Search Documents

Sort by

  • AUSIMM
    Current Approaches and New Developments in Reducing Environmental Impacts in the Mining Industry

    By T F. Guerin

    Explorationn and mining have shown to cause significant impacts to the terrestrial and marine environment. Current mining and exploration techniques are outlined in the light of their potential to imp

    Jan 1, 1992

  • CIM
    Process Design Consideration for a Small Gold Mill in the Northwest Territories

    By A. M. Childs, R. F. Mather, K. R. Rawling

    "The challenges encountered in the design and construction of mines and their process facilities today are becoming more intense and the engineering more competitive. The need to incorporate new techn

    Jan 1, 1983

  • NIOSH
    IC 9506 - Guidelines for Permitting, Construction, and Monitoring of Retention Bulkheads in Underground Coal Mines ? Executive Summary

    By Samuel P. Harteis

    Many mining operations rely on retention bulkheads to provide a barrier between impounded water and active mine workings. However, bulkhead failures can cause catastrophic flooding that puts the under

    Jan 1, 2008

  • DFI
    Vertical And Lateral Load Tests On Driven And Cast-In-Place Piles ? Synopsis

    By G. Price

    The Building Research Establishment installed a base load cell in a driven cast-in-place pile prior to it being tested under vertical load. The monitored base loads were found to be significantly less

    Jan 1, 2010

  • SAIMM
    Grinding Control Strategy On The Conventional Milling Circuit Of Palabora Mining Company

    By B. J. du Plessis

    Automation of the conventional grinding circuits of Palabora Mining Company (PMC) required that adequate instrumentation and a control system had to be put in place, after which extensive testing had

    Jan 1, 2001

  • AUSIMM
    Contributed Discussion to "Some New Ideas on the Age and Origin of the Etheridge Goldfield, Queensland, and their Exploration Implication" by J. C. Bain (Proceedings No. 277, March 1981)

    The recent paper by Bain (1981) contains an unfortunate, and potentially misleading typographic error. On page 9, second paragraph, Bain states that, "some samples of drill core from the (Candlow

    Jan 1, 1981

  • NIOSH
    Diagnosing and Controlling Moisture - Sensitive Roof in Coal Mines

    By Gregory Molinda

    Historically, coal miners have known that roof shales can deteriorate in contact with humid mine air, causing massive roof falls and injuries from falling rock. It is critical to recognize rocks prone

    Jan 1, 2008

  • CIM
    Teck’s Secondary Leaching Technology

    By H. M. Lizama, R. L. Stephens

    Secondary leaching of previously leached supergene copper ore has been developed and implemented at Teck’s Quebrada Blanca operations. This consists of using in-situ leaching techniques aided by geoph

    Jan 1, 2019

  • AUSIMM
    Operation of deep mill level zone mixed flow fans after the first fan upgrade – a parallel fans case study

    By K Lownie, R Sani, A Sianturi

    Part of the PT Freeport Indonesia (PTFI) mine production is in the process of transitioning from the deep ore zone (DOZ) mine to the deep mill level zone (DMLZ) mine. The DMLZ mine is the next lift in

    Aug 28, 2017

  • AIME
    The 125th Meeting Of The Institute

    THE 125th meeting of the Institute was held in New York, Feb. 20-23, 1922, inclusive, and was the most successful annual meeting of the Institute ever held; there was a larger registration, there were

    Jan 3, 1922

  • SME
    CSO Control At Detroit?s Upper Rouge Tunnel

    By Wern-ping Chen

    To mitigate and control the combined sewer over-flows from 17 outfalls in Detroit, MI, three outfalls in Dearborn Heights, MI and eight outfalls in Redford Township MI, the Detroit Water and Sewerage

    Jan 1, 2007

  • NIOSH
    Wet Auger Dust Control ? The Objective:

    To reduce the respirable dust generated by auger-type continuous coal mining machines. The Approach: Use water sprays close to the cutting bits on the auger so that coal fragments are thoroughly

    Jan 1, 1974

  • SME
    Considerations for improving the performance of froth flotation systems

    By Richard R. Klimpel

    Introduction Froth flotation is one of the most common unit engineering operations in use today. Its aim is to upgrade the quality of coal by removing ash/pyrite and separating selected minerals from

    Jan 12, 1988

  • SAIMM
    The Functional Design Of Surface Mine Haul Roads

    The functional design of a pavement relates to the selection of appropriate wearing course materials which optimise the trafficability of a pavement. Trafficability is dictated to a large degree by th

    Jan 1, 2000

  • DFI
    Pile Top Hydraulic Hammer Drive Down The Hole Chiselling Round Steel Piling System - Summary

    By J. Nakayama

    For installation of round steel piles or cast-in-place pile construction through boulder contained ground or rocky formation, usual system does not function properly or impossible to work. This paper

    Jan 1, 1999

  • AUSIMM
    Down-Hole XRD Analyses as a Guide to Hydrothermal Alteration in the Wharekirauponga Epithermal Gold-Silver Prospect, Hauraki Goldfield, New Zealand

    By R Soong

    The Wharekirauponga (WKP) epithermal gold-silver deposit is located about 10 km north of Waihi in the Hauraki Goldfield east of Auckland. WKP is notable for its sheeted to stockwork quartz veins hoste

    Jan 1, 2001

  • SME
    Tunneling for the Eastlink Project, Melbourne, Australia

    By Peter Campi, Harry R. Asche, Ian P. Callow, Edmund G. Taylor, P. Scott Smith

    The US$1,850 million EastLink project is a 39km tollway and includes twin 3-lane,1.5km long, undrained driven tunnels. The hard rock tunnels are being built to avoid passing the motorway through the M

    Jan 1, 2007

  • SME
    Dewatering, Interpretation Of Landform, And Installation Of Steel Arches For Reinforcement Of Tunnel Section

    By D. J. Gilbert

    As a preventive action, the geotechnical department at the mine analyzed the original topography overlying a conveyor tunnel at the mine. Several dewatering drains were installed to intercept water co

    Jan 1, 2011

  • SAIMM
    Hydrometallurgical Treatment Of Haib Copper Ore

    By W. J. Schlitt

    The Namibian Copper Joint Venture has been formed to undertake development of the Haib copper deposit, one of the largest undeveloped copper resources in Africa. The development programme includes ext

    Jan 1, 1999

  • CIM
    Application of the Woodgrove Staged Flotation Reactor (SFR) Technology at the New Afton Concentrator (48th Annual Canadian Mineral Processors Operators Conference©, Ottawa, Ontario, January 2016)

    By K. Swedburg, M. Samuels

    "The New Afton concentrator was commissioned in June 2012, reaching the design milling rate in September 2012. By late 2013, through a campaign of optimization and de-bottlenecking, it was recognized

    Jan 1, 2016