Search Documents

Sort by

  • AUSIMM
    Cadmuim-Base Bearing Metals

    In considering the preparation of any paper concerning bearing metals, one feels a certain amount of diffidence in venturing into a field which has been capably explored at great length and in great d

    Jan 1, 1934

  • SAIMM
    CaF2 solubility in NaC1-KC1 salt flux for aluminium recycling

    By E. Milke, A. Arnold, B. Friedrich, A. Sydykov

    CaF2is often used as a fluoride addition to the chloride salt flux in the melting of aluminium scrap. The solubility of CaF2in the chloride salt system is limited. Dissolved CaF2is considered to impro

    Jan 1, 2004

  • DFI
    Caisson Design And Construction Challenges On The New Tiger Stadium Project - Summary

    By Fritz J. Klingler

    From site demolition, to design, to construction, Detroit's new Tiger Stadium project is required to be completed within a short 2 ½ years from award of the design-build contract. Such extreme sc

    Jan 1, 1999

  • DFI
    Caisson Design And Construction, Upstream Guide Wall, Locks And Dam No. 26

    By E. C. Demsky

    This paper describes the large diameter caisson foundation for the upstream guidewall at the Lock and Dam No. 26 (Replacement) Project. The guidewall is supported on two rows of 1.8-m diameter concret

    Jan 1, 1989

  • DFI
    Caisson Foundation For High Speed Paper Machine ? 1 ? Introduction

    By Anthony H. Tawil

    Modern, high-speed machines used in the manufacture of paper require foundations with stringent settlement constraints. To fulfill this requirement, caisson piles, extending into bedrock, were selecte

    Jan 1, 1987

  • AUSIMM
    Calcining Aluminum Trihydrate in a Circulating Fluid Bed, A new Technique

    Increasing demands on quality of metallurgical grade alumina and for lower production costs led to the development of a new fluid bed calcining process. The process, jointly developed in Germany by Ve

    Jan 1, 1972

  • SME
    Calcium Activated Stablization And Costruction Of Road With Fly Ash

    By S. Mishra, C. Shon, D. Saylak

    Only 40% of fly ash generated by the power plants in US are recycled and used for commercial applications. Of these, the high lime, Class C ash had been preferred. Systematic laboratory and field-scal

    Jan 1, 2007

  • SME-ICGCM
    Calcium Aluminate Kiders in Hard Rock and Coal Mining

    By Bernard Woolley

    The history of the use of calcium aluminates in mining is discussed including a review of very rapid hardening concretes, anchoring using cement capsules and pumped ground control systems. Specific re

    Jan 1, 1997

  • SAIMM
    Calcium and magnesium rejection from sulphate solutions in lateritic nickel solvent extraction using Versatic 10 acid-LIX®84-IC system - Synopsis

    By B. Ndlovu

    The world mineral industry has over the years experienced growth in the production of nickel (Ni) due to its use not only in the catalytic industry but mainly also to its demand in the stainless steel

    Jan 1, 2008

  • SME
    Calcium Ion Activation Of Silica Surfaces With Sodium Oleate Collector

    By Y. I. Rabinovich, S. C. Brown

    In the Florida phosphate industry, fatty acid collectors are used to separate phosphate ore from silica during the rougher flotation stage. However, the presence of multivalent ions (in particular Ca+

    Jan 1, 2004

  • ISEE
    Calculating Blasting Effects to Nearby Underground Pipelines

    By Janice K. Means

    The purpose of this paper is to provide the seminar attendee with: information on pipeline construction, operation and standards to better equip him (or her) to analyze the ultimate effect of blasting

    Jan 1, 1992

  • SAIMM
    Calculation models on the viscosity of the CaO-SiO2-TiO2slag system

    By J. -Y. Jia, G. -B. Qiu, C. -G. Bai, D. -F. Chen

    Due to the great importance of the smelting process, it is essential to establish a calculation model on the viscosity of the slag system containing titania. In this paper, the calculation models of m

    Jan 1, 2004

  • SAIMM
    Calculation Of FeO-TiO2-Ti2O3 Liquidus Isotherms Pertaining To High Titania Slags

    By D. J. Fourie

    During the production of pure TiO2for the pigment industry, ilmenite, containing 35?60% TiO2, is reduced to high titania slag, containing 70?95% ?TiO2? and pig iron. The high titania slag produced, co

    Jan 1, 2005

  • AUSIMM
    Calculation of Metal, Coke and Gas Temperature Distributions in the Cupola Furnace

    Calculations of the temperatures of metal, coke, and gas at any level in the cupola furn~ce can be carried out by means of heat balances, using data obtained from experiments with an 18 in. experiment

    Jan 1, 1963

  • AIME
    Calculation Of The Depth Of A Magnetic Deposit

    By Janshi Sen

    VERTICAL-INTENSITY magnetometers, such as the Hotchkiss Superdip and the Askania vertical field balance, are now [ ] widely used, because vertical-intensity charts give definite information for the

    Jan 1, 1944

  • SAIMM
    Calculations of grade and tonnage for two co-products from a projected South African gold mine

    By E. J. Magri

    Consideration is given to the problem of the estimation, from limited data, of the likely grade and tonnage for a new mining property that is to be exploited by the selective mining of two metals that

    Jan 1, 1982

  • SME
    Caldecott Improvement Project

    By William W. Edgerton

    The California Department of Transportation (Caltrans), the Contra Costa Transportation Authority (CCTA), and the Alameda County Congestion Management Agency (Alameda CMA) are involved in a unique par

    Jan 1, 2008

  • AUSIMM
    Calibrated Geotechnical Measurement to Provide a Quantitative Understanding of Rock Mass Conditions at the Tasmania Gold Mine, Beaconsfield, Tasmania

    Judicious placement of a range of geotechnical instruments was employed at the Tasmania gold mine, Beaconsfield, Tasmania, as a key strategy in the monitoring of rock mass conditions over the past fou

    Nov 25, 2010

  • SME
    Calibrating Numerical Model For Room-And-Pillar Coal Mining Simulation In Weak Immediate Roof Based On In-Situ Tests

    By Andre C. Zingano

    It is a very difficult task to estimate the immediate roof and support behavior in a room-and-pillar mining section in the initial phase of the mining project. There is little information available at

    Jan 1, 2009

  • SME-ICGCM
    Calibrating the Lamodel Program for Site Specific Conditions

    By Keith A. Heasley

    The LaModel program has been used successfully in the United States for many years to design pillars to ensure global stability of pillar recovery operations. However, the recent Crandall Canyon Mine

    Jan 1, 2012