Search Documents

Sort by

  • SME
    Integrating Community Capacity Building And Reuse Planning Into The Reclamation Of American Mine-Lands: How U.S. Regulators Are Cleaning Up With Communities

    By K. A. Larsen, J. L. Ariail, C. M. LaRosa

    This article discusses the evolution of U.S. laws and policies towards environmental remediation at mine lands over the last 20years, the opportunities that these changes present for reuse, and the re

    Jan 1, 2004

  • AIME
    Further Discussion - Further Discussion on Water Gas Reservoirs: Uncertainty in Reserves Evaluation From Past History

    By W. Hurst

    The authors of this paper, in substituting values in a material balance equation associated with a gas reserve and a water drive, cannot find sustainment of what the gas in place should be; therefore,

  • CIM
    An Overview of Corporate Social Responsibility in the Canadian Mining Industry

    By Dara L. Hrytzak-Lieffers

    Canada has long since been a place that has led the world in mining development, in a safe, clean, and sustainable manner. This has led to the integration of corporate social responsibility (CSR) phil

    May 1, 2011

  • NIOSH
    The Mineral Industry Of Alabama

    By Avery H. Reed

    RECORD production of cement, clays, salt, sand and gravel, and stone highlighted the mineral industry of the State in 1956. Coal and iron-ore production declined owing to increased imports of foreign

    Jan 1, 1958

  • NIOSH
    OFR-52-77 Alternate Conveyor Design For Mine Machinery

    By James H. Snyder

    This final report presents results of a program to develop a new conveyor system, adaptable to existing miners or loaders, which reduces the noise level to 90 dBA without reducing machine performance.

    Jan 1, 1976

  • NIOSH
    OFR-5-76 Development And Evaluation Of Radon Sealants For Uranium Mines ? Introduction

    By H. G. Hammon

    Uranium miners have been shown to develop lung cancer in direct proportion to the time of exposure in the mine and the concentration of radioactivity (cumulative working level).1 Radon gas is continua

    Jan 1, 1975

  • NIOSH
    OFR-14-84 Improved Crowd Limit Switches And Greenhorn For Electric Shovels

    By Gary Choate

    The work presented in this report represents the background activity which led to the fabrication and testing of a greenhorn and crowd limit switch system for electric shovels. The program began With

    Jan 1, 1983

  • SAIMM
    Measurement Systems For Gravity Circuit Performance: A New Approach.

    By R L. Langak, R A. Heins

    The use of differences in specific gravity between minerals to separate them has long been utilized in the extractive industries. The environmental and cost benefits of the commercialized forms of the

    Jan 1, 2006

  • CIM
    The Millennium Iron Range Project

    By Robert Martin

    New Millennium ?a new project for an experienced mine building team ?Owns 100% of KeMag(Harris Lake) property ?Owns 80% of LabMag(Howells River) property -20% owned by Naskapi Nations of Kawawachika

    May 1, 2007

  • NIOSH
    U.S. Bureau Of Mines Training Workshop On The "MFIRE" Mine Fire And Ventilation Simulator ? 1.0 Introduction

    By Linneas W. Laage

    MFIRE is a computer simulation program that performs normal ventilation network planning calculations, and dynamic transient state simulation of ventilation networks under a variety of conditions. The

    Jan 1, 1995

  • ISEE
    Blasting Claims 101: An Introduction to the Defense of Claims

    By Joshua A. Bennett

    "Lawsuits where owners allege their property has been damaged by nearby blasting routinely costblasting companies, explosives engineers, and others in the field both time and money. When ownersfeel th

    Jan 1, 2016

  • AUSIMM
    Structural Controls in the Tarnagulla Goldfield, Central Victoria: Implications for Metamorphically Derived Auriferous Fluids

    By V Morand, W R. H Ramsay

    Structural, mineralogical, and textural data from the Tarnagulla Goldfield demonstrate that the area has undergone three significant phases of deformation. The first phase of deformation (D1) predates

    Jan 1, 1995

  • AUSIMM
    A Potential Use of Oxygen and Carbon Isotope Zonations of Wall Rocks in Prospecting Skarn Pb-Zn Deposits at Kamioka, Central Japan

    By H Peiming, W Sakurai, Y Matsuhisa, H Shimazaki, Y Fukahori

    Oxygen and carbon isotope mapping of hydrothermally altered wall rocks was applied to the blind ore prospecting of skarn Pb-Zn deposits in the Kamioka mining district, centralJapan, where the wall roc

    Jan 1, 1995

  • NIOSH
    U.S. Bureau Of Mines Training Workshop On The "Mfire" Mine Fire And Ventilation Simulator - Mfire Users Manual Version 2.20 August 1995 ? Introduction

    MFIRE is a computer simulation program that performs normal ventilation network planning calculations, and dynamic transient state simulation of ventilation networks under a variety of conditions. The

    Jan 1, 1995

  • NIOSH
  • NIOSH
    OFR-63-77 Feasibility Study Of A Differential Current Ground Fault Or Leakage Current Sensor For Direct Current Offtrack Machines - 1.0 Introduction

    By Robert R. Perron

    The U.S. Bureau of Mines is engaged in many diverse programs fur improving mine safety. One area of interest to the Bureau is new and improved means for minimizing the hazards of accidental gas igniti

    Jan 1, 1976

  • NIOSH
    MLA 16-89 - Mineral Resources Of The Borah Peak Study Area, Custer County, Idaho ? Summary

    By Michael S. Miller

    In 1987 and 1988, at the request of the U.S. Bureau of Land Management, the U.S. Bureau of Mines studied the 3,100-acre Borah Peak Wilderness Study Area (10-047-004) and a 708-acre parcel adjacent to

    Jan 1, 1989

  • CIM
    Developing a Consistent Approach to Mine Reclamation - Cape Breton Development Corp. (CBDC) Mine Site Closure Program

    By Belinda Campbell

    Tools for Consistency 1. GIS Web Site 2. National Project Management System 3. Site Grouping Approach (721 PIDs) 4. Mine Reclamation Standing Offer Agreements ?Contracting tool 5. Remedial Object

    May 1, 2011

  • CIM
    Improved Concentrate Grade and Recovery through the Application of the 6 Sigma Methodology at Noranda Matagami Mill

    By Martin Plante, Denis Hamel, Marie-Pier Bédard, Jeff McLaughlin

    "The results and methodology for the optimisation of the zinc flotation circuit at the Matagami Mill using the 6-Sigma methodology are shown in detail while only the base line and final results are pr

    Jan 1, 2001

  • DFI
    Multiple Foundation Systems For The Porter Street Outfall Relocation For The North Approach - Summary

    By William D. Spielvogel

    The Massachusetts Highway Department awarded the Porter Street Outfall Project to the J.M. Cashman Company in November 1991. Timely completion of the Project in one and one half years is critical to t

    Jan 1, 1994