Search Documents

Search Again

Search Again

Refine Search

Publication Date
Clear

Refine Search

Publication Date
Clear
Organization
Organization
  • AUSIMM
    Machine learning at a gold-silver mine: a case study from the Ban Houayxai Gold-Silver Operation

    By P Stewart, S Cowie, A Offer, J Carpenter, E Jones

    The Ban Houayxai Gold-Silver Operation is a producing asset for Australian-based copper and gold producer, PanAust Limited. The Operation lies within PanAust’s 2600 square-kilometre Phu Bia Contract A

    Nov 21, 2018

  • AUSIMM
    Light Airborne Platforms for Monitoring Mines and Minerals

    By C Cavern, G Jacobs, F Durufle, L Ameglio

    Airborne geophysics and geomatics is at a crossroads as to whether it remains a viable mapping tool, both technically and commercially, and broadens its potential for new applications (eg environmenta

    Nov 4, 2015

  • AUSIMM
    Using Scenarios to Investigate the Long-term Future of Copper Mining and Guide Exploration Targeting Strategies

    By J P. Sykes, A Trench

    "The common-held view of the future of copper mining is one of declining quality of mineral resources and increasingly limited long-term development options. This decline, in turn, is viewed as inevit

    Jun 22, 2016

  • AUSIMM
    Relationships Between New Zealand, Australian and New Caledonian Mineralised Terranes: A Regional Geological Framework

    By C J. Adams, H J. Campbell, A J. Tulloch, I J. Graham

    New Zealand can be regarded as a rifted part of mineral-prospective eastern Australia. Geologically credible comparisons between selected trans-Tasman and SW Pacific geological provinces and units, es

    Jan 1, 2005

  • AUSIMM
    The Legacy of Underground Coal Mining – Mine Subsidence: Ipswich Coal Measures Case Study

    By B W. Ham

    The legacy of underground coal mining may be a land surface which, in parts, may be unstable in the long term. A case study analysis has been undertaken to explain some of the hazards and how the risk

    Jul 16, 2014

  • AUSIMM
    The Mineral Potential of the Hauraki Goldfield

    By R J. Merchant

    The Hauraki goldfield is located east of Auckland in the North Island of New Zealand. It includes Great Barrier Island, the Coromandel Peninsula and the Coromandel and Kaimai Ranges as far south as th

    Jan 1, 1984

  • AUSIMM
    Implementation of a Zoned Trigger Action Response Plan Associated with Changing Mine Conditions at Narrabri Mine

    By M Brady, O Salisbury, C Claassen, B Beamish, H Baxter

    Monitoring for signs of elevated spontaneous combustion in the active goaf behind the longwall face is crucial for early intervention of any potential heating incidents. Typically, trigger action resp

    Aug 31, 2015

  • AUSIMM
    Characterising the Reasons for the Difference in Performance of Two Ore Blends in Early Processing at OZáMinerals Prominent Hill Operation

    By D J. Bradshaw, E M. Wightman, C L. Evans, B Triffett

    During the commissioning phase of Prominent Hill, periods of reduced recovery were experienced with higher-grade ore blends. This was unexpected and as part of the process to identify the cause, surve

    Oct 29, 2012

  • AUSIMM
    An analysis of impact of weak rock formation on mining-induced deformation of rock slope

    By A Sainoki, D Fukuda, K Shioya, C Zhang, M Sharifzadeh, T Yamaguchi, S Saydam, J Kodama, C A. Amagu, Y Fuji

    In an open pit mining, ensuring stability of rock slope has been one of the major challenges. As the instability of rock slopes can results in slope failures; consequently, endanger the lives of worke

    Nov 29, 2022

  • AUSIMM
    Waterview Connection – Temporary Works for Tunnel Boring Machine?Launching

    By D Kubik, K The

    The New Zealand (NZ) Transport Agency’s Waterview Connection will complete Auckland’s Western Ring Route, a 47 km north–south motorway alternative to Stage Highway 1. The project is being delivered by

    Sep 17, 2014

  • AUSIMM
    Unlocking Plant Capability through Targeted Debottlenecking of Arrium’s Magnetite Concentrator

    By C Jenkins, M Mativenga, C Stanton, J Gerber

    In 2014, Arrium completed an optimisation program on its magnetite concentrator, enabling a reduction in the overall cost base of producing concentrate through an increased ability to treat a wider ra

    Jul 13, 2015

  • AUSIMM
    The Use of Fluvial Gold Morphology in Placer and Primary Source Exploration

    The morphological changes that gold undergoes during transport in gravel-bed rivers are a function of transport distance in particular, as well as bedload material, river gradient and velocity, and be

    Jan 1, 1998

  • AUSIMM
    The Golden Cross Project, Mill Closure, Mine Rehabilitation and Drainage Contract

    The Golden Cross project was a joint venture between Coeur NZ Ltd (80 per cent) and Viking Mining Company (20 per cent). The site is located in the Waitekauri Valley, 8 km north-west of Waihi, on the

    Jan 1, 2002

  • AUSIMM
    Improving coal quality estimations using geostatistics and auxiliary variables

    By P Dowd, R Jeuken, C Xu

    In Australian coalmines there are a number of coal quality parameters that are measured by analysing samples from boreholes. The data points are used to generate spatial models of these parameters, ty

    Sep 20, 2017

  • AUSIMM
    Reopening and Production Planning of Kirdar - Yoncali Quarry, Turkey

    This paper presents a study about reopening of a quarry near to the geothermal region of Kntahya, Turkey. The production method was gallery blasting which resulted in very high ground vibrations. Ther

    Dec 6, 2010

  • AUSIMM
    Kopanang Mine Rail Haulage Tramming System

    With the theme of û æUnderground Ore Handling SystemÆ, Kopanang Mine completed an extensive project on a specific system with technologies for the handling of ore from a dedicated drawpoint to the sha

    Jan 1, 2005

  • AUSIMM
    The-Application of Optimal Control to Open-Pit Planning

    Preliminary work being undertaken on the optimisation of decision strategies for an open-pit metalliferous deposit is presented. The Optimal Control method has been selected rather than the easier to

    Jan 1, 1984

  • AUSIMM
    Design and Engineering of Flotation Circuits (in Australia)

    By D Mcleod, S Brindley, S Green

    The design and engineering of flotation circuits is driven by numerous inputs, including (in no particular order) testwork outcomes, site considerations, type of separation required, energy sensitivit

    Jan 1, 2005

  • AUSIMM
    Improvements in estimating strengths of loose tailings: results from the TAILLIQ research project

    By D Reid, J Vinod, M Rahman, A Fourie, T Vo, J Ayala, A Russell

    This paper reports on an industry and Australian Research Council funded research project, TAILLIQ, that is a joint initiative between four Australian Universities. The paper discusses the accuracy wi

    Jul 1, 2021

  • AUSIMM
    Application of implicit geological modelling to improve the grade control process at White Mountain gold mine, Jilin Province, China

    By S McKinley

    "The White Mountain sediment-hosted gold deposit is located in north-eastern China. Mineralisation is associated with silica–hematite–altered polymict breccias that occur within dolomite at or near th

    Sep 20, 2017