being effectively applied to mineral process- systems. This paper presents an up-to-date assessment of proces

    Jan 1, 1989

  • SME
    Breakthrough Outage at the Second Manapouri Tailrace Tunnel Project, New Zealand

    By Charlie Watts, Ken Smales, Ron Fleming

    The Manapouri Power Station is an underground hydro-electric station located in the South Island of New Zealand, and was constructed in the 1960s. Between 1997and 2002, a second 10m diameter tailrace

    Jan 1, 2007

  • SME
    Alignment Of Short-Term And Operational Plans Using Discrete Event Simulation

    The fundamental objective of mine plans are usually to maximize the mine profit by extracting ore at the lowest possible cost over the mine life while some technical constraints are satisfied. Since t

    Jan 1, 2012

  • SME
    Stainless Steel For Hydrometallurgy Plants

    By J. Olsson

    Introduction Stainless steel has by tradition been a common construction material for hydrometallurgy processes and the most common grades can be found amongst the ASTM 300-series, i.e. austenitic gr

    Jan 1, 2007

  • SME
    Ventilation and atmosphere control inside a 3-bar compressed air TBM heading

    By B. R. Zernich

    Advances in tunneling technology, such as Earth Pressure Balance and Slurry Shield methods, have allowed the tunneling industry to construct tunnels in increasingly difficult ground conditions. In rec

    Jan 1, 2009

  • SME
    The Madrid Renewal Inner Ring Calle 30 with the Largest EPB Machines—Planning and Results

    By Enrique Fernandez

    M-30, Madrid’s inner ring, covers 42 sq km of the city centre where one million people reside. It was constructed in several phases during the sixties and the eighties. The design criteria applied to

    Jan 1, 2007

  • SME
    Kárahnjúkar Hydroelectric Project, Iceland Extreme Underground Construction

    By Bernhard Leist, William D. Leech, Johann Kröyer, Holger Evers

    Landsvirkjun—the national electric power company of Iceland—is building the Kárahnjúkar Hydroelectric Project in eastern Iceland. Two glacial river systems will be dammed and channeled through a serie

    Jan 1, 2007

  • SME
    Government Minerals Policy Assailed at AMC Conference

    "Lax, misguided, and dangerous" is Rep. James Santini's description of the official US position on strategic nonfuel minerals. Santini (D-NV), chairman of the House Mines and Mining Subcommittee,

    Jan 11, 1980