Search Documents
Search Again
Search Again
Refine Search
Refine Search
- Relevance
- Most Recent
- Alphabetically
Sort by
- Relevance
- Most Recent
- Alphabetically
-
Blast Casting At An Eastern Strip Mine (b31012bf-2fc9-4254-a7e6-574a95628df1)By R. R. Rollins
Field data combined with theoretical derivations were used to design a surface mining operation using explosive casting. Calculated casting results varied from 44 to 65% depending on bench height. T
Jan 1, 1987
-
Coal Resource Planning in the Hunter RegionBy Short KC
The Hunter Region, with a major part of the coal resources of New South Wales and a long history of coal mining, has experienced a rapid expansion of coal resource development in recent years. Whi
Jan 1, 1987
-
Geology and Resource Estimation at the Panguna Porphry Copper/Gold Mine Papua New GuineaDaily geological mapping of the Panguna porphyry copper/gold system since mining began in 1971 has provided a good basis for resource estimation and mine planning as the mine and estimation methods
Jan 1, 1987
-
Application Of, And Experience With, An Electronically-Controlled Hydraulic Piling Hammer ? 1 ? IntroductionBy D. Arentsen
Changing environmental laws, new operating requirements and the increasing accuracy with which the bearing capacity of driven piles can be calculated have all led to the development of hydraulic pilin
Jan 1, 1987
-
Evaluation Of Water-Jet-Assisted Cutting - ObjectiveDetermine the advantages and operational limitations of water-let-assisted cutting used with mining equipment. Approach The Bureau of Mines con-ducted a research study to evaluate water-Jet-as
Jan 1, 1987
-
Controls on the Hydrology of Large Volcanically Hosted Geothermal Systems : Implication for Exploration for Epithermal Mineral DepositsBy Lawless JV
Recent exploration for gold on the Pacific Rim has utilised similarities between active hydrothermal systems and epithermal gold deposits. The major control over formation of such deposits is the
Jan 1, 1987
-
Geologic Conditions Affecting Mineability in the Jane Mine.By Stephen J. Harven
Geologic conditions in eight northern operating sections of Jane Mine, Keystone Coal Mining Complex. Armstrong County, Pennsylvania are defined by utilizing drillhole data and underground geologic map
Jan 1, 1987
-
MLA 39-87 - Mineral Resources Of The Twelve Mile Creek Study Area, Malheur County, Oregon - SummaryBy Steven W. Schmauch
In 1986, at the request of the U.S. Bureau of Land Management, the U.S. Bureau of Mines Studied 25,340 acres of the 28,960-acre Twelve Mile Creek Wilderness Study Area (OR-003-162) in order to evaluat
Jan 1, 1987
-
Newly Developed Method and Equipment for Tunnel Excavation-Construction of Myojin TunnelBy Fukuichi K, Matsukawa H, Nakagawa M
The Myojin Tunnel, located on the Shikoku Expressway being constructed by the Japan Highway Public Corporation, is 3,770 m long with a cross sectional area of 80 m2. Kajima Corporation, the contrac
Jan 1, 1987
-
Ground And Liner Behavior During Construction Of The Mt. Baker Ridge TunnelBy Alexander I. Feldman, Michael S. Kucker, Robert A. Robinson, Harvey W. Parker
An extensive geotechnical monitoring program was used to assess ground and liner behavior, provide input to a Disputes Review Board, and verify design assumptions during construction of the Mt. Baker
Jan 1, 1987
-
RI 9071 - Capability Evaluation of the Radial-Axial SplitterBy S. J. Anderson
To deftne the capabilities of a nonexplosive excavation concept, the Bureau of Mines conducted reduced-scale laboratory tests of a mechanical excavation tool called a rock splitter. The splitter inve
Jan 1, 1987
-
Design of Medium Recovery and Heavy Medium Management Circuits- A Different ApproachThe paper describes the design of the dilute medium and medium recovery circuits installed at the coal preparation plants at the Cornwall Coal Company's Fingal Mine, and the BP Coal Australia
Jan 1, 1987
-
Record Performance Of TBM In The 13.5 Km Amlach Tunnel, AustriaBy Hans Janzon, Ernst Buechi
INTRODUCTION The headrace tunnel in Amlach is part of a hydro electric power scheme near the city of Lienz in south west Austria. The project is owned and developed by Tiroler Wasserkraftwerke AG,
Jan 1, 1987
-
Copper, Gold and Subduction: A Trans-Pacific PerspectiveRajor intrusion-related Cu and Au dep- osits along the Cordilleran-type central Andean margin and in the western Pacific island arcs constitute a series of discrete, linear belts which correspond t
Jan 1, 1987
-
Driving And Testing Of 75 M Long H-Piles In Shanghai - 1 . SynopsisBy Lucien Weber
In the Shanghai area, the soil conditions are such that bearing piles have become an essential foundation part of the new highrise buildings. In order to reduce the settlements under the high working
Jan 1, 1987
-
An Unusual Permanent Shoring JobBy Gordon Demetrick
3900 Yonge St. was not a typical site on which to build a condominium apartment. A steep hill covered the majority of the site. In order to use as much of this site as possible, the rear of the buildi
Jan 1, 1987
-
RI 9070 - Fine Grinding of Coal by the Turbomilling ProcessBy E. G. Davis
As a result of interest by the U.S. Department of Energy, the Bureau of Mines conducted studies on comminution of bituminous coal to the 2-um particle size range using the Bureau-developed turbomill.
Jan 1, 1987
-
IC 9154 Computer Modeling of the Effect of Mine-Fire-Induced Ventilation Disturbances on Stench Fire Warning System PerformanceBy Linneas Laage, Thomas Weber, William Pomroy
"Underground mine fires can significantly influence mine ventilation airstreams, in some cases throttling or even reversing airflows. As a result, the performance of a metal and nonmetal mine stench f
Jan 1, 1987
-
Reconstruction of Morphetts Enginehouse, BurraBurra was the largest metalliferous mine in Aus- tralia between 1845 and 1860 and employed as many as 1000 men and boys. The workforce was predominantly Cornish, Burra being the first con- centratio
Jan 1, 1987
-
MLA 16-87 - Mineral Resources Of The Little High Rock Canyon Study Area, Humboldt And Washoe Counties, Nevada ? SummaryBy Thomas J. Peters
In 1985, at the request of the U.S. Bureau of Land Management, the U.S. Bureau of Mines studied a 17,320-acre portion of the 52,143-acre Little High Rock Canyon Wilderness Study Area (CA-020-913/NV-02
Jan 1, 1987