Oxidation at the Orieco Copper Mine, Eastern TasmaniaAt the Orieco mine quartz veins carrying sulphides were localized in parts of an extensive fault zone in the Mathinna Beds during late Middle Palaeozoic mineralization.These deposits were subsequently
Jan 1, 1970
-
A Case Study Supporting The Need For A Rational Method For Design And Installation Of Vibratory Driven PilesBy Franklin M. Grynkewicz
The subject of bearing pile performance installed by vibratory hammers has been a matter of increasing study and continued controversy. A recent case study from a major bridge replacement project is d
Jan 1, 1991
-
Physicochemical Study For The Reduction Of Nickel Concentrate Calcine With Products Of Vapor Oxidation Of Fuel Oil And Solid CarbonBy Andrey V. Tarasov
To carry out a physicochemical substantiation of a transition to ?soft? modes of reduction of calcine obtained by desulfurizing roasting of nickel concentrate produced as a result of copper-nickel con
Jan 1, 2005
-
Characterization of Fibers from Different Parts of the Buriti Palm TreeBy Tammy G. R. Portela
A comparative characterization of the dimensional and mechanical properties as well as structural aspects of two different types of fibers extracted from the leaves and petioles of the buriti palm tre
Jan 1, 2010
-
Coal Dust Particle Size Survey Of U. S. MinesBy Michael J. Sapko, Gregory M. Green, Kenneth L. Cashdollar
The National Institute for Occupational Safety and Health (NIOSH) and the Mine Safety and Health Administration (MSHA) conducted a joint survey to determine the range of coal particle sizes found in d
-
Pit Slope Design And Risk ? A View Of The Current State Of The ArtBy T D. Sullivan
Risk lies at the heart of all mining and nowhere more so than in pit slope design. Mining is principally about two areas of risk; safety and economics. This paper addresses the main elements of pit
Jan 1, 2006
-
OFR-42-73 Laser Irradiation As A Rapid Screening Process For The Evaluation Of Flame InhibitorsBy Fred S. Karn
Inhibitors are used in coal mines as a precaution against accidental dust explosions. Although rock dust is the usual inhibitor many others have been tested. To facilitate testing a screening process
Jan 1, 1973
-
MLA 44-82 - Mineral Resource Potential Of The Freel Peak Rare II Area (No. 5271), El Dorado County, California ? SummaryBy Thomas J. Peters
In 1979 and 1980, the U.S. Bureau of Mines and U.S. Geological Survey conducted a mineral survey of the 15,600 acre (6,310 ha) Freel Peak RARE II area (No. 5271) in the Lake Tahoe Management Unit. T
Jan 1, 1982
-
Determination Of Design Pile Uplift Capacities Using Dynamic Pile Testing MethodsBy Juan M. Antorena
A pile driving and testing program was undertaken to evaluate installation procedures, assess capacity, particularly in uplift, of 360- and 460-mm (14- and 18-inch) square prestressed concrete piles a
Jan 1, 1995
-
MLA 47-83 - Mineral Investigation Of The Scodies Rare II Area (No. 5212), Kern County, California ? SummaryBy Donald O. Capstick
The U.S. Bureau of Mines conducted an inventory of the prospects and mineral resources in the Scodies RARE II area (No. 5212) in 1982. No mineral production is recorded from the area, and no mines are
Jan 1, 1983
-
OFR-115-93 Application Of Cost Engineering To Determine The Optimum Production Rate For Waste Remediation Of Mine TailingsBy Thomas W. Camm
The U.S. Bureau of Mines has developed a system for estimating mining and processing costs as a function of process feed rate with the objective of applying this system to abandoned mine tailings and
Jan 1, 1993
-
OFR-19-76 Development Of A Prototype Instant Working Level Meter With Automatic Individual Radon-Daughter Readout ? 1.0 IntroductionBy Peter G. Groer
The commonly used exact methods (1-2) to determine the WL measure the total a activity or the total number of a counts during three preselected time periods. Due to the half-lives involved (TRaB = 26.
Jan 1, 1975
-
OFR-31-86 Conveyor Belt Dust ControlBy Vinit Mody
The belt conveyor is one of the major pieces of equipment for transferring bulk material in mining operations. However, considerable amount of respirable dust may be generated whenever the bulk materi
Jan 1, 1984
-
Twenty-Four Conferences; More Than One-Hundred And Seventy Papers; Understanding Roof Bolt Selection And Design Still Remains PricelessBy Stephen C. Tadolini, Raymond A. Mazzoni
The International Ground Control Conference in Mining has always provided an open forum for the publication, presentation, discussion, and often heated debate on roof bolting systems mostly with atten
-
Analysis Of Sampling And Slurry Flow Using Multi-Physics Modeling - Preprint 09-058By D. McBride
Representative samples are required from process streams in order to accurately measure chemical and physical characteristics. This information can then be used by process operators and metallurgists
Jan 1, 2009
-
Fleet management system for underground mines (dd9c7c45-cd77-4292-966a-863f63e39c89)By R. Grimard, M. Gamache, L. -P. Bigras, P. Cohen
This paper describes a real-time fleet management system for an undergroun mine. Dispatching, routing and scheduling are handled simultaneously, taking into account the mine status, operational constr
Jan 1, 2004
-
Electronic Detonators Technology of the FutureBy Aloke Verma, R. Singh, S. Jana, C. Sawmliana, P. Pal Roy
On July 21, 2004, a trial blast using electronic detonators was conducted in India for the first time in an opencast mine at Pundi-E Quarry of TISCO, West Bokaro. Orica-IEL conducted the test using el
Jan 1, 2006
-
Innovative Use Of Piles For Retaining Sides Of Deep Excavations ? SynopsisBy D. V. Karandikar
Contiguous bored piles have been used in the past for retaining the sides of deep excavation. An innovative version of this method was adopted successfully in two prestigeous projects in Bombay in whi
Jan 1, 1996
-
Specifications For Initial Support In Rock TunnelsBy William F. Daly, William H. Hansmire
Installation of initial tunnel support is often the most uncertain element of work in the design of, and a contractor bidding on, construction of a rock tunnel. The risks the construction contractor a
Jan 1, 1985
-
Deep Excavation In The Shanghai Soft Clay Under Protection Of A Cast-In-Situ Retaining Wall ? SynopsisBy M. Pernot
A 12 m-deep excavation has to be perfomed in the Shanghai soft clay to install an underground electric substation. This article was originally intended to study the behaviour of the wall, the excavati
Jan 1, 2010