Search Documents
Search Again
Search Again
Refine Search
Refine Search
- Relevance
- Most Recent
- Alphabetically
Sort by
- Relevance
- Most Recent
- Alphabetically
-
Research into Alluvial Gold Recovery in Alaska and the Yukon Territory
Alluvial gold mining is thriving in the Yukon Territory and Alaska. The scale of many operations is similar to those in New Zealand but there is greater government support for research and test work.
Jan 1, 1989
-
Review of Metal Accounting Methods for In-Process Metal Inventories
By L Lachance, F Flament, D Leroux, S GariTpy
"Considerable metal values are often locked in stockpiles (ore, concentrates, heap leach pads, slags, reverts, etc.) and process equipment (bins, holding tanks, thickeners, etc.). This is more than en
Jul 15, 2013
-
Reconciliation of the McKinnons Gold Deposit, Cobar, New South Wales
By Snowden D. V, Standing C. A, Ryba A, Bywater A
McKinnons open pit gold mine, located within the Cobar Basin in New South Wales, is characterised by complex mineralisation controlled by the intersection of steep faults in the hinge zone of an ant
Jan 1, 1997
-
Geophysical Characteristics, Deep Structure, Magmatism and Metallogeny of the Pacific Belt
By L A. Maslov
We have considered the following characteristics of the crust and upper mantle of the Pacific Belt: seismic wave velocity anomalies, mechanical stress and shear deformation rate fields, heat flow and
Jan 1, 1995
-
Transformation of Iron Oxide By-products During the Becher Process
By Muir DM, Ritchie IM, Gibbons SL
Fundamental studies on the transformations of iron oxides have been carried out and related to the solution conditions in the Becher Process. The results show that a number of iron oxide interconve
Jan 1, 1989
-
Environmental Investigations of the Effects of the Ok Tedi Copper Mine in the Fly River System
By Higgins RJ
Environmental investigations have been undertaken by Ok Tedi Mining Limited (OTML) since 1981 when the Ok Tedi Environmental Study was commenced. Environmental monit- oring and management programme
Jan 1, 1991
-
Steam-Fluidised Bed Drying and its Significance for Electricity Generation and Gas Production in the Latrobe Valley
Currently raw brown coal is fired in the Latrotx; 'ahcc th,iki~, Lanying with it two major penalties, (a) boiler efficiency of 65 - 70 per cent (in terms of GCV), (b) much higher boiler cost th
Jan 1, 1992
-
Underground Mining at the Golden Cross Mine
The modern Golden Cross mine entered the production phase in January 1992. The project is designed to produce over 100 000 oz/yr of gold and over 300 000 oz/yr of silver during a mine life of eight ye
Jan 1, 1994
-
Development of Stockton Borehole Colliery
The early history of the mine is traced from the beginning of shaft sinking in 1886 to the purchase by the Broken Hill Proprietary Co. Ltd. in 1949. A necessary preliminary to mechanisation of the Bor
Jan 1, 1957
-
On Mining and Metallurgical Education
In New York City, on the walls of the library of the United Engineering Societies are these words:"Engineering-the art of organising and directing men and of controlling the forces and materials
Jan 1, 1941
-
Tectonic setting of some mineral deposits of the New Guinea Region
Mineral deposits of the central New Guinea region (Gunung Bijih, Ok Tedi, Mount Kare, Porgera, Frieda River) and of southeastern New Guinea (Wau-Edie Creek, Wafi, Hamata, Hidden Valley, Tolukuma,
Jan 1, 1991
-
Improved Ground Control Using Hydro Scaling and In-Cycle Shotcrete
By B Upton, J Mitchell
The use of hydro scaling and in-cycle shotcrete to replace conventional jumbo scaling, mesh and bolting as the primary method of ground control for run of mine development has been investigated throug
Jan 1, 2005
-
Metallographic Study of Heat-Treated Chrome Ore Briquettes
By Tripathy A. K, Satapathy B. K, Nayak B, Mohanty J. N, Dey D. N
The paper deals with the metallographic tudy of heat treated chromite and chromite-coke composite briquettes. The briquettes, prepared from chromite concentrate of Orissa Mines using molasses-lime, de
Jan 1, 1987
-
Supervisory Control of Bass Strait Oil and Gas Production (450e3b8f-9404-4d30-9400-edb9f950a46d)
Esso-BHP have installed a production supervisory control system that is presently controlling the offshore oil and gas facilities on the Barracouta and Marlin platforms from an onshore master station.
Jan 1, 1971
-
Strategic Optimisation at Sierra Rutile - A Case Study in Maximising Project Value
By P Myers, T Elkington, S Wonday
Sierra Rutile LimitedÆs (SRL) heavy mineral sand mining operation in Sierra Leone, West Africa, is embarking on a new phase of its life. After confronting many challenges during the 1990s and 2000s, S
May 24, 2012
-
Characterisation of Bedded and Channel Iron Ore Deposits Using CSIRO’s HyLogging™ Systems
By M Haest
This study demonstrates the application of HyLogging™ technologies for mineralogical characterisation of different iron ore types throughout the Hamersley Province (Western Australia), including a cha
Jul 11, 2011
-
Preparing for Uncertain Mineral Futures - A Survey of AusIMM Members on the Future Issues and Drivers for the Australian Minerals Industry
By C Mason, A Littleboy
This paper presents the results of a large scale survey of The Australasian Institute for Mining and Metallurgy (AusIMM) membership. This survey aimed to understand and define the key issues and drive
Jan 1, 2009
-
Case History of the Discovery of the Hishikari Gold Deposit, Japan
The Hishikari gold deposit, discovered by the Metal Mining Agency of Japan, has become a giant class epithermal gold deposit with the highest grade of gold yet recorded in the world through detailed e
Jan 1, 1995
-
Government Coodrination and Liaison: The Lihir Project
By Van Dusen M
The involvement of concerned parties in all aspects of the Lihir Project from an early stage has promoted good relations between all groups. Activities involving landowners, the Lihir community, t
Jan 1, 1991
-
A Single Compartment Cell for the Electrolytic Production of Aluminium from Molten Chlorides
A single compartment 100 A electrolytic cell charged with AICla-KCl-NaCl at 750°C was studied during an experimental campaign of 4 months. About 10 1b of aluminium were produced in continuous run
Jan 1, 1971