Search Documents
Search Again
Search Again
Refine Search
Refine Search
- Relevance
- Most Recent
- Alphabetically
Sort by
- Relevance
- Most Recent
- Alphabetically
-
The influence of rock mass defects on pit slope design at the Ok Tedi mine, Papua New Guinea
The Ok Tedi open pit mine will have final wall heights in excess of 750m. The behaviour of these excavated slopes will be influenced by the presence of numerous defects. This paper discusses the ident
Jan 1, 1994
-
The Causes of Heavy Mineral Loss From Mineral Sands Wet Concentrators
By Alford R. A
The causes of the loss of heavy mineral from mineral sands wet concentrators were identified through detailed surveys of two such concentrators. It was found that tray and spiral sluices preferentiall
Jan 1, 1991
-
The Cretaceous Paleogeology of the Taranaki û Cook Strait Area
Cores of pre-Tertiary basement from ten oil exploration wells are related petrologically to the "axial", "marginal" and "shelf" facies of the New Zealand Geosyncline.A NW
Jan 1, 1967
-
Geohydrological Containment System and Microbial Water Treatment Plant for Metal-Contaminated Groundwater at Budelco
By Buisman C. J N, Koch R. O
Soil and groundwater beneath the Budelco zinc production plant at Budel-Dorplein (The Netherlands) are contaminated with metals and sulphate. To avoid contamination of nearby drinking water aquifers
Jan 1, 1993
-
The Commercial Application of the New Two-Stage Jones WHIMS Process for Martitic Iron Ores at the Fßbrica Mine of Ferteco Mineratpo SA, Brazil
By Heyer T, Wasmuth H-D
The concentrator plant of Fahrica Mine, that started production in 1977, was using nine Jones wet high intensity magnetic separators (WHIMS) of the standard type DP 317 with a 1.5 mm gap width for t
Jan 1, 1993
-
Ore Pass and Chute Maintenance at Xstrata Copper ù Mount Isa Copper Operations
By L E. Krause
This paper discusses the considerations for optimum maintenance of critical ore handling infrastructure in order to minimise the cost to the business of maintenance periods. As maintenance periods are
Jan 1, 2005
-
Improvements in Process Control and Instrumentation at Batu Hijau
By B Dunstan, F Wirfiyata
PT Newmont Nusa Tenggara (PTNNT) operates the Batu Hijau copper and gold mine and process plant on the island of Sumbawa, Nusa Tenggara (Barat) NTB, Indonesia. The plant consists of a nominal ca
Jan 1, 2009
-
Assessment of Subsidence Mechanisms and Risk From the Waihi Underground Mine Workings, New Zealand
By L Richards, R L. Brathwaite, C Mazenga
Underground mining of gold-silver bearing quartz lodes was carried out in the great mines at Martha Hill, Waihi over 70 years from 1882 until 1952. Shafts and stopes reached a total depth of 600 m on
Jan 1, 2003
-
Sublevel Shrinkage – the Mt Wright Story
By S Long, A J Koen, D MacKay
The Mt Wright Underground Mine is located near the town of Ravenswood in North Queensland and is operated by Carpentaria Gold – a wholly owned subsidiary of Resolute Mining Limited. Following the evol
Mar 24, 2014
-
Geochemical Study of the Itabirite Iron Ores of the Alegria Mine ù Quadrilßtero Ferrffero, Minas Gerais, Brazil
By F R. M Pires, Y Hasui, A Schrank
The iron ores of Alegria mine are composed of itabirites enclosing minor bodies of high-grade ores. The itabirites are classified according to mineralogical composition in five types: martite-rich, go
Jan 1, 2002
-
Goonumbla: 25 Years, Four Deposits, 52 Prospects and Still Drilling...
The Central West of New South Wales is emerging as a significant metallogenic province. The development of Northparkes Mines (North Limited) and the Cadia Hill deposit (Newcrest) are establishing N
Jan 1, 1997
-
Structural and Metamorphic Framework of the North D'Aguilar Block, Southeast Queensland
By Dobos SK, Gibson GM, Little TA, Sliwa R
Current studies, and analysis of previouslypublished data, have lead to a re-evaluation of the inclusion of the North D'Aguilar block within the "Gympie Province" in southeast Queensland. The met
Jan 1, 1990
-
Designing for Maximum Production from Trucks and Loaders
In many mining operations, the truck and loader equipment represents the bulk of the invested capital and the majority of the mine operating cost. The profitability of these mines is therefore crit
Jan 1, 1983
-
Paper No. 188. A Graphic Method of Computing Mine Values.
THOSE who have had occ.asion to sample a mine not infrequently find that it is impossible to take their sample cuts at regular distances apart, owing to the ground being close timbered, a stope having
Jan 1, 1911
-
Behaviour of Magnetite in the Flash Smelting Furnace with Furnace Electrodes at Tamano Smelter
By Muto S, Okada S
At Tamano Smelter, part of the furnace settler is electrically heated by electrodes placed internally. This practice provides good control of the settler conditions. The authors have been investiga
Jan 1, 1980
-
Prediction of Erosion Losses From Strip mine Spoil Piles Using Computer-Based Model
By Rose CW
Typical rehabilitation programmes for spoil piles and waste dumps in open cut coal mines involve the spreading of topsoil to assist vegetation growth. In the early years of rehabilitation before a
Jan 1, 1983
-
The Loy Yang Overburden System
The Loy Yang Overburden System initially consists of a 60 000 tonne/day Bucket Wheel Excavator (BWE) (No. 14), a 2 m wide Conveyor System and a Travelling Stacker (No. TS4). The paper discusses deta
Jan 1, 1982
-
Three-Dimensional Modelling of the Central Extended Gold Deposit - Analysis of Structural Controls on Mineralisation
The Central Extended Orebody is located within the Cracow Goldfield approximately 360 km northwest of Brisbane and approximately 220 km west of Bundaberg. It is an epithermal gold deposit hosted by th
Jan 1, 1993
-
The Murrin Murrin Nickel Cobalt Project
By Fazakerley VW
The Murrin Murrin deposit is located about 210 km NNE of Kalgoorlie and 50 km E of Leonora in the North Eastern Goldfields region of Western Australia at latitude 28¦ 50'S. longitude 121¦ 54&a
Jan 1, 1996
-
The Direct Filling of 1100 Orebody Stopes from Surface at Isa Mine
In early-1989, subsidence due to voids at the top of previously filled stopes and stopes awaiting filling,began to threaten the 15 level fill conveyor horizon. This together with the need to maintain
Jan 1, 1992