Search Documents

Sort by

  • CIM
    Structural equation modelling of leaching of oxidized copper-cobalt ore in a hydrochloric acid solution

    By M. B. Kime

    "A set of experimental batch leaching tests studied the effect of pH, time, temperature, and stirring speed on the relative Cu, Co, Ni, and Fe leaching yields of an oxidized copper-cobalt ore sample i

    Jan 1, 2017

  • DFI
    Evaluation of Engineering Properties of Expansive Soils Mixed with Waste EPS Beads

    By B. Soundara, A. Suganya, S. Selvakumar

    "Expansive soils have a potential for shrinkage or swelling under changing moisture content. Attempts were made to reduce the swelling potential of expansive soils with conventional additives such as

    Jan 1, 2017

  • CIM
    Flowsheet development, commissioning, and start-up of the Voisey’s Bay mill

    By P. Langlois, G. Labonté, J. J. Barrett, J. Holmes

    "The Voisey’s Bay mill processes a high-grade pentlandite and chalcopyrite ore in a largely pyrrhotite/troilite matrix. From 1994 to 1997, circuit development focused on making a 14% nickel concentrat

    Jan 1, 2017

  • CIM
    Processing Plant Expansion at Kittila Mine Affords Opportunity for Significant Material Handling Improvement

    By T. Holmes, J. Middlemiss

    "Agnico-Eagle (AE) has been operating their Kittila Mine in Northern Finland since 2008. The mine has experienced considerable ore flow problems with ratholing, bridging and freezing in their mill fee

    Jan 1, 2017

  • DFI
    A Case History of Intrinsic Remediation of Reactive Tailings Seepage for Questa Mine, New Mexico

    By SungJe Chi

    Intrinsic remediation is the effect of natural attenuation mechanisms - dilution, dispersion, sorption/precipitation and biodegradation - reducing contaminant concentrations in ground water to specifi

    Jan 1, 2017

  • ISEE
    xP-frag, a Distribution-free Model to Predict Blast Fragmentation

    By Finn Ouchterlony, José A. Sanchidrián

    "A model for fragmentation in bench blasting that originates from dimensional analysis of fragmentation in asteroid collisions is presented. Percentiles of the size distribution are obtained in the ba

    Jan 1, 2017

  • CIM
    Copper prestrip to copper cyanide

    By S. N. Dixon

    "Maximizing the value of each tonne of processed ore is the goal for all operations. Cyanidation processing of gold-copper ores has been challenging since its first use in 1889. The current practice t

    Jan 1, 2017

  • DFI
    Contribution of Inner Frictional Resistance to Bearing Capacity of Open-Ended Piles

    By Janaka J. Kumara, Takashi Kurashina, Yoshiaki Kikuchi, Takahiro Yajima

    "The inner frictional resistance of open-ended piles depend heavily on the degree of soil plugging. Many factors including pile diameter, relative density and end conditions of the piles influence the

    Jan 1, 2017

  • SAIMM
    Flotation of Mercury from the Tailings of the Agh-Darreh Gold Processing Plant, Iran

    By M. R. Khalesi, Y. Kianinia, A. Seyedhakimi, F. Soltani

    "The feed ore to Agh-Darreh gold processing plant (Takab City, Iran) contains 2 ppm Au, 7 ppm Ag, and 120 ppm Hg. After cyanide leaching of the feed at pH 10.4, 80% of the total mercury (in the form o

    Jan 1, 2017

  • CIM
    Use of Functional Performance Models to Increase Plant Grinding Efficiency

    By O. M. Arafat, J. A. Finch

    "The Functional Performance Equation calculated from a plant grinding survey defines two distinct ball mill circuit efficiencies and how they relate to total production rate through the target grind s

    Jan 1, 2017

  • DFI
    Deep and Shallow Soil Mixing for the SR-83/US-331 Choctawhatchee Bay Bridge Project in Santa Rosa Beach, Florida

    By Alessandro Bertero, Dylan Pearson, Wesley Schmutzler, Matteo Bertoni

    "The SR 83/US 331 highway is located in the Florida panhandle, where it connects the Walton County beaches to the I-10 corridor. The roadway is of vital importance to the economy of the area as well a

    Jan 1, 2017

  • DFI
    Grouting Methods Involved in Stabilization of TBM Tunnel near CP-06, UAA-04, Chennai Metro

    By Yeruva Ramanareddy, Sohail Wajid, Ahmed Shaz, K. Bhavani

    "CP-06 is an NATM cross passage which connects up-line and down-line metro tunnels near Kilpauk Medical College, Chennai. It lies completely in loose silty sand to dense sand with water table almost t

    Jan 1, 2017

  • DFI
    Effect of Non-Plastic Fines on Liquefaction Susceptibility of Fine Sands

    By Kodi Ranga Swamy, N. Sankar, M. Akhila

    "Until recently, liquefaction-related studies concentrated on clean sands believing that only sands are susceptible to liquefaction. However, a few earthquakes like 1976 Tangshan earthquake, the 1989

    Jan 1, 2017

  • DFI
    Structure Support on Laterally Swept Piles

    By Morgan L. Race, Matthew R. Glisson

    "Most driven pile projects have plumbness limits from 0.25 in/ft (21 mm/m) to 0.5 in/ft (42 mm/m) to control bending stresses. For two projects, the project teams performed static load testing to eval

    Jan 1, 2017

  • CIM
    Operating experience and developments of G-REX and AuRIX®100 resin exchange technology

    By N. Katsikaros, A. Lewis-Gray, P. Richards

    "To optimize gold recovery in complex leach-to-electrowinning processes, Gekko Systems developed the Gekko resin exchange column (G-REX) as an intermediate step, using a highly gold-selective resin to

    Jan 1, 2017

  • DFI
    Evaluating Efficiency of Geo5 in the Analysis of Pile Foundation

    By Elizabeth Varghese, Sanket Rawat, Prachuryya Kaushik, Ravi Kant Mittal

    "Geo5 Software is gaining popularity worldwide due to its expediency in analysis and design of pile foundation. The analysis is based on various theoretical, empirical and semi-empirical methods avail

    Jan 1, 2017

  • CIM
    Comminution Circuit Design Considerations (49th Annual Canadian Mineral Processors Operators Conference©, Ottawa, Ontario, January 17-19, 2017)

    By S. Rivard

    "This paper demonstrates the selection of grinding circuit technology for a number of recent projects including discussion of the key drivers and the role of energy efficiency. Decreasing head grades

    Jan 1, 2017

  • DFI
    Alameda Corridor-East: San Gabriel Trench Project

    By David Peterson, Terry Tucker, Rafael Serrano

    "The Alameda Corridor-East (ACE) Construction Authority awarded a $172.6 million contract to Walsh Construction Company (Walsh) for the construction of a 2.2 mi (3.5 km) long grade separation includin

    Jan 1, 2017

  • CIM
    Agnico Eagle LaRonde plant: Metallurgical challenges present and future

    By J. Cayouette, C. Bolduc, P. Blatter

    "The LaRonde mill was commissioned in 1988 and began treating ore from the Penna shaft in 2000. The mill has been expanded to accommodate 7,500 t/day, but ramped down to 6,000 t/day since the deep ext

    Jan 1, 2017

  • DFI
    Design and Construction of Driven H-Piles for Landslide Stabilization in Marlboro Clay

    By Charbel Khoury, Kwabena Ofori-Awuah, Kofi B. Acheampong

    "Following heavy rains in spring of 2014, Prince George’s County officials issued a mandatory evacuation for homes in the Piscataway Hills subdivision of Fort Washington, Maryland where a landslide al

    Jan 1, 2017