Search Documents

Sort by

  • AUSIMM
    The Century Discovery, Queensland, Australia - Is Exploration Ever Complete? (c0b4033c-7bcc-4cd7-babd-7aa89f5e67ef)

    The Century zinc-lead-silver deposit has a geological resource of 118 million tonnes averaging 10.2% zinc, 1.5% lead and 36 g/t silver. It lies approximately 250 km NNW of Mt Isa in NW Queensland, Au

    Jan 1, 1995

  • CIM
    Hoist rope improvements through thermo plastic enhancement

    By Bill Parnell

    "Friction winders and double drum winders have been used in the vertical shaft mining industry for over 100 years. In that time, there have been many changes made in the electronic and mechanical fiel

    Jan 1, 1995

  • AUSIMM
    Prediction of Size Distributions from Compressing Crusher Machines

    During the last few years the quality requirements on roads and railroads have become more accentuated due to the desire to minimise maintenance costs. This has, in turn, led to increasing requireme

    Jan 1, 1995

  • AUSIMM
    Simulation of Solute Movement and Comparison with Experimental Data

    An understanding of the way that solutes are transported in mining or natural environments is essential to the development of sound strategies for managing waste disposal. Research on miscible polluta

    Jan 1, 1995

  • AUSIMM
    The Tolukuma Gold Silver-Vein System, Papua New Guinea (3cebb8ab-1142-46c7-bc74-b33c04791680)

    By Corbett GJ, Leach TM

    A continued exploration programme has further defined the geology of the Tolukuma vein system, verified the resource indicated by Newmont, and identified potential for additional mineralisation. The

    Jan 1, 1995

  • TMS
    Definition of Mineral Textural Types Aiming at the Beneficiation of Aljustrel and Neves-Corvo Massive Sulphides

    By Orlando C. Gaspar

    The textures of the ores, the fine mineral intergrowths, the complex distribution of the deleterious minor elements, and the low base metal contents in some ore types, pose many technological problems

    Jan 1, 1995

  • AUSIMM
    Issues of Mining Equipment Automation

    This paper reviews the issues of mining machinery automation with special emphasis on underground applications. Automation is desirable because it offers the following advantages: ò increased safety

    Jan 1, 1995

  • AUSIMM
    Accreted Terranes and Porphyry Copper Deposits in the Central Andes

    The Central Andes in Peru, Chile, Bolivia, and Argentina , contain two contiguous terranes which were accreted to Gon

    Jan 1, 1995

  • AUSIMM
    Environmental Management Plans to Reduce Mine Closure Costs

    By I F. Bell, K P. Hammerschmid

    Well planned and executed environmental management plans can reduce life-of-mine operating costs and the need to deal with major environmental issues at the time of mine closure. With proper planning

    Jan 1, 1995

  • AUSIMM
    High-Si Rhyolites and Shoshonitic Volcanics - A Late Cretaceous Bimodal Association, Noumea Basin, New Caledonia

    The transgressive sedimentary sequence of the Noumea Basin contains rhyolitic lavas and less voluminous mafic and intermediate volcanics of shoshonitic affinities which erupted simultaneously during t

    Jan 1, 1995

  • SME-ICGCM
    Parameters Affecting Resin-Anchored Cable Bolt Performance: Results Of In Situ Evaluations

    By Joseph C. Zelanko

    Cable bolt support techniques. including hardware and anchorage systems, continue to evolve to meet U.S. mining requirements. For cable support systems to be successfully implemented into new ground c

    Jan 1, 1995

  • AUSIMM
    Application of Computer Assisted Modelling to Final Wall Blast Design

    By Jones J. P, Arriagada J, Scherpenisse C. R

    A recently-developed model is used as a tool to optimise the design of blasts used to create final walls in large open pit mines. The use of this tool has allowed present blasting practice and propo

    Jan 1, 1995

  • ISEE
    LANFO with Recycled Oil Practical and Economic Advantages

    By A J. Rorke, U Chhika

    "A series of tests was carried out on a dry blend of PPAN and LAN prills (LANFO). The objective of thetests was to determine detonation stability and VOD performance compared to ANFO. Heave andfragmen

    Jan 1, 1995

  • DFI
    Dynamic Testing Results Indicator Pile Test Program --I-880 - Introduction

    By D. Michael Holloway

    The California Department of Transportation (CALTRANS) evaluated several pile foundation schemes for supporting the structures along the realignment of Interstate 880. The project replaces the double-

    Jan 1, 1995

  • AUSIMM
    Permian and Mesozoic Tectonic and Structural Events in the Bowen and Surat Basins and New England Orogen, Southwest Pacific Rim

    By J M. Totterdell

    The Permian-Triassic Bowen Basin and the Jurassic-Cretaceous Surat Basin evolved in a backarc tectonic setting behind an active convergent plate margin in eastern Gondwana. Several extensional (Early

    Jan 1, 1995

  • ISEE
    Predicting the Envelope of Damage Resulting from the Detonation of a Confined Charge (aa576ad1-736a-4e7e-9977-8fe1a93c21b3)

    By Jason M. Ryan, T Michael LeBlanc, John H. Heiiig

    Drill trajectory deviation is a recurring problem in the Mining Industry retreat stoping operations. As a result of this deviation, it is quite concevable that 60 kg (165 mm 0) and 103 kg (203 mm 0) e

    Jan 1, 1995

  • DFI
    Sheetpile Installation Vibration Study

    By Kenneth A. Pidgeon

    This paper presents a case history on mitigating vibration problems associated with the installation of steel sheetpiles. The project in-cludes installation of steel sheetpiles for a utility trench wi

    Jan 1, 1995

  • SME
    Large Flotation Cell Tests Successful in Chile

    By J. Kallioinen

    The development of mechanical flotation cells has resulted in larger and better cells. This has led to flotation banks with only a few units, even in large-scale operations. This equipment development

    Jan 1, 1995

  • NIOSH
    U.S. Bureau Of Mines Training Workshop On The "MFIRE" Mine Fire And Ventilation Simulator ? 1.0 Introduction

    By Linneas W. Laage

    MFIRE is a computer simulation program that performs normal ventilation network planning calculations, and dynamic transient state simulation of ventilation networks under a variety of conditions. The

    Jan 1, 1995

  • CIM
    Paste Fill Design at the Louvicourt Mine

    By Pierre Lacombe

    "The operation of the Louvicourt Mine will have to rely on stringent grade control and on the optimization of the amount of blocked ore made available per given development effort. All of the above be

    Jan 1, 1995