Search Documents

Search Again

Search Again

Refine Search

Publication Date
Clear

Refine Search

Publication Date
Clear
Organization
Organization
  • AUSIMM
    Grinding and Flowing Investigation on Dry Stirred Ball Milling in Order to Determine the Influence of Grinding Aids

    Grinding and Flowing Investigation on Dry Stirred Ball Milling in Order to Determine the Influence of Grinding Aids Huge difficulties of the great ultra fine ground material production in dry stirred

    Sep 13, 2010

  • AUSIMM
    The Influence of Particle Shape in Rock Fracture

    The Influence of Particle Shape in Rock Fracture

    Sep 13, 2010

  • AUSIMM
    Sustainable Carbon in Steel Making - Plant Trials at the Sydney Steel Mill

    OneSteel and BlueScope Steel have been working with the CSIRO to develop sustainable carbon fuels and reductants which are suitable for use in the iron and steel industry. One of the initial focuses o

    Jun 1, 2010

  • AUSIMM
    Proposed Model for High Speed Diamond Cutting of Hard Rocks

    By B Bamford

    High speed diamond cutting has extensive applications in civil and mining engineering. A project involving the diamond sawing of black granite is investigating the nature of the diamond cutting proces

    Jan 1, 1992

  • AUSIMM
    Flotation Performance Improvement by Air Recovery Optimisation on Roughers and Scavengers

    Flotation Performance Improvement by Air Recovery Optimisation on Roughers and Scavengers

    Sep 13, 2010

  • AUSIMM
    Blast movement monitors or polypipe? A study into cost-effective blast movement monitoring at White Foil gold mine, Western Australia

    By M E. Watson

    Minimising dilution and ore loss is an important part of ensuring profitability of a gold mining operation. White Foil open pit gold deposit is a low-grade deposit and therefore managing ore quality i

    Sep 20, 2017

  • AUSIMM
    A Brief Resume of the Smelting Plant

    THE Company's smelting equipment consists of three blast furnaces, supplied with blast from two sets of vertical piston blowers, each capable of delivering 8000 cub. ft. of air per minute at a pr

    Jan 1, 1918

  • AUSIMM
    Blasting at the Mt Wellington Quarry - 1997-1999

    By M Lentz

    This paper will discuss the issues associated with blasting in an urban mining environment that have been addressed by Winstone Aggregates at the Mt Wellington Quarry. These issues include - control o

    Jan 1, 1999

  • AUSIMM
    Lead Removal from Contaminated Soils with Chelating Agents

    Lead Removal from Contaminated Soils with Chelating Agents

    Sep 13, 2010

  • AUSIMM
    Erosion Driven Isostatic Flexure: A Structural Model for Gold Mineralisation in the Otago Schist, New Zealand

    By R H. Sibson

    The gold

    Jan 1, 1995

  • AUSIMM
    Depth Distribution of Ore in the Martha Epithermal Au-Ag Deposit, Waihi

    The Martha deposit is an economic giant epithermal gold deposit, with mined and unmined resources of more than 218 000 kg (7 Moz) Au. The Au-Ag, base metal sulphide-bearing quartz lodes in the Martha

    Jan 1, 2006

  • AUSIMM
    Relocatable modular beneficiation creates value from waste

    By T Graham

    Traditional iron ore wet beneficiation plants are large multilevel structures, often integrated into centralised processing plants. They are characterised by sizeable footprints, substantial water and

    Jul 24, 2017

  • AUSIMM
    Risk and Alternate Dispute Resolution Options for Mining Companies Operating in South East Asia (Including a Case Study)

    By K Broadley

    Risk and dispute resolution are linked. Dispute resolution techniques are brought to bear on a dispute - which is an outcome of a risk being wholly or partially realised. There has been an increasing

    Jan 1, 1999

  • AUSIMM
    Flotation Circuit Analysis at WMC Ltd Olympic Dam Operation

    By P Wigley

    New methods of analysing and modelling flotation circuits have been developed as part of the AMIRA P9 mineral processing research project. A study using these techniques was conducted on the Olympic D

    Jan 1, 2003

  • AUSIMM
    Emerging Relationships Between Mineralised Plutonic Terranes in New Zealand And Eastern Australia

    By J Ramezani, K Faure, N Mortimer

    Western New Zealand can be regarded as a rifted continuation of eastern Australia. Detailed studies of units previously considered to have trans-Tasman correlations are being undertaken within the FRS

    Jan 1, 2007

  • AUSIMM
    Alluvial Drilling - Mikonui River

    During an eight month period, January to August 1978, nine bore holes were drilled in the Mikonui River gravels. On account of two rebores required from near bottom, the number of bores is in eff

    Jan 1, 1979

  • AUSIMM
    Equipment Selection - What is the Issue? What About the Application of Simulation Packages?

    The selection of the mining fleet can have as much of an effect on the efficiency and effectiveness of an operation as the mining method. This is not to say that inefficiencies are only attributable t

    Dec 6, 2010

  • AUSIMM
    Thermodynamics of Non-Cyanide Gold Solvents

    Thermodynamics of Non-Cyanide Gold Solvents The present status of the raw material base in the gold industry requires specific ways to recover gold and silver from ores. Most gold is closely associat

    Sep 13, 2010

  • AUSIMM
    A Novel Measurement for the Internal Operation of a Semi-autogenous Mill Using Acoustic Sensors – A Case Study

    By R A. Pax, B Cornish

    Increasing the throughput of the MMG Century operation by over 25% from past practice to preserve cash flow close to the end of life of mine has revealed new throughput and load dynamic instabilities

    Sep 7, 2015

  • AUSIMM
    New Sampling Technologies for Ore Grade Control, Metallurgical Accounting, and Laboratory Preparation

    The optimisation of a mining operation requires precise ore grade control, metallurgical accounting, and laboratory sampling protocols, which are implemented by using accurate and flawless sampling sy

    Jan 1, 2004