Search Documents

Search Again

Search Again

Refine Search

Publication Date
Clear

Refine Search

Publication Date
Clear
Organization
Organization
  • AUSIMM
    Engineering the New Olympic Dam Backfill System

    By A G. Grice

    WMC Resources Pty Ltd û Copper Uranium Division operates the large underground Olympic Dam Mine at Roxby Downs, South Australia. These operations mine and process the ore to produce refined copper, ur

    Jan 1, 2000

  • AUSIMM
    Use of variography to measure improvement of sampling practices for the quality control of graphite consistency in marble used for carbon-sensitive applications

    By C Haughy, F F. Pitard

    Blue Mountain Minerals is a large supplier of calcium carbonate products used by various manufacturers as a major raw material. Very small amounts of free carbon in the rock can have a huge impact in

    May 9, 2017

  • AUSIMM
    Jig Concentrating at Broken Hill, New South Wales, with Special Reference to Broken Hill South Ltd.

    THE nature of the ore deposit of the Broken Hill line of lode is such that it can be broadly divided into two the calcitic and siliceous ore bodies. The principal minerals occurring in these ores are:

    Jan 1, 1928

  • AUSIMM
    Nova copper-nickel project optimisation of the copper rougher-scavenger circuit through advanced measurement and control

    By M Thompson, N Vines, Z Hearne, S Lam, G A. Gomes-Sebastiaõ, D van der Spuy

    Construction and commissioning of the Nova Copper-Nickel project of Independence Group was completed in late 2016. The plant is in the Fraser Range of Western Australia, about 120km east of Norseman a

    Aug 29, 2018

  • AUSIMM
    Flotation Practice at Mount Lyell

    THE flotation plant at Mount Lyell was erected, primarily, for the treatment of ore from the Lyell Comstock mine. These workings are situated over a mile in a direct line north of the North Mount Lyel

    Jan 1, 1920

  • AUSIMM
    Mineral Resource Assessment of the Coromandel Region, New Zealand

    By D N. B Skinner, R L. Brathwaite, M S. Rattenbury

    The Institute of Geological and Nuclear Sciences Ltd has carried out a mineral resource assessment of the Coromandel region, one of the most mineral-rich regions of New Zealand. The assessment focusse

    Jan 1, 2001

  • AUSIMM
    A Cause of Refractory Gold in Desulphurised Pyritic Concentrates

    The refractory nature of residual gold in Kalgoorlie calcines is caused by occlusion in dense pyrrhotite formed by fusion within pyrite grains during decomposition. Fusion of pyrite increases as the r

    Jan 1, 1957

  • AUSIMM
    Permitting the Grey River Dredge

    By E Breese

    The Grey River dredge is the first large scale alluvial operation to be permitted under the Mining Act 1971 and the Water and Soil Conservation Act 1967. The experience of Grey River Gold MiningLimite

    Jan 1, 1989

  • AUSIMM
    Subtek™ 4D™ – Optimised blasting performance through the application of new underground bulk explosive technology

    By B Taylor, S Evans

    Bulk explosive technology for underground mining has not seen any significant technological advances since the widespread transition from ammonium nitrate fuel oil (ANFO) to ammonium nitrate emulsions

    Sep 1, 2024

  • AUSIMM
    The Nature and Utilization of Iron Blast Furnace Slags

    The term slag has been used to define a wide variety of material including mine spoil and slag produced at steel plants. The present paper is concerned only with the non-metallic alumino-silicates dev

    Jan 1, 1964

  • AUSIMM
    Presidential Address, 1955

    The first mention of gold in Western Australia was in 1848 when some specimens of copper ore, which are believed to have come from the Murchison district, were sent to Adelaide for assay. Gold was pre

    Jan 1, 1956

  • AUSIMM
    Sustainable Water Supply Development in Central South Australia

    OZ Minerals Limited owns and operates the Prominent Hill Copper-Gold Mine, located 140 km southeast of Coober Pedy in far north South Australia. The Prominent Hill mine comprises an open cut mine with

    Jun 1, 2010

  • AUSIMM
    Research and Application of Vertical Screw Stirred Mill

    Research and Application of Vertical Screw Stirred Mill

    Sep 13, 2010

  • AUSIMM
    The Metallurgical Treatment of the Sulpho-Telluride Ores of Kalgoorlie, with Special Reference to Experiments Conducted and Sulphide Mill Erected on the Associated Gold Mines of Western Australia Limited

    The sulphide ores of the principal lodes of the Boulder Mines are mainly composed of a schistose guess with a varying proportion of silica and lime, containing tellurides of gold, silver and mercury,

    Jan 1, 1901

  • AUSIMM
    Mineral Processing Engineering Education in China - Bringing up the Engineering Diathesis and Design Competence of the College Students

    Mineral Processing Engineering Education in China - Bringing up the Engineering Diathesis and Design Competence of the College Students

    Sep 13, 2010

  • AUSIMM
    Geochemistry of Wallrock Alteration at the Golden Cross Deposit, New Zealand

    By J L. Mauk

    Golden Cross is a volcanic-hosted, low-sulfidation, epithermal Au-Ag deposit in the Hauraki Goldfield. Irrespective of the rock type (andesite versus dacite), hydrothermally altered wallrocks are enri

    Jan 1, 2000

  • AUSIMM
    Effectively Installing and Commissioning Flotation Equipment

    By B Murphy, J L. Heath

    Installation of flotation equipment is a lengthy and intricate process involving conceptual design, detailed design and layout, equipment installation, equipment commissioning and handover prior to th

    Sep 1, 2014

  • AUSIMM
    Gravity Flow Full-scale Tests at Esmeralda Mine’s Block-2, El Teniente

    By D Garcés, M Meléndez, R Castro, E Viera

    Enhancing the understanding of gravity flow in caving operations is a key factor in the design, operation and success of caving methods. Consequently, much research has been performed to increase know

    May 9, 2016

  • AUSIMM
    Au-Ag Recovery from Complex Ore by Flotation

    Au-Ag Recovery from Complex Ore by Flotation

    Sep 13, 2010

  • AUSIMM
    Confidence Levels In Estimates

    Traditionally, capital costs of major resource development projects have been estimated as a single amount to which a percentage accuracy has been assigned based on the method of preparation of the es

    Jan 1, 1990