Search Documents

Sort by

  • AUSIMM
    Oxidation at the Orieco Copper Mine, Eastern Tasmania

    At the Orieco mine quartz veins carrying sulphides were localized in parts of an extensive fault zone in the Mathinna Beds during late Middle Palaeozoic mineralization.These deposits were subsequently

    Jan 1, 1970

  • DFI
    A Case Study Supporting The Need For A Rational Method For Design And Installation Of Vibratory Driven Piles

    By Franklin M. Grynkewicz

    The subject of bearing pile performance installed by vibratory hammers has been a matter of increasing study and continued controversy. A recent case study from a major bridge replacement project is d

    Jan 1, 1991

  • TMS
    Physicochemical Study For The Reduction Of Nickel Concentrate Calcine With Products Of Vapor Oxidation Of Fuel Oil And Solid Carbon

    By Andrey V. Tarasov

    To carry out a physicochemical substantiation of a transition to ?soft? modes of reduction of calcine obtained by desulfurizing roasting of nickel concentrate produced as a result of copper-nickel con

    Jan 1, 2005

  • TMS
    Characterization of Fibers from Different Parts of the Buriti Palm Tree

    By Tammy G. R. Portela

    A comparative characterization of the dimensional and mechanical properties as well as structural aspects of two different types of fibers extracted from the leaves and petioles of the buriti palm tre

    Jan 1, 2010

  • NIOSH
    Coal Dust Particle Size Survey Of U. S. Mines

    By Michael J. Sapko, Gregory M. Green, Kenneth L. Cashdollar

    The National Institute for Occupational Safety and Health (NIOSH) and the Mine Safety and Health Administration (MSHA) conducted a joint survey to determine the range of coal particle sizes found in d

  • SAIMM
    Pit Slope Design And Risk ? A View Of The Current State Of The Art

    By T D. Sullivan

    Risk lies at the heart of all mining and nowhere more so than in pit slope design. Mining is principally about two areas of risk; safety and economics. This paper addresses the main elements of pit

    Jan 1, 2006

  • NIOSH
    OFR-42-73 Laser Irradiation As A Rapid Screening Process For The Evaluation Of Flame Inhibitors

    By Fred S. Karn

    Inhibitors are used in coal mines as a precaution against accidental dust explosions. Although rock dust is the usual inhibitor many others have been tested. To facilitate testing a screening process

    Jan 1, 1973

  • NIOSH
    MLA 44-82 - Mineral Resource Potential Of The Freel Peak Rare II Area (No. 5271), El Dorado County, California ? Summary

    By Thomas J. Peters

    In 1979 and 1980, the U.S. Bureau of Mines and U.S. Geological Survey conducted a mineral survey of the 15,600 acre (6,310 ha) Freel Peak RARE II area (No. 5271) in the Lake Tahoe Management Unit. T

    Jan 1, 1982

  • DFI
    Determination Of Design Pile Uplift Capacities Using Dynamic Pile Testing Methods

    By Juan M. Antorena

    A pile driving and testing program was undertaken to evaluate installation procedures, assess capacity, particularly in uplift, of 360- and 460-mm (14- and 18-inch) square prestressed concrete piles a

    Jan 1, 1995

  • NIOSH
    MLA 47-83 - Mineral Investigation Of The Scodies Rare II Area (No. 5212), Kern County, California ? Summary

    By Donald O. Capstick

    The U.S. Bureau of Mines conducted an inventory of the prospects and mineral resources in the Scodies RARE II area (No. 5212) in 1982. No mineral production is recorded from the area, and no mines are

    Jan 1, 1983

  • NIOSH
    OFR-115-93 Application Of Cost Engineering To Determine The Optimum Production Rate For Waste Remediation Of Mine Tailings

    By Thomas W. Camm

    The U.S. Bureau of Mines has developed a system for estimating mining and processing costs as a function of process feed rate with the objective of applying this system to abandoned mine tailings and

    Jan 1, 1993

  • NIOSH
    OFR-19-76 Development Of A Prototype Instant Working Level Meter With Automatic Individual Radon-Daughter Readout ? 1.0 Introduction

    By Peter G. Groer

    The commonly used exact methods (1-2) to determine the WL measure the total a activity or the total number of a counts during three preselected time periods. Due to the half-lives involved (TRaB = 26.

    Jan 1, 1975

  • NIOSH
    OFR-31-86 Conveyor Belt Dust Control

    By Vinit Mody

    The belt conveyor is one of the major pieces of equipment for transferring bulk material in mining operations. However, considerable amount of respirable dust may be generated whenever the bulk materi

    Jan 1, 1984

  • NIOSH
    Twenty-Four Conferences; More Than One-Hundred And Seventy Papers; Understanding Roof Bolt Selection And Design Still Remains Priceless

    By Stephen C. Tadolini, Raymond A. Mazzoni

    The International Ground Control Conference in Mining has always provided an open forum for the publication, presentation, discussion, and often heated debate on roof bolting systems mostly with atten

  • SME
    Analysis Of Sampling And Slurry Flow Using Multi-Physics Modeling - Preprint 09-058

    By D. McBride

    Representative samples are required from process streams in order to accurately measure chemical and physical characteristics. This information can then be used by process operators and metallurgists

    Jan 1, 2009

  • CIM
    Fleet management system for underground mines (dd9c7c45-cd77-4292-966a-863f63e39c89)

    By R. Grimard, M. Gamache, L. -P. Bigras, P. Cohen

    This paper describes a real-time fleet management system for an undergroun mine. Dispatching, routing and scheduling are handled simultaneously, taking into account the mine status, operational constr

    Jan 1, 2004

  • ISEE
    Electronic Detonators Technology of the Future

    By Aloke Verma, R. Singh, S. Jana, C. Sawmliana, P. Pal Roy

    On July 21, 2004, a trial blast using electronic detonators was conducted in India for the first time in an opencast mine at Pundi-E Quarry of TISCO, West Bokaro. Orica-IEL conducted the test using el

    Jan 1, 2006

  • DFI
    Innovative Use Of Piles For Retaining Sides Of Deep Excavations ? Synopsis

    By D. V. Karandikar

    Contiguous bored piles have been used in the past for retaining the sides of deep excavation. An innovative version of this method was adopted successfully in two prestigeous projects in Bombay in whi

    Jan 1, 1996

  • SME
    Specifications For Initial Support In Rock Tunnels

    By William F. Daly, William H. Hansmire

    Installation of initial tunnel support is often the most uncertain element of work in the design of, and a contractor bidding on, construction of a rock tunnel. The risks the construction contractor a

    Jan 1, 1985

  • DFI
    Deep Excavation In The Shanghai Soft Clay Under Protection Of A Cast-In-Situ Retaining Wall ? Synopsis

    By M. Pernot

    A 12 m-deep excavation has to be perfomed in the Shanghai soft clay to install an underground electric substation. This article was originally intended to study the behaviour of the wall, the excavati

    Jan 1, 2010