Search Documents

Search Again

Search Again

Refine Search

Publication Date
Clear

Refine Search

Publication Date
Clear
Organization
Organization
  • AUSIMM
    Developments at MHD 'Berzelius' Duisburg

    By Tack K

    During its 28-year life the MHD ISP smelter has gone through two phases, each of about a dozen years. The first phase was a learning one; in the second phase the lessons were applied and throughput

    Jan 1, 1993

  • AUSIMM
    Hydraulic Pressure Information Monitoring System for Underground Supports

    By Lin Bin, Qain Minggao, Qu Qundi, Yao Zhichang

    This paper describes the application of a 89C52 chip microcomputer in hydraulic pressure information monitoring system of powered supports in a coal face, and the details of circuit and software of

    Jan 1, 1998

  • AUSIMM
    Elasto-Plastic Finite Element Structural Stability Analysis of Room and Pillar Mine Workings

    By Porter I, Singh RN

    An advanced elasto-plastic finite element model adopting a modified Von Mises yielding criterion was used to simulate progressive failure of the rock strata surrounding a room and pillar mine struc

    Jan 1, 1992

  • AUSIMM
    Autogenous Grinding in the Warrego Concentrator of Peko Mines N.L.

    By Stevenson C. H, Lynch A. J

    The reasons for choosing autogenous grinding for the new Warrego concentrator of Peko Mines N.L. are discussed and the ores to be treated in the concentrator are described. The mill was designed on t

    Jan 1, 1974

  • AUSIMM
    Blast Monitoring : From Detonation to Impact

    The intention of this paper is to examine the practical and technical aspects associated with the measurement of blasting related phenomena. The emphasis is directed towards the acquisition of quan

    Jan 1, 1990

  • AUSIMM
    Geostatistical Modelling of Geometallurgical Variables - Problems and Solutions

    By C V. Deutsch

    "Geometallurgical variables often cause problems to conventional geostatistical workflows. There are many variables; some are compositional and some are non-additive. They often show: complex multiva

    Sep 29, 2013

  • AUSIMM
    Assessment of Mechanical Parameters of Rock using an Indentation Test

    By Donald D

    A number of standard tests are conventionally carried out to characterise strength properties of rock. The values of the parameters obtained are often affected by planes of weakness or defects in ro

    Jan 1, 1996

  • AUSIMM
    Viscosity and Composition Relationships in Kalgoorlie Nickel Smelter Slags

    By Segnit ER, Boow J

    The start up operations of Western Mining Corporation's Kalgoorlie nickel smelter encountered troubles due to the high magnesia content of the concentrates. The flash smelter slags, with highe

    Jan 1, 1980

  • AUSIMM
    Water Flow in Uncovered Waste Rock ù A Multi-Year Large Lysimeter Study

    By L Smith, R Beckie

    An intermediate scale (8 m + 8 m + 5 m high) constructed waste rock pile experiment was built upon a contiguous grid of 16 gravity drainage lysimeters to investigate the flow of water in unsaturated w

    Jan 1, 2003

  • AUSIMM
    Characteristics and Sintering Performance of Iron Ore Sinter

    By T Raynlyn, A Edenton, M Adam, R J. Holmes, J R. Manuel, N Ware, R Smyth

    Due to ongoing demand and increasing depletion of high-grade iron ore resources from large deposits, Australian iron ore producers are developing smaller size deposits to maintain current export level

    Jan 1, 2009

  • AUSIMM
    Balancing Competing Water Resource Demands and Mining in a Coastal Environment

    The mining of mineral sands in coastal aquifers is often constrained by other land use conflicts and inappropriate controls imposed through a lack of understanding of environmental interactions and

    Jan 1, 1988

  • AUSIMM
    Review of Ground Support Systems at King Island Scheelite

    By Nag D. K

    King Island Scheelite is a wholely owned subsidiary of Peko-Wallsend Ltd. The company works two underground mines near the southern end of King Island at the western approach to lass Strait, 240 k

    Jan 1, 1981

  • AUSIMM
    The Initiation of Primers by Detonating Cord

    The initiation of cast Pentolite primers by detonating cord has been examined by the combination of two different experimental techniques with computer simulation by the finite element hydrodynamic

    Jan 1, 1988

  • AUSIMM
    Options for Incorporationg High-Pressure Grinding Rolls into Comminution Circuits

    By Weller KR

    A study of high pressure rolls grinding of a number of Australian ores and minerals has been carried out using a pilot-scale machine with rolls 300 mm diameter and 70 mm wide. The results from this

    Jan 1, 1991

  • AUSIMM
    Drilling and Blasting Operations at the Kennedy Siltstone Open Cut of Mount Isa Mines Limited

    The Kennedy Siltstone Open Cut provides graded rock for stope filling. Rotary drilling of 310 mm blastholes with a Gardner Denver GD120 is used, and the successful application of an equilateral tri

    Jan 1, 1978

  • AUSIMM
    A Study of Crystal-Morphological Properties of Zirconium-Containing Minerals and Development of their Effective Recovery Methods from Ores

    By Nevolina VG, Zakharova IB

    The results of a study on the flotation of baddeleyite and associate minerals are presented, together with effective flotation reagents. Detailed microcrystallomorphological analysis of the benefica

    Jan 1, 1993

  • AUSIMM
    The Reduction of Greenhouse Gases by Combustion Catalysis

    The reduction in man's contribution to the Greenhouse effect will only be achieved by a number of small steps. Some steps will absorb carbon dioxide (CO2) from the atmosphere in slightly great

    Jan 1, 1989

  • AUSIMM
    Maximising Recovery at Silver Swan Nickel Mine using Cement Stabilisation

    By P R. Lock

    The Silver Swan nickel mine is located at the Black Swan Nickel Project, 53 km north east of Kalgoorlie, Western Australia. The Silver Swan orebody is a massive sulphide nickel deposit dipping 70¦ eas

    Jan 1, 1998

  • AUSIMM
    Evaluation of Solids Suspension in a Pilot-Scale Mechanical Flotation Cell

    By D A. Deglon

    Solids suspension is important in the design and operation of mechanical flotation cells, and is a necessary precondition to particle collection. Most of the fundamental hydrodynamic research that inc

    Jan 1, 2005

  • AUSIMM
    Evaluation of Cyclical Voltammetry as an Electrolyte Screening Technique

    By Grady B. V O, Cavell K. J, Ault A. R, Newman O. M G, Malcolm J. McPhersqn

    Cyclic voltammetry (CV) has been evaluated as a technique for monitoring the quality of an industrial zinc sulphate electrolyte. The basis of the method involves measuring a change in the polarisati

    Jan 1, 1993